Loading…
Loading…
1,793 results • Best match
Construction of balance work of Bi-directional Tunnel at Km 83rd and a Major Bridge between Km 82.675 and Km 82.925 on NH-244 in the UT of Jammu and Kashmir on EPC mode
Consultancy Services for Authority Engineer for constr. of Service Road str. at specified major junc. for imp. corridor eff. of Domel Udhampur NH44 From Ch. 220.550 to 182.200 for 14.370 Km on LHS and for 10.890 Km on RHS in UT of JK on EPC Mode
Rehabilitation and Up-gradation to 2 lane with paved shoulder from existing chainage km 102/000 to km 134/950 pkg v including constructi. of Naushera tunnel under 31 TF on Akhnoor - Poonch Road NH-144A in the UT of Jammu and Kashmir through EPC mode
Construction of Shopian Bypass on NH444 taking off from existing ch. Km 36.500 and rejoining at Km 47.588 of existing chainage New Design Chainage from Km 28.000 to Km 36.925 as 2lane with paved shoulder Length 8.925 Km in the UT of JandK on EPC Mode
CS for AE for Development of existing 2Lane NH1 from km8.660 to km33.775 (Sumbal to Wayul) to 4lane dual carriageway NH standard as part of Srinagar Ring Rd Ph2 Design Ch.41.907 to Ch.66.609 under BMP Ph1 in the UT of JnK on EPC mode
CS for AE for Supervision of Construction and upgradation of existing 2 Lane to 4 Lane dual carriageway NH standard from Pandaach to Manigam section of NH1 as part of Srinagar Ring Road PhaseIIA on EPC Mode under NH(O) in the UT of Jammu and Kashmir
Construction and upgradation of existing 2 lane to 4 lane dual carriageway NH Standard from Pandach to Manigam of NH-1 (from existing chainage Km17.974 to Km29.792) as a part of Srinagar Ring Road Phase-IIA on EPC Mode under BMP in the UT of JandK
Const. of Service Road including Grade Sep. str. at specified junctions for improvement of corridor eff. of Domel Udhampur sec. of NH44 from Ch 220.500 to 182.200, length 14.370 Km on LHS and length 10.890 Km on RHS in the UT of JK on EPC Mode.
Development of existing 2Lane NH1 from km 8.660 to km 33.775 (Sumbal to Wayul) to 4lane dual carriageway NH standard as part of Srinagar Ring Rd PhII (Design Ch. 41.907 to Ch. 66.609) under BMP Ph-I in UT of Jammu and Kashmir on EPC mode
Construction of Mega Hostel G 3 i/c Internal & External Civil, Electrical & Mechanical Services, Development works and all Ancillary Building on EPC basis at NIT, Srinagar (J&K). (SH: Providing the services of Computer Operator and Office attendant)
Improvement of HT LT Network at various Locations iN ELECTRIC Division Shopian UnDer UT Capex Budget 2023-23 on Turn key basis
Refer SBD for description
CONSULTANCY SERVICES FOR AE OF THE WORK OF WIDENING AND STRENGTHENING TO 2 LANE WITH PS FROM EX CH 56_720 TO 100_820 AND DESIGN CH 62_600 TO 106_360 (TOTAL LENGTH is 43_760 KM) SBU NH 1 ON THE UT OF JAMMU AND KASHMIR UNDER BEACON BRO ON EPC MODE.
Construction of Main campus of Indian Institute of Technology, Jammu in Phase-1C on EPC basis. SH: Providing office support staff for different activities for smooth running of Jammu Project Zone and CPWD site office Jagti, Jammu during 2022-23
C/o Main campus of Indian Institute of Technology, Jammu in Phase-1C on EPC basis. SH:- Providing office support staff for different activities for smooth running of Jammu Project Zone and CPWD site office Jagti, Jammu during 2023-24
Construction of Administrative Block (D/S), Academic Amenities Block (D/S), & Classrooms & Laboratories (T/S) and Recreation Block (D/S), Main Gate, Electric Room for NIT Uttarakhand at Srinagar Garhwal, (Phase-II) i/c maintenance for three years on ... on EPC Basis .
