Loading…
Loading…
1,419 results • Latest
Augmentation of MSDAC in track section of BLN/EI.
Replacement of overaged various telecom facilities at DRM office building of DDU division
S&T work in connection with improvement in earthing arrangements of signalling assets to enhance system reliability and other signaling work over Adra Division.
Deburring and Flash removal of the insulating components of Q relay in Machine Shop at S&T/Workshop/Podanur for a period of Two year.
Comprehensive Annual Maintenance Contract of Central data Controller(CDC), Driving software for Integrated passenger System & Single Line Train Arrival/ Departure Display Board at PD, BNKJ, BKT, AA, KMP, BST, KLD, MIM & CM stations for 3 Year.
Conducting survey & digitization of existing underground Signalling and Telecommunication cables with RTK (Real Time Kinematics)/ DGPS (Differential GPS) technology using GNSS (Global Navigation Satellite System), including preparation of digitalized Signalling and Telecommunication Plans over entire Kota Division
Telecom Work in connection with Renovation of AREA office and conference Hall at New Jalpaiguri.
Supply, Installation, Testing & Commissioning of MSDAC, Alteration/Modification in Electronic Interlocking at Stations and associated works for Reliability Improvement at JHS EI-I, EI-II, Nandkhas, Moth & Erach Road Stations of Jhansi Division.
S&T cable shifting work and circuit alteration in connection of proposed LHS at 218C (GAU-BV), 197 B-2 (BST-ORW), 181/B-2 (MND-ORW) and in connection of closure of LC No. 191 C (MND-ORW), 220 C (BV-GAU) & 162 Spl (DMG).
Interlocking of LC Gate no. RB-36 in ROP-BGY section of KGP Division
Alteration in existing Electronic Interlocking of make Hitachi STS and other miscellaneous signalling work in connection with private siding at Bhopatpur station of Izzatnagar Division
Provision of Coach Guidance Display System at 6 Stations (BRY, BPR, KHMA, BLQR, FGR & KMJ) of IZN Division
Ajmer Division: Comprehensive Repair Maintenance Contract of Window/Split Air Conditioners (Capacity-1.5 & 2 Ton) at various stations/IBH over Ajmer Division for 03 years
Provision of Telecom facility in connection with setting up Unified Command and Control Centre (UCCC) at Western Railway HQ, Churchgate.
Provision of Integrated Passenger information system as per RDSO specification RDSO/SPN/TC/108/ Ver 1.0 or latest at Tambaram Station(TBM) in Chennai Division.
Provision of Railnet connections in C&W Workshop at JAGADHARI WORKSHOP & KALKA WORKSHOP
Augmentation of datalogger and provision of large Format Display in Jammu Division
S&T work in connection with 1) Construction of 2 Lane ROB in lieu of LC-6 at Km 12/2-3 on JHL-HSR section near Jamalpur Shaikhain. 2) Provision of one hook placement of half Goods rake at Goods siding at Bassi Pathana (BSPN) station of Ambala division. 3) Construction of 2 Nos LHS(5mx5m) by pushing in lieu of C-18 at Km 29/1-2 &LC -59 at Km 77/15-78/0 on JHL-HSR section. 4) Replacement of Girder with PSC slab & strengthening of substructure of Br.No.190, 197A-1, 220A, 232 DUI-JHL, Br.No.49, JHL-HSR, 30,82,135 LDH-DUI, Br.No 60-A, 100 RPJ-DUI, 221,292 DUI-BTI & 143 BTI-SGNR Section. 5) Provision of 3m FOB at Barwala (BXC)
Replacement of Non RDSO type Automatic fire detection alarm system (AFDAS) with RDSO type at station and Relay huts over Ambala division.
(i) Signalling work in c/w Yard improvement under jurisdiction of ADEN/CDG . (ii) Signalling work in c/w Yard improvement under jurisdiction of ADEN/UMB. (iii) Signalling work in c/w Yard improvement works in 20 yards under Sr.DEN/IV/UMB.
Augmentation of Automatic Fire Alarm System over Delhi Division.
Implementation of UTS Modernization for Tier-2/3/4 locations as per directions of C&IS Directorate of Rly. Bd. Over Ambala Division.
Signalling work in c/w (i) Provision of Electric lifting barrier (ELB) in lieu of left over Mechanical Lifting Barrier (MLB) and provision of Road signals on interlocked Level crossing gates over Ambala Division. (ii) Provision of IPS on leftover interlocked level crossing gates over Ambala Division.
Signalling work in Connection with Upgradation / augmentation of Satellite Track Machine Depot at Bandikui Station in Jaipur division.
