Loading…
Loading…
666 results • Latest
Repair works to Piers Sill and Guide Wall for leakage prevention and strengthening and other ancillary works of KT Weir at Rajgurunagar
Repair works to Piers Sill and Guide Wall for leakage prevention and strengthening and other ancillary works of KT Weir at Waki
Repair works to Piers Sill and Guide Wall for leakage prevention and strenthening and other ancillary works of KT Weir at Sangvi Sandas
Repair works to Piers Sill and Guide Wall for leakage prevention and strenthening and other ancillary works of KT Weir at Donde
Repair works to Piers Sill and Guide Wall for leakage prevention and strengthening and other ancillary works of KT Weir at Pimpri
Repair works to Piers Sill and Guide Wall for leakage prevention and strengthening and other ancillary works of KT Weir at Shelgoan
Repair works to Piers Sill and Guide Wall for leakage prevention and strengthening and other ancillary works of KT Weir at Koregoan
Construction of Open Canal System to Pipe Distribution Network of Janai Shirsai Lift Irrigation Scheme
Construction of RCC Water Tank with Filter Plant for Alore Colony 1 Lakh Liter Capacity
Repair works to Sill Diaphram Wall and Guide Wall for leakage prevention and strenthening and other ancillary works of KT Weir at Watekarwadi
Construction of Bituminous Road from Takari Pump House Stage 3 to Delivery Chamber And Approach road from Takari Stage 4 to Main D.C.
Carrying out maintenance and repair works of Jihe-Kathapur Lift Irrigation Department Record Room and Store Room (such as sheet installation, gutter work, window installation, flooring, electrical works, painting, etc.), and repair works of Subdivisi
Repair work of Katkarvasti (Vaki), Mhaswad and Rautwadi KT weirs on Man river under Guruvarya Late Laxmanraoji Inamdar lift Irrigation Scheme (Jihe Kathapur), Dist-Satara
Providing and Fixing Stiffners For Overburden portion to Second Line of Rising Main of Jihe Kathapur Lift Irrigation Schme Under Guruvarya Late Laxmanraoji Inamdar Lift Irrigation Scheme (Jihe Kathapur) Dist. Satara
Supplying New MS needles for K.T Weir on Yerala river at Village Ganeshwadi, Village Ranmala, Village Vaduj under Guruvarya Late Laxmanraoji Inamdar lift Irrigation Scheme (Jihe Kathapur), Dist-Satara
Construction of Pipe line to drain cooling water for Main Pump House.2 Under Guruvarya Late.Laxmanroaji Inamdar Lift Irrigation Scheme (jihe Kathapur ) Dist Satara
Construction of Retaining wall At Chainage 2180 m For First Row Of Rising Main and near Pump house no 1 Under Guruvarya Late Laxmanraoji Inamdar Lift Irrigation Scheme (Jihe Kathapur) Dist- Satara
Carrying out Furniture renovation work of Executive Engineer, Quality Control Division, Satara office and painting work of store room and division Office, Carrying out maintenance and repair work of Soil Laboratory and Material testing Laboratory of
Construction of Bituminous Approach Road for Pump House and Delivery Chamber of Ner Lift Irrigation Scheme No. 1 and 2 under Late Guruvarya Laxmanraoji Inamdar Lift Irrigation Scheme. ( Jihe Kathapur) Dist. Satara( Jihe Kathapur) Dist. Satara
Construction of Head Regulator Gate at Entry of Andhali tunnel under Guruvarya Late Lakshamanraoji Inamadar Lift Irrigation Scheme(Jihe Kathapur) Dist- Satara
Construction of Steel Concrete (RCC) Protection Wall For Total Area of Mechanical Division Godoli, Satara
Carrying out Emergency Works of Water supply and Electricity lines within Krushnanagar Colony.
Repair, painting, water proofing, furniture and electrical relateworks of Dhom Canals Division No.2, Dhom Left Bank Canal SubDivision No.7, No.4 and Kanher Rehabilitation and Land Acquision SubDivision Satara,Sinchan Bhavan Premises as well as Krus
Drilling Of Boreholes For Necessary Investigation for seepage control Measures at Warasgoan Dam (Veer Baji Pasalkar) Dam Under the Dam Safty
Construction of Regional Workshop For Mechanical Division and Doing Other Related Works
Construction of Parking shed and Diesel Supply Shed For SubDivision and Regional Workshop Under Mechanical Division Satara
Creation of An Archive Room to Preserve Records Under Krushnanagar Colony.
