Loading…
Loading…
16,881 results • Latest
online tex bill generation
Construction of yatri Rest work at Gram Panchayat Dharamnagar Me Kali Ji Ke Sthan Par Block Harraiya Distt Basti. (Vidhayak Nidhi Harraiya Basti)
Hariparvat Zone, Room No. 74, Sikandra Enclave Opposite 19/20
Work regarding the laying of underground RCC Hume pipes near Al-Ali Hotel, on the road leading to the New Agra Abbulu Wala Dargah (Hariparvat Zone, Ward No. 44).
the work of construction of 11 KV/L.T. line, double pole for releasing of new connection recived from Jhatpat/Nivesh Portal, line/Pole shifting and other related work under deposit scheme in jurisdiction of EDD, Babrala.
Construction of yatri Rest work at Gram Panchayat Ranipur Ladh Me Indian Gas Agency Ke Bagal Block Dubauliya Distt Basti. (Vidhayak Nidhi Harraiya Basti)
Work for the extension of the drinking water pipeline in Ward No. 16 Rajpura spanning from Krishna Hotel to the houses of Brijbhushan Yadav Pehalwan Yadav and Sonu Yadav.
Construction of Smriti Dwara work at Chauri Nandnagar Marg Par Maharaja Suhel Dev Rajbhar Block Parsarampur Distt Basti. (Vidhayak Nidhi Harraiya Basti)
Supplying and laying 3.00m dia techtube geotextile tube of Anti Errosion work on R/B of Bahanala between from km 16.100 to km 17.000 In Distt-Amroha for the year 2026-27.