S&T related cable shifting/utility shifting for facilitated engineering earth work for construction of fencing /ROB/RUB/LHS /Drain /Bridges repairing etc. in Gondia- Jabalpur section in NAG division of SECR.
Provision of an advanced integrated voice cum data LC gate communication system at 47 gates in Lumding division.
Supply installation, testing, and commissioning of integrated power supply (IPS) at 15 locations in the Vaitarna-Paldhi section of the Mumbai Division Western Railway.
Provision of CCTV cameras at 10nos. manned Non-Interlocked LC gates of Pune division, Central Railway.
Provision of Sectional OFC maintenance Work in Various Sections over Jodhpur Division for Period of One Year
Reliability improvement by Dual Detection of Track circuit with Axle counter at RGU,BSZ,JSB,DAYG,MCSC,ISHN,KHGP & SKNP stations under section of Sr.DSTE/BL/JHS.
Provision of Fiber Monitoring system in MTJ-NAGDA seection of Kota Division
Signaling related works for provision of Augmentation of yard lines at Bordhai, Navegaon, Hirdagarh and Iklehra stations.
S&T work in connections with turnout renewal in Itarsi-Satna Section of Jabalpur Division on West Central Railway (Signalling work)
Provision of Electronic Interlocking at Srinagar (SINA) station alongwith Telecom work including Block Working in c/w "Additional coaching facilities at Srinagar. " over Northern Railway.
Provision of RGM Track Machine siding including various required facilities at HAN, GQL, JJA & KPZ Station on kota division.
Provision of Telecom facilities in connection with infrastructure development, bridge works, station development, ROB/RUB works and maintenance facility augmentation in Ahmedabad Division.
Enhancing safety by replacing defective/ worn-out TLJBs, Track leads, point insulations, ground connections, Location boxes & foundations, Signal assemblies & foundations including trenching, laying of cables, terminations etc in the section of DSTE/ Tele & Works on Kota Division.
S&T portion of work for (i) Closure of LC Gate No. KY-21 due to connectivity of road with National Highway at NMP R Yard. (ii) Construction of 01 No. RUB (Road Under Bridge) in lieu of LC No. 86 in Balichak- Jhargram Section (iii) improvement of road approach with cover shed, sump well, pump house & drain at LC No.87 of KGP- TATA Section under ADEN/JGM. (iv) Improvement of road approach with cover shed, sump well, pump house & drain at LC No.95 of KGP-TATA Section under ADEN/JGM.
Alteration of Medha EI at 04 stations at Jujomura, Balangir, Saintala & Bargarh for removal of LC gates from VDU.
Execution of residual Signaling and Telecom works in connection with improvements in earthing arrangements and lightning & surge protection devices including provision of Isolating Spark Gaps and exothermic welds to increase system reliability at various locations of Ranchi division.
Provision of Signalling system for improvement in Safety and Traffic flow at Latur station & provision of DAC in vulnerable locations like waterlogged, mud and muck track circuits for Enhanced Safety and Efficiency in Solapur Division of Central Railway.
Provision of Electronic Interlocking at Gharni (proposed new Block station) in Latur- Latur Road section of Solapur Division of Central Railway.
Provision of FTTH at PK Road and nearby Railway Officers Colony and High Speed Railnet connectivity in Claims office, NDCR Building, New Delhi.
Shifting of S&T cable in connection with proposed "Laying of RCC 600mm NP3 hume pipe of length 845m parallel to Railway track at BKP station under Danapur."
Comprehensive annual maintenance contract of EFFTRONICS make SSBPAC of 03 block sections (SCPD-AWL, AWL-KKL & KKL_BPRS) over Firozpur division for 03 years.
Provision of second loop line at HIND & NNX station on single line section.
S&T associated work for the provision of a high-level island Platform & other passenger amenities betwen between line nos. 9 and 10, extension of platform No. 6 & Ballast-less track for Line Nos. 1 & 2 at Hisar Railway station over Bikaner Division.
Telecom work in connection with Construction of multi-storeyed 100 bed barrack with all facilities i.e-officer room mess , Dining hall, store ,gym, recreation room including road at RPF line barrack No-2 at Jaipur & Multi storied building with kote , DSC Reserve company office, store ,CPC canteen, conference hall & improvement to existing dog kennel for line No: I loco colony JP.
S&T related cable shifting/utility shifting for facilitated engineering earth work for construction of fencing /ROB/RUB/LHS /Drain /Bridges repairing etc. in Gondia- Ballarshah section in NAG division of SECR.
Comprehensive Annual Maintenance Contract of 6 Pair Universal Fail Safe Block Interface(UFSBI) Make-Webfil installed in various Block sections over Chakradharpur Division