Fixing of Sluice valve at MI Tank Atpadi and Kachrewasti Construction of RCC wall and jacketing around The MS Pipe Tal Atpadi Dist Sangli year 2025-2026
Provision of Sluice Valve and Extension of Pipe Line at Sawarde Under Pundi LIS Tal Tasgaon Dist Sangli For Year 2025-26
Maintenance and repair removing of trees Repair of stone Pitching rock Toe and toe Drain casing Embankment of storage Tank Zare Wakshewadi Mitki Manewadi Kamth Chinchale
Preparation of Beneficiary List Crop Measurement Preparation Bill Database of Tembhu Project ( Command Area 30000 Ha) Year 2025-26
Repairing of Section 1 2 and Kanhersar Section And New Ladies Toilet Under Chaskaman Sub Division No 5 Rajgurunagar Khed
Preparation of Beneficiary List Crop Measurement Preparation Bill Database of Krishana Canal Medium Project with Vasagade bhandhara ( Command Area 13366 Ha) Year 2025-26
Removing Leakages of Syphon at Ch73406 and Repairs to embankment in Km 73 74 and 75 Km of Krishna Canal
Construction of guide wall on the right side ds of Stilling basin of Chasakaman Dam and other ancillary works
Regular Maintaince and Repair of Wafgoan Thitewadi Dhamari M I Tank and other Alied Work
Canal lining for chainage 1300 to 1500, 2100 to 2400 and 4700 to 5000 and other allied work of Wafgaon MI tank
Construction of Guide wall of Escape at CLBC Ch 0810 and other ancillary works
Repairs to Waste Weir toe pitching toe drain and remaining pitching work and Other Ancillary Works of Nimgaon Bhogi M I Tank
Construction of Protection wall and resectioning for Aqueduct with escape Gate at Ch 3/500 km Inspection side of Krishna canal
Extension of M S distributory at Hatnur Ch 2100 m from Visapur LIS Under Tembhu Lift Irrigation Project Management Tal Tasgaon Dist Sangli
Removing toe drain and DS side Apron Jacketing work Under Special maintenance and Repairs of K T Weir Nimani Tal Tasgaon
Provision of DC overflow arrangement Sawarde Under Pundi LIS Tal Tasgaon Dist Sangli
Construction work to install a discharge flow- measurement device at Arphal Main Canal Km 107 and Palus Branch Canal Km 1
Tembhu Project preparing water user association maps updating beneficiary list and re-election and other relevant work
Construction of a distribution chamber at Arphal Canal Palus Branch Canal at Ch No 9725 mtr and on Bambawade Distributary at chainage No 2445 mtr
Construction of Foot Bridge at Km 61 Ch 60700 on Krishna Canal
Carrying Out Regular Maintenance And Other Ancillary Works Including Repairs To The Gates At Distributory No15A 15B 16 and 16A on Chaskaman Left Bank Canal
Carrying Out Regular Maintenance And Other Ancillary Works Including Repairs To The Gates At Distributory No11 11A on Chaskaman Left Bank Canal
Repair works to Piers Sill and Guide Wall for leakage prevention and strengthening and other ancillary works of K T Weir at Sidhegavhan
Maintenance and repair work IP of the canal and RCC lining for KM 79 OF CLBC
Construction of Compound wall and wire fencing for chaskaman project colony ShikrapurTal Shirur Dist Pune and other anicillary works
Construction of Guide Wall of Chaskaman Left Canal HR Outlet and other ancillary works
Regular maintenance of the Chaskaman dam cleaning of the Vertical Porous Drain removal of trees and bushes on the dam wall between Ch 160 to Ch 280
Construction of Sakav on Mankarnika nalla at Nandari M.I. Tank Tal.Shahuwadi. Dist. Kolhapur.
Providing private security guards for full time security at the dam site of the Nazare Medium Project.
Repairs to Section office building of Irrigation Section Khatav at Khatav Tal Khatav Dist Satara
Kukadi Irrigation Project, Dist.Pune, Ahilyanagar Balance repair works of Kukadi Left Bank Canal k.m. 0 to 59 under Maharashtra Irrigation Improvement Programme (MIIP).
M and R to Mandaki, Jeur, Pimpra and Nira K.T.Weir Tal- Purandar on Nira River for the year 2026-27 (Removing and Plugging Work)
Providing Repairs and improvement of Ujjani Dam RHS Approach Road from NH-65 by Asphalting.
Repairs to C.C. Lining of ULBC Dy. 33 25,41,992/- Solapur at Ch. 0/100, 0/480, 0/900 to 0/980
Irrigation management and Maintenance of Bhose Gravity Main Km. 11 to 20 of during Rotation and Non Rotation period for the Year 2025-26
Irrigation management and Maintenance of Dongarwadi canal Km 1 to 14 and Bhose Gravity Main Km. 1 to 10 of during Rotation and Non Rotation period for the Year 2025-26
Irrigation management and maintenance of Salgare Branch Canal Km. 11 to 30 during Rotation and Non Rotation period for the year 2025-26.
Irrigation Management of Khanderajuri Branch Canal during Rotation and Non Rotation period for the year 2025-26.
Irrigation management and Maintenance of Extended Gavan L. I. S. during Rotation and Non Rotation period for the Year 2025 - 26.
Supplying labours for cleaning and maintenance of Mhaisal Pump Hosue stage 1 to 5 for 2025-26.
Providing and Supplying Labours for Routine Maintenance of Waranali Colony and Office Area
Irrigation management and maintenance of kavathemankal Canal Km. 1 to 39 and Banewadi L.I.S. during Rotation and Non Rotation period for the year 2025-26
Repairs Work Of Lingnoor Canal K.M. No. 1 to 15
Irrigation management and maintenance of kavathemankal Canal Km. 56 to 73 during Rotation and Non Rotation period for the year 2025-26.
Krishna Koyana Lift Irrigation Project - Providing and erecting chain link fencing and Other Allied work at Arag colony under Mhaisal lift Irrigation Scheme.
Irrigation management and maintenance of Lingnoor Branch Canal Km. 1 to 15 during Rotation and Non Rotation period for the year 2025-26.
Irrigation management and maintenance of Salgare Main Canal Km. 1 to 10 during Rotation and Non Rotation period for the year 2025-26.
Irrigation management and maintenance of Kalambi Branch Canal Km. 1 to 42 during Rotation and Non Rotation period for the year 2025-26.
Construction of VRB in Mohite Vadagaon at Takari Main Canal in Km.6, VRB in Amarapur Shivani at Takari Main Canal in Km.32 , VRB inTupewadi at Takari Main Canal in Km.39 and Pipe Distribution Network of DO 11
Emergency repairs of Dhom Balkawadi Right Bank Canal