Loading…
Loading…
632 results • Best match
Construction of brick soling road from PWD road near Ratan Baidya house to Steel foot bridge at North Sonaichari GP under Hrishyamukh RD Block
Construction of 2 (Two) Nos RCC Foot Bridge at RD Jampuijala Sub Division under RD Bishramganj Division within Sepahijala District during FY 2021-22
Maintenance of steel foot bridge near Pandit Krishna Tripura house at Manirampur ADC village of Hrishyamukh RD Block, South Tripura District (PWD SoR-2023)
Construction of RCC foot bridge over Burima River on the way from Nabasardar Para to Bairagi Para under Jampuijala RD Block (PWD SoR 2020).
Maintenance of steel foot bridge near the land of Kamal Shil at Dhananjoynagar VC under Hrishyamukh RD Block, South Tripura District (PWD SoR-2023)
Creation of Water Body at Tarasundari Dam SH Construction of RCC Foot Bridge crossing the Water Body under Mohanpur Agri Sub Division. Part I
Repair and Maintenance of steel foot bridge over Muhuri river at Duluchara near the LI Scheme at Uttar Jolaibari GP of Jolaibari RD Block
Repair and Maintenance of Steel Foot Bridge near Sarat Chandra School at Paschim Singhicherra GP under Khowai RD Block as per PWD SoR-2023.
Const. of RCC foot bridge over Sangamcherra on the way of Ampi Bazar to Haripur Road, Ampi VC under Ompi RD Block (5th Call).
Construction of RCC foot bridge over Dumbur Hydel project at Brishaketu Para under Nakyacharra VC of Dumburnagar RD Block under RD Gonda Twisa Division.
Maintenance of Barabhaiya Steel foot Bridge over Kachugang Chara near Bagma Police Station at Barabhaiya GP under Tepania R.D.Block during the year 2020-21
Construction of RCC foot bridge from Sunil Ghosh land to Swapan Ghosh land at ward No. 06 under Satdubia GP under RD Mohanpur Division.
Construction of RCC foot bridge at Dolucherra at Uttar jolaibari GP under Jolaibari RD Block during the FY. 2025-26 (Based on SoR 2023)
Construction of RCC foot bridge near Bhatkhola bazar at Abhangchara under Jashmura GP of Rajnagar RD block under RD Santirbazar Division (PWD SoR-2023)
Construction of RCC Foot Bridge over Sambhucherra (Sonacherra) connecting Santinagar GP to Purba Chebri GP under Khowai RD Block as per PWD SoR-2023
Repairing of RCC bridge at Karaicharra over Hydel pipeline network at New Gomati VC, Karbook RD Block
Construction of RCC bridge over Ratacherra and Juricherra on the road from MDF road to Emrapassa at ch 0 point 30 KM and at Ch 3 point 00 KM during the year 2023 24 SH Strengthening of Approach road of RCC bridges two 2 nos by WBM Carpetting etc
Bridge construction items
BRIDGE WORK
Const. of RCC foot bridge n/h of Nani Gopal Purkayastha s/o Lt Rasaraj Purkayastha ward - 07 under Ratiabari GP under Kumarghat RD Division.
Construction of RCC foot bridge L 37.00 Mtr at Taiharchung Bari over Marandi Cherra near Kasoo Bazar under Dakhin Maharani VC of Matabari RD Block.
Construction of RCC Foot bridge over Chamul Cherra at Krishnamani Chow. Para at Atharamura ADC Village under Mungiakami RD Block as per (PWD SoR 2020)
Construction of RCC Foot Bridge over Lembucherra at Karbong Para under Rupacherra G.P for Karbong Community under Teliamura RD Block as per PWD SoR - 2020
Const. of RCC foot bridge from Manikpur Lalitdhan RP to Bhagya Ch. RP over Manu river under Devacherra VC under Chawmanu RD Block, LTV Dhalai.
