Loading…
Loading…
666 results • Latest
Design, Development, Implementation, Hosting, Operations, Maintenance of CMS based New WRD portal for Maharashtra Water Resources Department (Government of Maharashtra)
Providing private vehicle on rental agreement to subdivision offices Satara /Rahimatpur / Koregaon / Phaltan under Satara Irrigation Division, Satara .
Construction of Foot Bridge on stage 3 A to Ghanand Tank Canal
Construction of Village Road Bridge VRB at Hivtad on Ghanand Hivtad Canal km 1 to 32
Construction of Village Road Bridge VRB at Ch 23000 Gulalki Vasti Nelkaranji on Ghanand Hivtad Canal km 1 to 32
Construction of Trash Rack Structure on Kavathemahankal Canal at offtake Bevnur Direct Feeder and Kavathemahankal Canal PDN Km 20 to 35 Tal Kavathemahankal District Sangli
Repair Renovation of Building and Compound for Sub Division No 09 Khanapur of Tembu Lift Irrigation Project Tal Khanapur Dist Sangli
Flood Protection work on Kadavi River at Perid Village , Tal- Shahuwadi, Dist- Kolhapur.
Construction of Guide Wall on Mhasurli KT Weir on Dhamani River Dist.Kolhapur
Providing and Supplying of M.S. Needles to K.T. Weirs under Koge Irrigation Section No.02,Kale Dist- Kolhapur
Providing and Supplying of M.S. Needles to K.T. Weir on Dhamani River year 2025-26 Dist- Kolhapur
E Tender 8 2025-26
Cleaning trash rack panels of Sina madha LIS pump house and Removing wet silt from pum house forebay
Exacavation and Concreting work of Vardhangad Tunnel ( Ch. 0 to 4/095) and Andhali Tunnel (Ch. 0 to 12/979) as per revised bed slope under Guruvarya Late Laxmanraoji Inamdar Lift Irrigation Scheme ( Jihe Kathapur) Dist. Satara
Providing Non Technical Person for land Acquisition work of Sina Madha Project Sub Div. No. 1,2,4 Bhimanagar and Modnimb
SPECIAL REPAIRS TO K T WEIR ON TARALI RIVER AT INDOLI TAL KARAD DIST SATARA
Krishna Koyna Lift Irrigation Scheme Mhaisal LIS Jath Part Construction of Foot bridges 04 Nos and Valve Type Chembers Ch24380, 26420, 29120, 41310, 46840 47100, 4730047800 08 Nos on Jath Main Canal Tal Jath Dist Sangli
Repair of VRB Bhondavewasti at NMRBC
Construction of C.R. Cum ESCAPE CH 92/050 On Old Mutha Right Bank Canal Under Extension and Improvement
Reconstruction of VRB Javajibuva to Holewasti on NMRBC and Repair of Old Bridge
Routine Operation Maintenance Repair and Allied Works of Warsgaon Dam
Providing CCTV system and establishing control room at Wang Medium Project Taluka Patan Dist Satara
Anti corrosion painting of iron components and lighting arrangements at the dam head breeching section and kopara kothi areas at the Khadakwasla Dam
REPAIR TO LEAKAGE MEASURING SYSTEM, REGULAR MAINTANENCE AND REAIRS TO PAWANA DAM AFTER MONSOON SEASON FOR YEAR 2025 AND OTHER ALLIED WORKS
Construction of VRB CH 62/775 (Chandanwadi) of OMRBC Other Allied Work
Work of Survey and Hydrological Study of Rivers in Pune City
Construction of K T weir Ch 1210m No 2 On Sakhari Nalla Under M I Tank Kalgaon Tal Patan
Wang Medium Project Tal Patan Dist Satara Consruction of service road on the top of Dam and ancillary works for dam safety
