CREATION OF 63 KVA SUB-STATION ALONG WITH HT/LT NETWORK FOR PROVIDING OF POWER SUPPLY TO DEGIGNATED COVID CENTRE AT NTPHC WACHI UNDER SDRF ON TURN KEY BASIS
Supply, Erection, Testing and Commissioning for laying of LT Line at Dhok Waziran Nagrota, Jammu. Under the jurisdiction of Electric Division Div.-I (JPDCL) Jammu. On Turn Key basis
IMPROVEMENT OF HT/LT NETWORK UNDER THE JURISDICTION OF OM DIVISION SHOPIAN AT SUB-DIVISION SHOPIAN UNDER UT AND DISTRICT CAPEX BUDGET 2020-21 ON PARTIAL TURN KEY BASIS
Construction of 3.15MVA, 33/11KV Receiving Station at Makol Sunderbani on turnkey basis
Refer to BOQ
Site development and the construction of Girls & Boys Hostels at the Extension Campus of NIT Uttarakhand at Srinagar, Garhwal (Phase-1) including maintenance for three years on EPC basis. (SH : Alternation of existing 1st Floor of E-Block with construction of attached toilet and minor alternation as required by client department).
Site Development and the Construction of Girls & Boys Hostels at the Extension Campus at NIT Uttarakhand at Srinagar, Garhwal (Phase-1) including maintenance for three years on EPC Basis. (SH : Construction of Profile Shed above STP Plant, toe wall to barricade the area and temporary boundary wall for director residence).
Creation of 25 KVA Sub-Station and HT line at Rotary Brigdier Rajinder Singh Chowk Jammu Under the jurisdiction of Electric Division Div-I (JPDCL) Jammu. On Turn Key basis
Fixing of Rate Contract for Supply, Erection, Testing Commissioning for Replacement/Installation of damaged prodigy meter. Under the jurisdiction of Electric Division Div.-I (JPDCL) Jammu. On Turn Key basis
UPG OF EXIS BR (PERU) AT KM 27.595 BY 65 M SPAN PMT BR, EXIS 60.45 M SPAN RCC T BEAM BR (DHUNARI) AT KM 48.846 BY CONST 65 M SPAN PMT BR, AND EXIS 365.00 M SPAN RCC T BEAM BR (UJH) AT KM 54.380 BY CONST 385 M PMT BR PMT BR ON D-U ROAD ON EPC MODE
Refer to BOQ
Refer to BOQ
Construction of Hi tech polyhouse with Fan and Pad system 500 sqm for ornamental nursery for Division of Floriculture and Landscaping at Main Campus Chatha on Turn key basis (Component-I)
Creation of 25 KVA Sub-Station and HT line at Rotary Secretariat Chowk Opp. Ranbireshwar Temple, Jammu Under the jurisdiction of Electric Division Div.-I (JPDCL) Jammu. On Turn Key basis
Survey, Design and Execution of Sewerage Scheme Talab Tillo Bohri Missing Link in Jammu City J and K on EPC Fixed Cost Turnkey Basis. Contract No SDJ/W/43/2024-25 2nd Call
Site development and the construction of Girls & Boys Hostels at the Extension campus of NIT Uttarakhand at Srinagar, Garhwal (Phase-1) including maintenance for three years on EPC basis. (SH : Providing the services of computer operator and security services in the office of Executive Engineer-Garhwal, CPWD, Srinagar Garhwal. (Chargeable to contingency)
Estimate of S&T Work for Rehabilitation and Up-Gradation to 4 lane configuration & strengthening of Thanpuri to Paror section from km.85.135 to km 100.840(Design Length 16.275km) of NH-20(New NH-154) of Pathankot-Mandi section under NH(O) in HP on ... on EPC mode (Package-IIC)-Regarding ...
C/o of Administrative Block (G 1) , Academic Amenities Block (G 1) & Classrooms & Laboratories (G 2) and Recreation Block (G 1), Main Gate, Electric room for NIT Uttarakhand at Srinagar (Garhwal) (Phase-II) including maintenance of three years on EPC Basis....
Construction of Hi-tech green house 500 sqm with micro irrigation facility foggers and automated temperature and light control facility for Division of Vegetable Science at Main Campus Chatha on Turn key basis
Supply, Erection, Testing, Commissioning for Augmentation from 250 KVA to 400 KVA Substation at Poonch House Panjtirthi (Choughan Salathia) under the Jurisdiction of Electric Division Div-I (JPDCL) Jammu on Turn Key Basis
Supply Erection Testing and Commissioning for creation of 1X100 KVA Sub-station along with HTLT NW for construction of Tulip Garden Sanasar Ramban under the jurisdiction of ED Batote on turn key basis
Design Supply Erection and Commissioning of Controlled Conditioned Cropping Room of S for Cultivation of Mushroom along with packing room and other allied works on Turn Key Basis at Saffron Farm Berwar Kisht
Supply, Erection, Testing, Commissioning for Providing of Power Supply through 11KV dedicated feeder to newly upgraded MA Stadium Jammu Under the jurisdiction of Electric Division Div-I JPDCL Jammu On Turn Key basis
Supply of Gaussian turnkey software
Supply, Erection, Testing, Commissioning for laying of LT Line 0.250 Km of 3 phase 4 wire at Village Lower Ragoora Under the jurisdiction of Electric Division Div-I JPDCL Jammu On Turn Key basis
Supply Erection Testing and Commissioning for Creation of 25 KVA Sub-Station and HT line at Rotary Indira Chowk Jammu Under the jurisdiction of Electric Division Div-I JPDCL Jammu On Turn Key basis
Construction of 01 No. Shade net house (500 sqm) with brick wall, fogging system and drip irrigation system for Division of Floriculture and Landscaping at Main Campus, Chatha on Turn key basis (Component-1)
Construction of 02 Nos. Shade net houses (500 sqm) with brick wall, fogging system and drip irrigation system for Division of Floriculture and Landscaping at Main Campus, Chatha on Turn key basis (Component-2)
Supply Erection Testing and Commisssioning of 11 KV line including dismantling of existing HT Line 0.250 Kms of Jagti local feeder to avoid crossing in the Premises of IIM, Jammu On Turn Key basis
Construction of Mega Boys Hostel G plus 3 including internal and external civil electrical and mechanical services development works and all ancillary buildings on EPC basis at NIT Srinagar J and K SH Providing services of four wheeled inspection vehicle for the office of Assistant Executive Engineer Hospital Project Sub-Division CPWD, NIT Hazratbal Srinagar J and K
Site Development and the Construction of Girls & Boys Hostels at the Extension Campus of NIT Uttarakhand at Srinagar, Garhwal (Phase-1) including maintenance for three years on EPC basis. (SH : Construction of meter room, minor repair work at Phase-1, shifting of existing MS Grill and water supply lines for horticulture work at NIT Campus, Srinagar Garhwal, Uttarakhand).
