Loading…
Loading…
43,414 results • Best match
Maintenance of Foot over Bridge at Swapna theatre Kattedhan road in Rajendranagar Circle-11, GHMC.(A S Date 01-08-2025, Budget Year 2025-26) (Rs. 13.25 Lakhs)
ESTIMATE FOR THE COST OF PROPOSED RETAINING WALL NEAR FOOT OVER BRIDGE AT THUSHAGIRI ECO-TOURISM UNDER THUSHARAGIRI VSS IN EDATHARA SECTION OF THAMARASSERY RANGE DURING 2020-21
CONSRUCTION OF FOOT OVER BRIDGE AT KM 335.100 ON ZOZILA-KARGIL-LEH ROAD NEAR LAMDON JAMYONG SCHOOL KHALTSI UNDER AOR 81 RCC/16BRTF/ PROJECT VIJAYAK IN LADAKH (UT)
Aluva Mahadevar devaswom-Paravur group--Concreting the pathway infront of foot over bridge to prevent the water stagnation, clay and silt during the time of Karkkidakavavu and sivarathry.
2023-Eng08-93-123 Dismantling of exisint Homeopathi Clinic and reconstruction of Building (G+1) near foot over bridge at Krishna Nagar in Ward No.93 (2nd call)
Construction of High level Foot over Bridge across the Branch of Vasista River in between Chakalipalem and Kanakayalanka connecting Vasista Left flood in Palakollu of West Godavari District
2023-Eng08-93-123 Dismantling of exisint Homeopathi Clinic and reconstruction of Building (G+1) near foot over bridge at Krishna Nagar in Ward No.93 (2nd call)
Rehabilitation of High Level Bridge across Thenpennaiyar at km 0/2 of Pennaiyar Bridge approach road-SHU-47
Construction Of Bridge And Imp of Malegaon - Andga Road Km 2/00 to 3/00 ODR 163 TQ Loha
PROPOSED THE CONSTRUCTION OF BRIDGE AT- HANUMAN NAGAR NEAR TATYASAHEB SIRSAT SCHOOL MUNICIPAL COUNCIL AKOT TQ-AKOT DIST-AKOLA
CONSTRUCTION OF BRIDGE ACROSS LOCAL NALA BETWEEN MATKOM GHAT BETWEEN BALIDIH AND KHAJURDANGAL IN PAKURIA BLOCK OF PAKUR DISTRICT
Construction of 4 lane/2 lane Major/Minor bridges in the Stretch from km 251 (Golawali) to km 310.00(Anjanari) section of NH-66(Erstwhile NH-17) in the State of Maharashtra under NHDP-IV onPakage II (Balance Work ) 2nd call
Maintenance of road from Bridhyanagar Opposite to Air Station to Howrah Foot Bridge up to Newly Constructed RCC Bridge L 1.00Km during the year 2022 23 SH Mtc. of Black top road by re carpeting patch grouting and stripping of excess soil etc......
Annual and Repair Work Including Survey and investigetion in Bridges Under P W D Bridge Construction Sub Division BalaGhat Part 1
For Performing details survey and investigation and collection of hydraulic data for bridges and approaches under Bridge construction Sub division Raisen
Execution of balance work of earthwork in formation, construction of minor bridge, major bridge, boundary walls, end goomties, service roads, P-way work, supply of ballast and other allied miscellaneous works between Dadhapar-Bilaspur in connection with "Construction of 4th line between Dadhapar-Bilaspur-3.48Km
FDR TO (A) SUGAON SOMTHANA KUNTUR SANGVI DHANAJ HUSSA RAHER ROAD MDR-52 MAJOR BRIDGE IN KM 70/500 (B) SHELGAON (CHATRI ) SUJLEGAON AURALA KOUTHALA DUGAON ROAD MDR-118 TO MINOR BRIDGE IN KM 0/300 1/900 (C) IMPROVEMENT TO SHIRUR TEMBURNI ALUWADGAON MAR
Project Management Consultancy services for Checking of Designs, Construction Supervision, Quality Assurance, Quality Control & Quality Audit for the work of " Construction of High Level Bridge at Missing Link Corridor No. 99 on Musi River and ... of High Level Bridge connecting ...