Repair and Maintenance of Steel Foot Bridge at Lamapara Barabil Ward No-4 near Jabbartilla Bazar under Khowai RD Block as per PWD SoR-2023
Const. of RCC foot Bridge H.O Himanshu Chandra to H.O Harekrishna Das of Aralia Main road link road salbagan sukants colony under ward no27, AMC
Construction of RCC foot bridge over Gnganagar Twisa at New Jatindra Para Colony of Ganganagar VC of Ganganagar RD Block under RD Gonda Twisa Division
Maintenance of steel foot bridge over Gomati River at Telkajla G.P under Mohanbhog R.D Block during the FY 2026-27 (PWD SoR 2023)(2nd call)
Construction of RCC foot bridge over Chawmanu river on the road connecting from Khetricherra to Devendra KP of East Chawmanu VC under Chawmanu RD Block
Repair of bridges
Maintenance of road from Rajnagar RCC Bridge to Pitra Bazar(l - 1.50 km) during the year 2020-21.
Maintenance of steel foot bridge near Das Para Patari Land of Das para under Haripur GP of Hrishyamukh RD Block, South Tripura District (PWD SoR-2023)
Construction Of RCC Foot Bridge (20 mtr) over Hari Mongal Charra at Mulla mura in Boxnagar GP Under Boxnagar R.D Block(SOR-R and B 2023)
Const. of RCC foot bridge over Kamai Chaerra from Kathalia Thalibari road , Batta Para at Kathalia GP W-03 Under Kathalia RD Block. (PWD SoR 2020)
Maintenance of Paver Block Road from Gouranga Das house to Ratia Foot Bridge under South Durgapur G.P under Kalyanpur RD Block as per PWD SoR 2023.
Repair and Maintenance of Steel Foot Bridge near the land of Padma Kr Debbarma at Akhrabri VC under Padmabil RD Block as per PWD SoR-2023
Construction of RCC (Cantilever) foot bridge over Saida Cherra near the house of Amulya Debnath to Gopal Sen House at Ganganagar GP under Kumarghat RD Block.
Mtc. of Steel foot Bridge at Bairagi Para under Kendraichera VC under Jampuijala R.D Block under RD Jampuijala Sub Division, Sepahijala during the year 2025-26
Const. of RCC foot bridge over Noachara river School Para Sushil das land to Agri Farm at School Para Under Nalchar RD Block. (PWD SoR 2020)
Construction of RCC Foot Bridge over Suddhacherra from Karailong Kalibari to Karailong Shibbari and Ananda Marg School under Teliamura RD Block as per PWD SoR 2020
Construction of RCC foot bridge over Ramgul cherra near Masjid Wno 1 at West Panisagar GP of Panisagar RD Block under RD Dharmanagar Division North Tripura
Mtc of road from Kumarghat RCC Bridge to Tarun Saha huose via Shibtali and NH 08 at 82mile to kanchanbari RCC Bridge via 60 ghar para Length 1200 mtr plus 3600 mtr during the year 2021 22 SH Patch WBM carpeting and seal coat etc
Replacement of Existing SPT bridge No 1 by RCC Bridge over Juricherra on MDF road to Laljuri road at ch 0 point 10 Km during the year 2020 to 21 SH Construction of Approach road of RCC Bridge by Earth filling Brick soling etc
Mtc. of Steel foot Bridge at Chandra kumar Para under Sangkuma VC under Jampuijala R.D Block under RD Jampuijala Sub Division, Sepahijala during the year 2025-26.
Construction of RCC foot bridge from Santanu Chakraborty pond to Kamal Chakraborty pond in Ward No-4 of Paschim Nalchar GP under Nalchar RD Block, Sepahijala District
Construction of Foot Bridge to connect Picnic Island and Narikel Kunja Island along with approach at Narikel Kunja, Gonda twisa, Dhalai Tripura during the year 2024-25.
Const. of Approach road (74mtr), Protection work and drain (28 mtr) near Rasiram Sepai para RCC Foot Bridge over Dundra charra under chargaria VC, Mandwi RD block
Construction of RCC foot bridge over Ramgul cherra near Sri Gopal Krishna Sevasram (Wno 1) at West Panisagar GP of Panisagar RD Block under RD Dharmanagar Division
Strengthening of Kamalpur- Maracherra-Ambassa road near Salema RCC bridge to Kachucherra Police station via Kakuria tilla.
Maintenance of Iron Removal plants and pipeline at various sections at pump house near RCC Bridge at Tripura University campus