Loading…
Loading…
839 live346 closing this weekmost from National Highways Authority of India and Ministry of Road Transport and Highways
839 results • Best match
Landslide treatment work from Km. 7.020 to Km. 7.160 (1 location) on Narendranagar Ranipokhri Motor Road (SH-77) in District Tehri Garhwal under EPC mode.
Landslide treatment work from Km. 9.070 to Km. 9.250 (1 location, Jajred) on Kalsi Chakrata Motor Road (SH-20) in District Dehradun under EPC mode.
PROVISION OF GENERAL ENGINEERING ANCILLARY BAY AGGREGATES RESET DEPARTMENT NO. 02 AND STRIPPING, WASHING AND DEGREASING BAY FOR AB WKSP AT DELHI CANTT EPC MODE
Construction of Biosafety Level (BSL)-3 laboratory under PM ABHIM for NCDC at CRI Kasauli, Solan District, Himachal Pradesh in EPC Mode-1 (Fourth Call).
Construction of 2 Lane Bridge at Km 21.206 and Km 26.983 at Bargarh District on NH-26 in the State of Odisha under EPC Mode
One Time Improvement (OTI) of NH-29E from km. 81.420 to km. 98.935 (Length 17.515 Km.) under EPC mode in the State of Uttar Pradesh.
Up-gradation of Patna Medical college and Hospital, Patna under PMSSY Phase-IV on Engineering, Procurement and construction EPC Basis SH. Construction of Main building works inlcluding Ramp, Water Supply, Sanitary Installation, Internal Electrical Installatioins, Fire Fighting with Sprinkler System, Central Air Conditioning System, Internal Road and Paths, Drainage, Horticulture Operations,Street Lighting, Submersible and Booster Pump etc. Sub work. Designing , providing fabricating , transporting, erecting and fixing in position of connecting corridor at 7th floor level of the building at risk and cost of the running agreement.
Construction of Multi-purpose Cargo Berth (Berth no 17) with allied civil works at New Mangalore Port, on EPC basis
Design, supply, installation, testing and successful commissioning of Modernization of Command Area Development at Kaksar Cluster Kargil (EPC Mode) (Under M-CADWM Scheme in UT Ladakh)
White topping of Existing Internal road of Dhule City Length 8 00 Km bypassed section of NH 53 in the State of Maharashtra on EPC Mode
Construction of FOB at Munda Sahi, Jarapada, Katada, Luhamunda , handpa and katibari on Angul Sambalpur of NH 55 in the state of Odisha on EPC Mode
Strengthening work in KM 14.20 to 25.53 and 31.54 to 55.70 JAGDALPUR - SUKMA - KONTA ROAD on NH-30 in the State of Chhattisgarh on EPC mode.
Construction of Multi Use Office Complex for Great Nicobar Island Township Project at Campbell bay i/c IEI in EPC mode-I (Design and Build Basis).
Authority Engineer for supervision of Construction of road from Taliha to Tato section of Frontier Highway NH 913 km 87.13 to 121.541 34.411km on EPC mode
Landslide treatment work from Km. 2.025 to Km. 2.295 (1 location) on Kathgodam Haidakhan Sanniband Similiya bend Motor Road (SH-103) in District Nainital under EPC mode.
Six laning of Atkadih to Gorhar Section of NH 19 (Old NH 2) from Km 320.800 to km 326.160 in the State of Jharkhand on EPC Mode
Balance Works of 4 lane Bangalore Chennai Expressway from Arakkonam to Kancheepuram (Km 204.500 to Km 230.000) (Phase III/Package III) in Tamil Nadu on EPC Mode.
Strengthening work from 0.00 (Paswan chowk) to 58.450 (Musharigharari) of NH 103 (New NH 322) on EPC Mode in state of Bihar Repair on Risk and Cost.
Authority Engineer for supervision of Construction of road from Lada Sarli section of Frontier Highway NH 913 Bameng Khenewa 43.65 to 85.60 41.950 km on EPC mode
Authority Engineer for supervision of Construction of road from Huri Taliha section of Frontier Highway NH 913 km 160.750 to km 209.9 49.15 km on EPC mode
Authority Engineer for supervision of Construction of road from Huri Taliha section of Frontier Highway NH 913 from km 55.725 to 113.25 57.525 km on EPC mode
Authority Engineer for supervision of Construction of road from Huri Taliha section of Frontier Highway NH 913 from km 113.25 to 160.75 47.500 km on EPC mode
Engineering, Procurement and Construction (EPC) Agreement with Schedule G-1 For third line track between Manikpur (excluding) to Iradatganj (including) (Ch: 1257.180 to 1340.820) including Electrification & Signaling works along with construction of ROB on LC No. 404/C2, 406/2T, 407/2E & 418C/2E and RUB in LC no 426 in connection with Manikpur-Iradatganj 3rd line project of North Central Railway
Procurement, Supply, Erection and Commissioning of Supplementary Mining Plant (SMP - 5) at Orissa Sand Complex (OSCOM), Chatrapur, Ganjam, Odisha on EPC Basis
EOI Document for Prebid Tieup for Selection of Consortium Partner for Design Supply InstallationTestingCommissioning and Operation Maintenance of ATMS projects in Zone1 Delhi Region on EPC mode
Construction of 2 ROBs (129A and 134A) on the bypassed section of Thiruvarur Town in the Nagapattinam Thanjavur Section of NH 83 in Tamil Nadu on EPC Mode
Landslide treatment work from Km. 40.400 to Km. 40.758 (1 location) on Ramnagar Bhandarpani Amgarhi Okhaldunga-Talli Sethi Motor Road (SH-71) in District Nainital under EPC mode.