Construction of High level Bridge across NSP Canal at km 14/10 of Addanki - Santhamaguluru road SW:- Conducting Soil Investigation and Sub soil exploration, Soil testing and pre survey for Construction of High Level Bridge across NSP Canal at Km 14/10 of Addanki - Santhamaguluru road in Bapatla District.
Construction of High level Bridge across NSP Canal at km 14/10 of Addanki - Santhamaguluru road SW:- Conducting Soil Investigation and Sub soil exploration, Soil testing and pre survey for Construction of High Level Bridge across NSP Canal at Km 14/10 of Addanki - Santhamaguluru road in Bapatla District.
A) Repairs to Bridge at Ch.0/800 and 5/200 on Dongaon Kingaon Haripura Yawal Atrawal Bhalod Amoda Road MDR-11 and B) Repairs to Minor Bridge on Naigaon Chunchale Sakali Shirsad Manvel Thorghavan Road MDR-12 Km.9/400 Tal.Yawal (FDR) (IInd call)
03 ROB works on Itarsi - Jabalpur section of Jabalpur Division of WCR. (1) Construction of Road Over Bridge at LC No. 231 at Km 790/33-35 on JBP - ET section (Span 1x30M+1x24M) Composite Girder (2) Construction of Road Over Bridge at LC No. 234 at Km ... of Road Over Bridge at ...
Reconstruction of Minor Bridge at km 3/10 of E.Keeranur Pudukulam road in Lieu of existing piped causeway
KATTUKUKKE AMBALAM BANDHARADAMANE DRINKING WATER SOURSE PROTECTION AND FOOT BRIDGE-ENMAKAJE GP
Constt. Of Foot Bridge at Kalyan Kass to Bela Ward No 06
Construction of Foot Bridge at Nelhew Nallah, Panchayat Nelhew, Block Lohai Malhar
Constt of Foot Bridge at Amritpura W.No 5 Pyt Chinyas Block Jakyas
Constt. Of Foot Bridge at sewa Pyt Rokali Block Chiralla (BDC Grant)
Constt of Foot Bridge at Gandow Nalla Pyt Gandow A Block Jakyas
Constt of Foot Bridge at Bhalak W.no 2 Panchayat Bhandar Block Bani
Construction of new foot bridge near he house of sadik Kalinagar Grampanchyat
Construction of Foot Bridge with Guide Protection at 3 No. Busty, Simulbari.
Repair of foot bridge at RD 15550 M of Main Ranbir Canal.
Constt. of 30 Mtr. Span Steel Foot Bridge at Rachoo Raghi-Nallah
Construction of cc road over chenchuria mirhati foot bridge under Padamkandi G.P
Constt of Foot bridge bhuson nallah Panchayat Dhoosa Block Changa (PRIs GRANT)
Construction of Foot Bridge at Falshore Nallah Pyt Gaderther A Block Gundna
Estimate for Remodeling of Foot Bridge at RD 33810 of Talwandi Disty
Repair of 99mtrs Span Foot Bridge over Bisran Nallah at Chabutra Kilothran
Constt. Of Foot Bridge At Haddal Doda Pyt Hadal Block Chilly Pingal
Emergent Renovation of Suspension Foot Bridge of Soom,T.E,Bijanabri Block,Darjeeling
Repair of foot bridge across Sukhna-Choe in village Mauli Jagran ,Chandigarh.
Construction of Deck Slab of Dakshin Selmabad Foot Bridge Activity Code - 67582231
Construction Foot Bridge at Rebong busty near Kamala Lepcha house,Rongchong GP
Construction of RCC Foot Bridge between Chaplitei and Upper Tinkaterey, Kumai GP
Construction of foot bridge at km-6.90, 10.85 and 16.55 of I.R.M.C
Constt of Foot Bridge at Katli Nallah, Panchayat Nagali,Block Dhar Mahanpur
Cleaning of nallah starting near foot bridge along Dakragarha under Ashok OCP.
Constt. Of Foot Bridge at Kalyan Kass to Bela Ward No 06
Const of Foot Bridge over nallah Jalaad Near ST Mohalla Kalphater Kathua