Loading…
Loading…
1,409 results • Best match
Balance Work for Upgradation Improvement of Jowai Natrang Khanduli Baithalangso Road under NEC 11th Five Year Plan Programme Ch. 21st to 31Km including construction of RCC Bridge No 27/2 and 31/4
RE-KAMRUP Rural/MMPNA/R_R/01 Rehabilitation of bridge on Dharapur Palashbari Uparhali (Old AT Road) Road (Dharapur Chariali - Upaharali) at Ch. 12.611 Km under Mantrir Path Nabikaran Achani (MMPNA) for the Year 2023-24
CE/EAP/ARRBP/OCB/Bridges-2/Darrang/02 Construction of Bridge in Darrang district i.Br No. 2/1 on Bochachuba Solpam Connecting Road ii.Br No. 1/1 on Katahi Hussain Chuburi Connecting Road
CE/EAP/ARRBP/OCB/Bridges-2/Majuli/06 Construction of Bridge in Majuli district i. Br. No. 1/1 on Garamur to Pathorichuk Road ii.Br. No. 3/1 on Garamur to Pathorichuk Road
SPARE LOAD CELL FOR WEIGH BRIDGES
Construction of RCC Bridge No. 15/2 over river Burisuti on Patiladaha Panbari road in Chirang District under NLCPR. (Balance Work).
Construction of Bridge in Biswanath district i) Br. No. 1/1 on Brahmajan Bagan Road Package No CE/EAP/ARRBP/OCB/Bridge-1/Biswanath/07
ROB/QC/GOLAGHAT/FM-5 Construction of ROB in Replacement of Railway Level Crossing Gate No. FM-5 at Golaghat on Golaghat-Numaligarh Road under Construction of ROBs on 50_50 Cost Sharing Basis
Supply of Electronic Weigh Bridges for Ash-Dyke, NTPC- Bongaigaon (BgTPP), Installation, Commissioning, Stamping and other works of two (2) Nos. of Electronic Weigh Bridges, Supply and installation of MS Portable Cabin for Ash-Dyke
KAMRUP METRO/MMPNA/R_R/02 Repair AND Rehabilitation of bridge located at Azara Rani Loharghat (Rani NEC Road (Rani Chowk-Loharghat) at ch. 17.749 Km under Mukhya Mantrir Path Nabikaran Aachani for the year 2023-24
SOPD_G_20_21_40 Construction of RCC Bridge connecting Chachani Belbari Ali and Tikirabalighat over river Buridihing under SOPD-G for the year 2020-21
Construction of RCC Bridge No 1/1 on Nirmola Bagan Road under SOPD (ODS) under Gohpur Civil Sub Division Territorial Road Division, Biswanath for the year 2020-21. Package No. TRC/SOPD (ODS)/ GOH/03.
Consultancy Services for Authoritys Engineer for construction of major bridges over river Subansiri at Ghunasuti with approaches and Pagladiya with road connecting Kumarikata and Nayabasti on EPC mode
Construction of Bridge in Morigaon district i) Br. No. 3/1 on Garmari Bangalpara Sukutipara Road Package No CE/EAP/ARRBP/OCB/Bridge-1/Morigaon/06
Construction of Bridge in Cachar district i) Br. No. 1/6 on Nagadum Aughustha Nagar Road Package No CE/EAP/ARRBP/OCB/Bridge-1/Cachar/09
Package no CE/EAP/ARRBP/OCB/Bridges-2/Tinsukia/15 Construction of Bridge in Tinsukia district i) Br. No. 1/1 on Patorhal to Hollowgaon ii) Br. No. 3/1 on Tamuli to Borgura Road
Construction of RCC Bridge Bongaigaon ASTC to chaprakata GP office via Birjora Tea Factory Birjora Tea Estate Road CE/EAP/ARRBP/OCB/Bridge1/Bongaigaon/10
ROB/QC/MANCOTTA/CS-4 3rd Party Monitoring_Quality Control for the Work Construction of ROB at LC gate No.- CS-4 on Mancotta Road, Assam under Construction of ROBs on 50_50 Cost Sharing Basis
ROB/PANIKHAITI/ST-20 Construction of ROB on SH-3 (Narengi-Bhakatgaon Road) at Railway Crossing Gate No- ST/20 at Panikhaiti, Kamrup (Metro) under Construction of ROBs on 50-50 Cost Sharing Basis
Construction of RCC Bridge over Pasnoi River at Chutiapara in Udalguri District (Balance Work) under SOPD BTC for the year 2024-25.
Rehabilitation of RCC bridge No. 9/1 on Barpeta Baghbor road under SOPD G for the year 2019-20 under Barpeta Baghbor and Chenga Territorial road division.
Immediate Restoration of Flood Damaged Road of Kaldoba Gharialdanga Tamarhat near Jinkata Road under SDRF for the year 2021-22 (Repairs to Bridge approaches of RCC Br. No. 3/2)
Immediate Restoration of Flood Damaged road from ASS Road to Kadomtola Harirdham Road under SDRF for the year 2021-22 (Repairs to Bridge approaches of RCC Br. No. 1/1).