Fixing of Rate Contract for Creation of 250, 400 and 630 KVA Sub Station Under the jurisdiction of JPDCL Electric Division-I, Parade, Jammu for the financial year 2023-24 on partial Turn Key basis
Design, Supply, Installation, Testing and Commissioning of (All In One) COMBINED SEWAGE EFFLUENT TREATMENT PLANT OF CAPACITY 30 KLD. complete with all required Civil works , electro-mechanical equipments on turn-key basis at SDH Bishnah
Supply, Erection, Testing, Commissioning of 2 No 11 KV CT/PT Unit along with trivector meter at Super Specialty Hospital, Jammu Under the jurisdiction of Electric Division Div-I (JPDCL) Jammu On Turn Key basis
Fixing of Rate Contract for Creation of 25, 63 And 100 KVA Sub Station Under the jurisdiction of JPDCL Electric Division-I, Parade, Jammu for the financial year 2022-23 on partial Turn Key basis
63 KVA Sub Station, laying of HT Line and laying of LT Line at Berga Bhagwani near primary school Dansal Jammu Under the jurisdiction of Electric Division Div.-I (JPDCL) Jammu. On Turn Key basis
Deep Drilling of 125 mm dia Bore Holes by using ODEX method including providing, installation, testing, commissioning of Mark II Hand Pumps and construction of platforms at (18 Nos Locations) in District Rajouri on Turnkey Basis (EPC
Deep Drilling of 125 mm dia Bore Hole by using ODEX method including providing, installation, testing, commissioning of submersible pump set at JKPDC Complex Draba in District Poonch on Turnkey Basis (EPC) under JKPDC Capex (2026-27)
Rate Contract for Interior Works Turnkey
Turnkey Video Conferencing Supply and installation
EPC CONSTRUCTION OF 93 MW NEW GANDERBAL HEP
Construction of Administrative Block G 1 Academic Amenities Bllock G 1 and Classrooms and Laboratories G 2 and Recreation Block G 1 Main Gate Electric Room for NIT Uttarakhand at Srinagar Garhwal Phase II including maintenance of three years on EPC Basis ... on EPC Basis SH ...
Construction of Administrative Block G 1 Academic Amenities Block G 1 and Classrooms and Laboratories G 2 and Recreation Block G 1 Main Gate Electric room for NIT Uttarakhand at Srinagar Garhwal Phase-II including maintenance of three years on EPC basis ... on EPC basis SH ...
Construction of Administrative Block G 1 Academic Amenities Block G 1 and Classrooms and Laboratories G 2 and Recreation Block G 1 Main Gate Electric Room for NIT Uttarakhand at Srinagar Garhwal Phase II including maintenance of three years on EPC Basis ... on EPC Basis SH ...
Supply, Erection, Testing Commissioning for execution of works for creation of infrastructure for providing air conditioners in New Secretariat, Main Building, Mini Secretariat at Jammu. Under the jurisdiction of Elect Div-I Jammu.On Turn Key basis
Supply, Erection, Testing, Commissioning for Creation of 63 KVA Distribution Sub-Station alongwith laying of HT Line at Brahmin Mohalla Seri Panjgrain under the Jurisdiction of Electric Division Div-I JPDCL Jammu on Turn Key Basis
Supply, Erection, Testing, Commissioning for Creation of 250 KVA Substation alongwith laying of HT and LT Line at Gulshan Nagar Sidhra, Jammu under the Jurisdiction of Electric Division Div-I (JPDCL) Jammu on Turn Key Basis
Supply, Erection, Testing, Commissioning for Creation of 63 KVA Sub-Station alongwith Laying of HT Line at Jhajar Kotli near Khidmat Centre under the Jurisdiction of Electric Division Div-I JPDCL Jammu on Turn Key Basis
Supply Erection Testing Commissioning for Replacement of HT Cable of BSNL BTS Site at Mahamaya Jammu under the jurisdiction of Electric Division Div-I (JPDCL) Jammu for the financial year 2021-22 on Turn Key basis
Deep Drilling of 125 mm dia Bore Holes by using ODEX method including providing, installation, testing, commissioning of Mark II Hand Pumps and construction of platforms at (06Nos) different locations in District Udhampur on Turnkey Basis (EPC) under