C/o Main campus of Indian Institute of Technology, Jammu in Phase-1C on EPC basis. SH:- Providing office support staff for different activities for smooth running of Jammu Project Zone and CPWD site office Jagti, Jammu during 2024-25
Construction of Main campus of Indian Institute of Technology, Jammu in Phase-1C on EPC basis. SH: Providing office support staff for different activities for smooth running of Jammu Project Zone and CPWD site office Jagti, Jammu during 2024-25
Construction of 4 Laning of part of Ramban to Banihal Section of NH-1A (Now NH-44) from Ch.154.210 to Ch.158.650 (NB) and from Ch.155.940 to Ch.160.260 (SB) including construction of twin tube tunnel (PKG-I) in the UT of Jammu and Kashmir on EPC Mode
AS PER NIT
CREATION OF 25 KVA SUB-STATION ALONG WITH ALLIED HT/LT FOR BOREWELL OF SERICULTURE DEPARTMENT AT BABAPORA SHOPIAN ON FULL TURN KEY BASIS
SDPE of DPR and Execution of works related to Laying of Sewage Line Network from different Toilet Blocks/establishments of Sanjichhat area and connecting the same by installing 600KLD STP based on MBR technology on EPC Basis including O and M for 5yr
Site development and the construction of Girls & Boys hostels at the Extension Campus of NIT Uttarakhand at Srinagar, Garhwal (Phase-1) including maintenance for three years on EPC basis. (SH : Development of parking area in front of NIT Recreation Block and Miscellaneous work).
Site development and the construction of Girls & Boys Hostels at the Extension Campus of NIT Uttarakhand at Srinagar, Garhwal (Phase-1) including maintenance for three years on EPC Basis. (SH : Repair and maintenance of defective work executed by M/s Arsh Constructions).
Site development and the construction of Girls & Boys Hostels at the Extension Campus of NIT Uttarakhand at Srinagar, Garhwal (Phase-1) including maintenance for three years on EPC basis. (SH : Construction of 1 No. Tubewell including boring at NIT campus, Srinagar (Garhwal), Uttarakhand).
DESIGN, SUPPLY, INSTALLATION, TESTING COMMISSIONING OF CETP STP ETP 200 KLD AT STATE CANCER INSTITUTE, JAMMU ON TURNKEY BASIS.
Refer to BOQ
C/o Main campus of Indian Institute of Technology, Jammu in Phase-1C on EPC basis. SH: Providing office support staff for different activities for smooth running of Jammu Project Zone at CPWD office Satwari and attached Division site office Jagti, Jammu during 2025-26
C/o Main campus of Indian Institute of Technology, Jammu in Phase-1C on EPC basis. SH: Providing office support staff for different activities for smooth running of Jammu Project Zone at CPWD office Satwari and Attached Division site office Jagti, Jammu during 2025-26
Providing laying of Rising main , distribution system , installation of pumping machinery, and construction of civil structure complete job of WSS Chambitrar ( On turn key basis) (NRDWP)
Construction of Mega Boys Hostel G plus 3 including internal and external civil electrical and mechanical services development works and all ancillary buildings on EPC basis at NIT Srinagar Jammu and Kashmir Subwork/Packages: Providing services of Inspection Vehicle for the office of Superintending Engineer Srinagar Circle CPWD AG Office J and K including driver diesel and all maintenance for running the vehicle during 2022 to 23
Construction of Bi-directional Tunnel at Km 83 of Length 495 m along with approach road of 664 m and a Major Bridge of 110 m between Km 82.675 and Km 82.925 on NH-244 in the Union Territory of Jammu and Kashmir on EPC mode under NH O
Refer to BOQ
Permanent restoration of NH 144, section from km 10.000 to km 24.000 Domail katra Reasi Bhamla road in the District Reasi in the UT of Jammu and Kashmir on EPC mode.