NRL_DEPOSIT_25_26_03 Construction of RCC Foot Bridge at Jugibari Lake including Approaches in Khumtai LAC for the year 2025-26 under Golaghat and Khumtai Territorial Road Division (Khumtai LAC,NRL Deposit Work)
Temporary Repair and Rehabilitation of Bridge No. 142/1 on NH-17 (New)/ NH-37 (Old) at Khanamukh under PWD, Guwahati NH Division, Guwahati under Contingency provision of Job No. TA/14/2021-22/264(2nd Call)
Construction of Bridge in Sonitpur district i) Br. No. 1/1 on Harchura Bagan to Factory connecting Road Package No CE/EAP/ARRBP/OCB/Bridge-1/Sonitpur/03
CE/EAP/ARRBP/OCB/Bridges-2/Darrang/06 Construction of Bridge in Darrang district i.Br. No. 1/1 on Namkhola Bahmolla Kuhiarkuchi Road ii.Br. No. 1/1 on Gariapara to GG Road Dakhin Bokrajhar Road
SOPD_G_24_25_31 Construction of Low Cost RCC Bridge over Jatinga River at Kachukhal including approaches work under SOPD-G for the year 2024-25.
SOPD_G_20_21_209 Construction of RCC Bridge No. 8/1 on Barama Dhamadhama Tamulpur Road under SOPD-G for the year 2020-21, Tamulpur LAC
Chi/AD19-20/04 Construction of road with RCC Bridge at Lonthai Ashram, Panabari, Bijni under Assam Darshan for the year 2019-20
Immediate measures to restore damage due to flood on the L/B of river Kundil at 8th mile RCC bridge for 2019-20
ROB/QC/MANCOTTA/CS-4 3rd Party Monitoring_Quality Control for the Work Construction of ROB at LC gate No.- CS-4 on Mancotta Road, Assam under Construction of ROBs on 50 50 Cost Sharing Basis
ROB/QC/NAKARI/RM-257 3rd Party Monitoring_Quality Control for the Work Construction of ROB at LC gate No.- RM-257 at Nakari on Rangajan Road under Construction of ROBs on 50_50 Cost Sharing Basis
ROB/QC/DIBRUGARH/2 DD 3rd Party Monitoring and Quality Control for the Work Construction of Flyover at Amolapatty Junction on Old NH-37 in Dibrugarh District of Assam (ROB at LC Gate No.-2DD)
Construction of Access Roads (I) From NH-17 to Kharboja Village via Railway RUB No.364(A), (II) From NH-17 to Bar-Makri Village via Railway RUB No.369(A) under SOPD(G). Package No.SOPD_GSSRC_13
CE/EAP/ARRBP/OCB/ Bridge1/Cachar/25 Repair and Maintenance of Bridge in Cachar District i) Br. No 1/1 Sonai Kabuganj road to Jaraghul Bazar
Construction of Bridge in Dibrugarh District i) Br No 5/1 on Romai Road
Construction of Bridge in Dibrugarh District i) Br No 6/1 on Romai Road
Construction of 6.0m wide FOB from Air Concourse to Secondary Station Building, Extension of Parcel FOB to New RMS Building including provision of ramps for movement of goods and passengers, Construction of Departure Terminal for Darjeeling Himalayan ... wide FOB from ... existing FOB and ...
Construction of Bridge i) Br. No. 5/1 on Nagajanka to Udoipur Road
Assam Mala/Nalbari/01 Improvement and Widening of Ghograpar Damodardham Bijulighat Road including construction of Bridges and other CD works
Immediate Restoration of Flood Damaged road from Bidyerdabri to Kadamtola near Charak Mandir Road under SDRF for the year 2021-22 (Repairs to Bridge approaches of RCC Br. No. 1/1).
Package No. ROB/ST-5/ASSAM/BHARALUMUKH/01 Construction of ROB at LC Gate No. ST-5 at Km-8/2-3 on R.K. Choudhury- M.G. Road under Construction of ROBs on 50_50 Cost Sharing Basis
Construction of ROB near Hawaipur Railway Station including construction of Bypass Road between Kheroni Chariali in West Karbi Anglong and NH-27 near Dalmia Cement Plant, Bamungaon under SOPD Package No. ROB/HAWAIPUR/SOPD/ASSAM/01
ROB/DD-21/ASSAM/LAHOWAL/01 Construction of ROB at Junction point of LBT Road and NH-37 at Lahowal in replacement of LC Gate No.DD-21 under Construction of ROBs on 50_50 Cost Sharing Basis
CE/EAP/ARRBP/OCB/Bridges-4/Nalbari/07Constrn of Bridges in Nalbari dist i.1/1 Chilling to Jabrihati Rd ii.1/1 Tantrasankara to Nalbari Rd iii.1/1 Howlighat over BaraliaJan of Brahmaputra Rivr Emb iv.1/1 Chakla LP Schl to No2 Kandhabari Baralia PubPar
Technical Audit Consultancy services for Assam Resilient Bridge Rural Bridges Program (ARRBP)
CE/EAP/ARRBP/OCB/Bridges-2/Chirang/03 Construction of Bridge in Chirang district i) Br No 1/1 on Uttar Islakata to Dorogaon Village Road ii) Br No 1/1 on Khamarpara to Tengnamari Road
Dibrugarh/CRIF/2023-24/02 Construction of RCC Bridge over River Buridehing at Romaighat including Approaches and Protection work in Lahowal LAC (Bridge Length 360m (6X60m).
CE/EAP/ARRBP/OCB/Bridge1/Hailakandi/09 Construction of Bridge in Hailakandi District i) Bridge on Abdullapur Vernerpur Road