Loading…
Loading…
17,758 results • Best match
To carry out the Job work required for Operation and petty maintenance supervision by means of pump operator electricianhelper etccomplete job for Sina Kolegaon Paranda LIS total pumps 4 nos including its mechanical and electrical equipments
To carry out the Job work required for Operation and petty maintenance, supervision by means of pump operator, electrician,helper etc.complete job for Sina Kolegaon (Paranda) LIS total pumps - 4 nos..including its mechanical and electrical equipments with all necessaryMechanical and electrical equipment’s with all necessary activities and cleaning activity for Sina Kolegaon (Paranda)LIS for annual rotation for year Schedule B
Insulation work in Boiler Turbine area (services), AOH-2026 as per the scope of work BoQ
Insulation work in Boiler & Turbine area (services) as per the scope of work & BoQ.
MTPS I BM Lift Operation of Boiler Lifts I to IV and attending routine maintenance and Minor repair works of Boiler Lift II and its accessories for one year from the date of commencement of works for 2026 27
Charges for Routine maintenance & Minor repair works of Boiler Lift-II and its accessories.
MTPS I Mill Plant Unit II Hard facing of MS bend and multiple port outlets in coal flow lines Fabrication of MS bend 15 11 10 to suit 508 mm 12 7 mm thick coal pipe line during COH 2024 25
Labour charges for including drawl of materials from stores and removal of old eroded coal pipe after arresting the coal pipes firmly and providing necessary supports or platform and welding coal pipe pieces in MOE/coal pipes below MOE / MPO & Transition piece devolution of scraps to stores. .
Custom Bid for Services - Work of supply, installation and commissioning of emergency break system on motor gear box coupling at the surface direct haulage of Nandgaon Incline mine, HLSA, Chandrapur Area Similar Category Operation And Maintenance Of ... Electro- Mechanical Installations
Chandrapur Area Similar Category Operation And Maintenance Of Electro-Mechanical Installations
(A)Welding of flange in 10inch dia M.S. Pipe, fabrication of 10inch and 8inch dia bend, short piece and tapper pipes (b) extension of delivery of two 4000GPM pump installed on the pontoon at Jarlahi patch sump and maintenance of above pump at AMPC.
Welding of flange, fabrication of bend, shortpiece, tapper pipe