Site Development and the Construction of Girls & Boys Hostel at the extension Campus of NIT Uttarakhand at Srinagar Garhwal (Phase-1) including maintenance for three years on EPC basis. (SH:- Supply and installation of Geyser in C, D, E and dyning Block). Subwork/Packages: Pg. Geyser at NIT Srinagar Uttarakhand
Site Development and the Construction of Girls & Boys Hostels at the Extension Campus of NIT Uttarakhand at Srinagar, Garhwal (Phase-1) including maintenance for three years on EPC basis. (SH : Providing and fixing UPVC partition for Library Section, Dispensary in Recreation building in NIT Campus, Srinagar Uttarakhand).
C/o Main campus of Indian Institute of Technology, Jammu in Phase-1C on EPC basis. SH:- Providing office support staff for different activities for smooth running of IIM & IIT Jammu Project Zone at Satwari, Jammu and attached Division site office at Jagti, Jammu during 2026-27
Maintenance and Repair of 40x400 KVA Distribution Sub Stations at Jagti Colony, Nagrota under the Jurisdiction of Electric Division Div-I (JPDCL) Jammu on Turn Key Basis
Supply, Erection, Testing, Commissioning for Augmentation of 100 to 250KVA Sarah Bajalta Jammu Under the jurisdiction of Electric Division Div-I (JPDCL) Jammu On Turn Key basis
CREATION OF 25 KVA SUB-STATION ALONG WITH ALLIED HT/LT FOR PROVIDING OF POWER SUPPLY TO KGBV HOSTEL AT NAGBAL DEEGAM ON FULL TURN KEY BASIS
Design, Supply, Installation, Testing and Commissioning 25 KLD Capacity Sewerage Treatment plant (STP) to be installed at Government polytechnic College Bikram Chowk Jammu on Turn-Key Basis
Site development and the construction of Girls & Boys Hostels at the Extension Campus of NIT Uttarakhand at Srinagar, Garhwal (Phase-1) including maintenance for three years on EPC Basis. (SH : Soil Investigation of Administrative Block, Academic ... on EPC Basis . ...
Construction of Central Forensic Laboratory Building at Samba (J&K). SH: Planning, Designing and Construction of CFSL Building at Samba (J&K) including all Civil, E&M, Plumbing, Horticulture and Development works on EPC Mode - I Basis (Design & Build). SW: Making arrangement of support staff for different activities for smooth running of O/o EE (Jammu), CPWD, Satwari, Jammu.
Construction of Central Forensic Science Laboratory Building at Samba, J&K SH: Planning Designing and Construction of CFSL Building at Samba, J&K including all Civil, E&M, Plumbing, Horticulture and Development works on EPC Mode - I basis (Design & Build) SW: Providing Inspection vehicle for Samba Civil Sub Division, CPWD, Samba (J&K) during 2026-27
Supply, Erection, Testing, Commissioning for Augmentation of 100 to 250KVA Gulshan Nagar Sidhra Jammu Under the jurisdiction of Electric Division Div-I (JPDCL) Jammu On Turn Key basis
Construction of Hi tech polyhouse with Fan and Pad system 500 sqm for Division of Floriculture and Landscaping at Main Campus Chatha on Turn key basis (Component-II)
AS PER NIT
Refer to BQO
Site Development and the Construction of Girls & Boys Hostels at the Extension Campus of NIT Uttarakhand at Srinagar, Garhwal (Phase-I) including maintenance for three years on EPC basis. (SH: Providing services of Computer Operator and Office attendant/ MTS for AE, HNB, CPWD, Srinagar (Garhwal) (Chargeable to contingency)
Site Development and the Construction of Girls and Boys Hostels at the Extension Campus of NIT Uttarakhand at Srinagar Garhwal Phase I including maintenance for three years on EPC basis SH Providing services of Computer Operator and Office attendant MTS for AE HNB CPWD Srinagar Garhwal Chargeable to contingency