Loading…
Loading…
1,151 results • Best match
Additional Work Constt of RUB at Km 103/9-10 HMGH-Dabli Rathan bhantinda Suratgarh Railway Section
Additional construction work (Precast Wingwall) of RUB at Rly chainage 141/7-8 of Anupshahar-Sidhmukh Section
Additional Construction work in RUB at HMH Sadulpur Railway chainage 167/3-4 and 165/7-8
TRD work in connection with launching of various RUB, LHS and Cattle sub ways over the division
Additional Construction work in RUB at HMH Sadulpur Railway chainage 170/6-7 and 169/3-4
Additional Construction work in RUB at HMH Sadulpur Railway chainage 161/1-2 and 151/1-2
TRD work in connection with launching of various RUB, LHS and Cattle sub ways over the division
TRD work in connection with launching of various RUB, LHS and Cattle sub ways over the division
Const. of RUB on Raikabag Jaisalmer Section at Ch. 112/56 (Gram Panchyat Roopana Jaitana Near Lohawat)
Construction of RUB at Railway Chainage Km. 114/3-4 of HMH SDLP Railway Section (City Bhadra)
Construction of RUB at of Bhatinda Suratgarh Railway Section (Sangria-Manaksar) at Chainage KM 71/7-8
HYD HOSE RUB SAE 100R2 PT MH 39550732 FOR GODREJ FORK FT MODEL 4x200 D , 4x350 D
Bridge construction work between village connectivity road Bambulia Ranmal to Khedli Shahran
Providing and Fixing Steel ward rob Shutter (almirah type) and other miscellaneous work (as Remaining Aluminium ventilator in Basement and Greating on Drains and Sun LED Light at Modular Partition and wooden ward rob at H.O. Building Jaipur
Consultancy Services for Preparation of DPR including Land Acquisition and detailed design and drawing of Road and ROB (1 Nos) for Construction of BYe-Pass Road From NH-458 to NH-58 Bypass Road with ROB DPR (15 Km)
CONSULTANCY WORK FOR JAITPURA TO JAISINGHPURA BYEPASS FROM SIKAR ROAD (1 NO. ROB AND 14 KM LA)
Additional work of Remaining work construction of ROB (Excluding Railway Portion) for LC No. 38 at Baran
Development and maintenance (for 1 year) of Horticulture work under ROB L-70, near Mahatma Gandhi Hospital.
33KV LINE SHIFTING WORK FROM UNDER CONSTRUCTION ROB JODHRAS CHOURAHA TO 700 MT. EAST SIDE DOUBLE CIRCUIT
Electrification work from ROB Town to Sun city colony tibbi road and other various places , Hanumangarh Town.
Consultancy for preparation of Detail Project Report for construction of ROB at Civil Lines Railway Crossing, Jaipur
The remaining work of 11 KV and LT line is obstructing the ROB work at Canal crossing.
Additional work of Condtruction of ROB on Hindaun Byepass(including Railway Portion) on Mahuwa-Hindaun-Karauli Road
Consultancy work for the drain near ROB LC-225 and connecting Areas in Zone-2, JDA, Jaipur
Constt of cc road from ashok kumar jhinjha ROB to bhagirath budaniya , ward no 24 ,hanumangarh town
Providing and fixing stone work and grill of Boundary wall at Centeral park Near ROB Hanumangarh town
Construction of Approach Road on Kharpa ITI Road New Railway Line ROB Km. 75.208 in Distt. Jhalawar
Development work (Entrance/Main gate,Walking track,Toilet Blocks etc) at Central park Near ROB, Hanumangarh town.
Renewal of road from Jhotwara ROB to Ajmer Delhi bypass Via Kamani Mod zone 6 JDA jaipur
Construction of Elevated Road at Gopalpura Bypass from Triveni Nagar ROB to Near Gujar Ki Thadi, Jaipur.
Construction of Bridge at Kotraprtap To Malpura majra, Unhel on Richar River Under Roshanbari MIP Jhalawar
Construction of Bridge (VCW) on Moran River at Tamatiya to Jakhda village road up to Chhani
Construction of Bridge on Nakor Peeplikheda Road (on Galita River) Km. 0/440 to 0/550
CONSTRUCTION OF RCC BRIDGE (1 SPAN 8 M) ON RAWALIYA KALAN TO BARWADA VIA AVNI BAGDA HATHNIYAWAL CH. 4/700 UNDER ROAD REPAIR PROGRAMME 2026-27
Consultancy Service for preparation of GAD including seeking approval from Railway and Road Authorities and detailed Project Report for Widening and upgradation work of Existing Two lane ROB to Four lane ROB at Nawalgarh Road under PWD Sub Dn Piprali
ReConstruction of Reengus ROB Destressed RE Wall LHS and Strengthening of Existing Reengus ROB RHS in Jaipur-Reengus Sikar section of NH 52 from km 296.200 to 297.350 (Total Length 1150m) in the state of Rajasthan on item rate (Percentage) basis
Remaining Construction of RUB at Rly chainage 150/10-11 Sidhmukh-Narwasi. (New Railway Chainage-150/6-7)
Consultancy Work for Preparing GAD, DPR and Land Acquisition for Construction of RUB at Chuna Phatak in Hanumangarh
Permanent Restoration Work on road A/R RUB from Loha to Sangasar Km 0/0 to 5/50
Remaining Construction of RUB at Rly chainage 153/3-4 Sidhmukh-Narwasi. (New Railway Chainage-153/5-6)
CONSTRUCTION OF RUB IN BETWEEN RAILWAY PILLAR NO. 73 0 TO 73 1 AT CHACK 81 GB ANUPGARH
Construction of Bitumen road FCI Godam main road to RUB Via Meera colony ward No 34 Hanumangarh Town
Construction of RUB between Molisar-Ratangarh Railway Station on Ratangarh Churu Section at Rly Chainage 312/0-1
CC road construction work from Wangish Colony and RUB to BS Gupta house, Ward No. 49 Hanumangarh Junction
PAINTING WORK FOR BEAUTIFICATION ON PUBLIC WALLS AND BRIDGES AT CIVIL LINE ZONE AREA
ELECTRIFICATION WORK AT SURATGARH ROAD RUB NEAR KISHAN PARK HANUMANGARH JUNCTION AND PARK IN WARD NO.41 HANUMANGARH TOWN
supply and installation work of led tri colour strip light on tubular/octagonal pole at RTO ROB jodhpur
suplly of veer tejaji statue at saran nagar rob under and maharana pratap statue at ganesh mandir premises
Utility Shifting of HT / LT Line work at Construction of ROB in LC No. 265 Sikar Jhunjhunu Road
OHE modification work in C/W the provision of ROB at LC-1 & LC-2 of Ajmer division.