Wang Medium Project Tal Patan Dist Satara Shifting of electric line at submergence of Dam And Rehabilitated Village Taigadewadi Tal Patan
Providing andsupplying multipurpose manpower for the office1 Medium Project Sub Dn No8 Karad2 Medium Project Sub Dn No1 Karad3 Minor Irrigation Survey Sub Dn and Minor Irigation Division Satara also Minor Irrigation Sub Dn No2 Satara Kanher Canal Sub
Demarcation of acquired land under the Vadiwale Irrigation Project. (Asset Mapping)
Demarcation of acquired land under the Kasarsai Irrigation Project. (Asset Mapping)
Demarcation of acquired land under the Andhra Irrigation Project. (Asset Mapping)
Demarcation of acquired land under the Bhatghar Irrigation Project. (Asset Mapping)
To carry out necessary Building works at the old and new rest house premises and dining hall premises of the Irrigation Department Rest house in Baramati also Installation of street lights, Supply furniture components, Electrify the area, Construct a
Supplying Security Guard for the year 2025-26 At K.T.Weir Kinni, K.T.Weir Akkalkot, K.T.Weir Nimgaon, K.T.Weir Mirajgi, K.T.WeirSatandudhani, K.T.Weir Sangolgi, K.T.Weir Ruddhewadi, K.T.Weir Bablad. Tal, Akkalkot, Dist Solapur
Construction of Earthwork, Structure and Manual C. C. Lining for Ch. 10/740 to 11/060 of Main Canal Stage-II ofD ahigaon Lift Irrigation Scheme Tal.karmala Dist.Solapur
Construction of Distribution HDPE Pipe line to chinchecha mala talav offtaking at ch.14666m from baramati dy of PLIS village Masalvadi tal baramati dist pune
CONSTRUCTION OF VRB at CH 8 obliq 785 PONDHAWADI BRANCH CANAL OF KUKADI LEFT BANK CANAL
Repairs to Kadgaon K T Weir Under Patgaon Medium Project
Repairs to Salgaon K T Weir Under Sarfnalla Medium Project Tal Ajara Dist Kolhapur
Repair Work of Road Surface at KTW 16 and Dam top of Chikotra Medium Project tal Ajara Dist Kolhapur
Providing, fixing, installation, commissioning of CCTV and other ancillary system at pump house no 1 to 6 of Purandar lift irrigation scheme ,tal-haveli,pune.
Remaining works to be carried out at Uchangi Dam (Construction ofal supply- Installation of CCTV camera
Reconstruction of HPD structure of DLBC km 7 Ch 6 247 Taluka Radhanagri Dist Kolhapur
Construction For Flood Protection Work at Ghotavade on Bhogavati River Tal. Radhanagari Dist. Kolhapur
FIXATION OF FLOOD LINE FOR BHIMA RIVER IN SOLAPUR DISTRICT FROM UJANI DAM D/S TO MAHARASHTRA AND KARNATAKA STATE BOUNDARY (CH.310 KM TO 568 KM) , BORI RIVER (CH.43 TO 118 KM) AND THEIR TRIBUTARIES (HYDROLOGICAL STUDY, COMPUTATION OF Flood Level With
FIXATION OF FLOOD LINE FOR MAN RIVER (CH. 100 KM TO 181 KM), KORDA RIVER (CH. 0 KM TO 40 KM), BHOR RIVER (CH. 0 KM TO 52 KM) AND THEIR TRIBUTARIES (HYDROLOGICAL STUDY, COMPUTATION OF MAXIMUM FLOOD LEVEL WITH COMPUTERIZED SYSTEM, MARKING OF PROHIBIT
Krishna Koyna Lift Irrigation Project- Mhaisal Lift Irrigation Scheme- Kavathemahankal Part- Construction of Arag Bedag Lift Irrigation Scheme Tal. Miraj Dist. Sangli and Borgaon Lift irrigation Scheme Tal. Kavathemahankal Dist. Sangli
Installation of CCTV and other ancillary systems at Pump House No 1 to 3 of Janai lift irrigation scheme Pump House No 1 of Shirsai lift irrigation scheme.