Construction of toilets for Employees of Quality Control SubDivision, Satara, Dhom Left Bank Canal SubDivision No.4 Satara and Kanher Land Acquisition and Rehabilitation SubDivision, Satara offices
Construction of Dentated Weir at Ch 380 m End Weir at Ch 1250 m and Protection Wall between Ch 850 to 1250 m on Tail Channel of Dhamani Project
Krishna Koyna Lift Irrigation Scheme Mhaisal Lift Irrigation Scheme Jath Part Construction Of Remaining feeder pipelines on the Sangola Gravity Main Km 0.00 - 37.680 and its Balance Disnet for Tank Feeding are to be partially filled through
Krishna Koyna Lift Irrigation Project Mhaisal LIS Jath Part Construction of PDN from Mangalwedha Dy-2 CR to Lavna Tank of Mangalwedha Taluka
Balance civil work of constructing New gated Bandhara across river Krishna near village Khodashi Tal Karad Dist Satara
Conducting Prelimi Survey investigation Design and Preparing Estimate of cadwm work on Command of Man Khatav lift Irrigation scheme and Kamath Gravity Main offtaking from Kamath Storage Tank Tal Man Khatav of Dist Satara Tal Atpadi of Dist Sangl
Repairs to Tarewadi K.T.Weir Under Ghatprabha Project.
Additional Command Area Development Works On the Atpadi Left Bank Canal KM 1 To 10 and Feeder pipeline for K T Weirs at Vitthalapur Khavaspur and Dighanchi also Goyaba Temple Tank at Pujarwadi Dighanchi including Running Operation and Maintenan
Construction of Gravity main and closed pipe distribution system from pressure release tank for Bhadale Valley Gravity main under Guruvarya late Laxmanraoji Inamdar Lift Irrigation scheme, (Jihe Kathapur), Dist. Satara.
Construction of Gated spillway including erection of Radial Gates for Dhamani Medium Project
Carrying out building repairs and construction of a protective wall for the Minor Irrigation Subdivision, Atpadi under the Minor Irrigation Division Sangli Taluka Atpadi District Sangli
Construction of Inlet Chamber and Valve Chamber for pipe Distribution network on Urmodi Right bank canal
Construction of Samarthgaon, Kashil Lift Irrigation Scheme Civil Works, Electrical Works And Mechanical Works Under Urmodi Irrigation Project
Construction of Lawanghar Lift Irrigation Scheme Civil Works, Electrical Works And Mechanical Works Under Urmodi Irrigation Project
TLIP Construction of PDN of sub dy 1 on Dy 2 of Khanapur Tasgaon Canal Km 30 ch 29030 m for feeding Khamjai Tank and downstream CNB Tal Khanapur Dist Sangli
Tembhu Lift Irrigation Project- Construction of Inlet structures on Inspection Path side at selective location in Km 1 to 15 of Kamathi Canal and Removing the silt at the deep cut locations of Kamathi canal.
Mhaisal Lift Irrigation Scheme - Construction of Guard Room, metering kiosk room and maintenance work of Gavan Pump house Phase II at Gavan, Tal. Tasgaon, Dist .Sangli
Mhaisal Lift Irrigation Scheme- Repairs to Cross Regulators Cum Escape (no.3) on Kalambi Branch Canal.
Mhaisal Lift Irrigation Scheme - Kavathemahankal Main Canal Km 1 To 73 Remaining Works, Tal. Kavathemahankal Dist. Sangli
Water Proofing work of Purandar Lift Irrigation Scheme Pump house no.1 to 4. control Room and other ancillary work, Tal- Haveli, Pune.
Preparing of Land Aquisition proposal which are sanction or submitted as per Govt Res 2015 Direct Purchase but not get sanction or purchase are prepared as per L A Act 2013 of KLBC in Shrigonda karjat and Karmala Tal by Outsoursing
Providing Supplying 3 Four Wheeler Vehicles with Driver on Rent Basis for field work for Sub Divisions Under Bhama Askhed Dam Division
Construction of Protection wall at Rawdi in km 6 of Dhom Balkawadi Right Bank Canal, Construction of Protection wall at down stream of Polwadi Tunnel in km 17 and Construction of Protection wall at up stream of mirjewadi Tunnel in km 20 of Dhom Balka