Landslide treatment work from Km. 63.095 to Km. 63.467 (1 location) on Ramnagar Bhandarpani Amgarhi OkhaIdunga TaIIi Sethi Motor Road (SH 71) in District Nainital under EPC mode.
Construction of LVUP on NH927 as long term rectification of MoRTH identified blackspot in Bahraich bypass to Rupaidha NH927 in the state of Uttar Pradesh on EPC Mode
Construction of Alirajpur Bypass (2-Lane with Paved Shoulder) from Ch. 0.000 to Ch. 11.792 in the State of Madhya Pradesh (Total Length-11.792 Kms) under EPC Mode.
Construction of 6 lane Viaduct and service road from Baikampady (Km.365.200) to KIOCL junction (Km.368.275) of NH-66 in the state of Karnataka on EPC mode
Widening to 4L PS configuration from km 6.600 to 16.300 of the Khamgaon to Shegaon section of N H 548C in the state of Maharashtra on EPC mode
Authority Engineer for supervision of Construction of road from Lada Sarli section of Frontier Highway NH 913 Lada to Bameng 0.000 to 43.65 43.65 km on EPC mode
Landslide treatment work from Km. 18.150 to Km. 18.560 (1 location) on Garjiya (Ghughtidhar) Betalghat-Khairna- Odakhan-Bhateliya-Muketshwar Motor Road (SH 62) in District Nainital under EPC mode.
Upgradation and Reconstruction of Khandwa-Mundi Road (SH-70) from Km 00 to Km 31.275 two Lane with Paved Shoulder in the State of Madhya Pradesh on EPC Mode.
Development of Internal Infrastructure for Integrated Manufacturing and Logistics Cluster at Barabanki with Defect Liability Period and Operation and Maintenance for Concurrent Period of Five Years on EPC Mode
Deep Drilling, Development and Stabilization of 200 mm dia mini Tube well (on EPC Mode) By ODEX Method at Chandekote Yatri Niwas in District Ramban under SANJY 2026-27
Request For Proposal (RFP) for Design Supply Installation Testing Commissioning and Operation and Maintenance of Advanced Traffic Management System (ATMS) projects in Zone 1 (Delhi Region) on EPC mode
Authority Engineer for supervision of Construction of road from Lada Sarli section of Frontier Highway NH 913 Khenewa to Koloriang 85.60 to 168.00 km 82.400 km on EPC mode
Authority Engineer for supervision of Construction of road from Huri Taliha section of Frontier Highway NH 913 Huri Parsi Palo km 0.00 to 55.725 55.725 km on EPC mode
Construction of Road Protection measures from km.110-000 to km.176-000 (Section between Mokhada to Jawhar) on NH-160A in the State of Maharashtra. on EPC mode.
Upgradation of existing Highway to 4 laning Standard from Pachpadara Bypass (Ch. 95.780) to Patau Interchange (Ch. 115.003) Section of NH25 in the State of Rajasthan on EPC mode.
Ennore SEZ - Establishment of Flue Gas Desulphurisation (FGD) system and its Auxiliaries for 2 x 660 MW Ennore SEZ under Single EPC basis.
Construction of the LonarBypass from design km 0.00 to km 5.06 having two lane with paved shoulder configuration on NH 548C in the State of Maharashtra on EPC Mode
Execution of pending defect rectification works for Development of Emergency Landing Facility for stretch Km1274.000 - Km1277.600 on Chilakaluripet-Nellore Sec. of NH-16 in AP on EPC Mode, under Risk and Cost of EPC Contractor, on an item-rate basis.
Request For Proposal (RFP) for Design Supply Installation Testing Commissioning and Operation and Maintenance of Advanced Traffic Management System (ATMS) projects in Bangalore Vijayawada Economic Corridor (BVEC) on EPC mode
One time Improvement to bypassed stretch of NH 165 of Gudiwada from Km 15.200 to 19.900 in the State of Andhra Pradesh on EPC mode under Annual Plan 2026 27
Construction of Bypass Road to Phulbani town from km. 29.800 (Design ch. 0.0) to km 38.500 (Design ch. 6.750) of NH-157 in the state of Odisha on EPC Mode
Balance work of Major Bridge on well foundation over River Gomti on NH 128A (Parallel to Shastri Bridge) in Jaunpur City in the state of Uttar Pradesh on EPC mode
Upgradation of Chitrod-Rapar-Balasar section of NH-927C to two-lane with paved shoulders from design km 0.00 to km 57.848 in the State of Gujarat on EPC mode.