Loading…
Loading…
632 results • Best match
Construction of RCC Foot Bridge on the way from PWD road to Cremation Ghat at Khamarbari VC (including development of Cremation Ghat) under Teliamura RD Block, Khowai District (as per PWD SoR 2023)
Construction of 2 (two) nos RCC foot bridge at Dhalai District under RD Manu Division namely i) Over Baglaicherra under Manu RD Block, ii) Over Govindacherra at Govindabari VC under Chawmanu RD Block.
Maintenance of Purba Barabhaiya Steel Foot Bridge over the river of Kachugang near the land of Hiralal Nandi (middle portion to last portion) at Purba Barabhaiya GP under Tepania R.D.Block , Udaipur , Gomati District.
Construction of RCC foot bridge over Juri river in between Mangalkhali GP of Jubarajnagar RD Block and Uttar Deocherra GP of Panisagar RD Block under RD Dharmanagar Division during the year 2026 27
Mtc. of Steel foot Bridge on the way of PWD Office at Takarjala Bazar under East Takarjala VC under Jampuijala R.D Block under RD Jampuijala Sub Division, Sepahijala during the year 2025-26
Maintenance of Kulai baazar to Lalchari RCC Bridge approach road during the year 2019-20 SH- Construction of Slab culvert, drain (Length 90.00 metre) etc.
Mtc. of road from Joypur RCC bridge to Dashamighat Club ch 0.75 to 1.50 SH Patch Mettaling, Recarpetting, Patch Grouting etc. during the year 202223
Construction of RCC Bridge Length 140 m over river Manu on Sonaimuri Telia Road Job No TP COM 252 08 09 Balance Work 2nd Call
Maintenance of road from Bridhyanagar (Opposite to AIR Station) to Howrah foot bridge up to newly constructed work under the jurisdiction of Khayerpur Sub-Division, PWD(R and B) during the year 2026-27
Repair and Maintenance of Steel Foot Bridge at PWD road to Baraibari over Champatali twisa near the house of Rabindra Debbarma at Paschim Champahour VC under Tulashikhar RD Block as per PWD SoR-2023
Mtc. of Steel foot Bridge on the way from Tirtha Kumar para to Druba Kr para under Kendraichera VC under Jampuijala R.D Block under RD Jampuijala Sub Division, Sepahijala during the year 2025-26
Protection of Dhanai river Bank Right at Nichanchandrapara near R C C Foot bridge under Mandai Block during the year 2019 20 SH Bank revetment work by providing and placing of cement concrete Block
9. Flood Damage Repair to the road from Jogendranagar Railway Over Bridge to Bangeswar Cross Girder Bridge via Malaynagar GP and Anandanagar GP L 5 Point 20 Km under Dukli Sub-Division PWD RandB during the year 2024 - 25 / SH Removal of side shoulder
Construction of RCC bridge over river Manu at Chantail Ferighat on Paitur Bazar Sonamura road at CH. 2.35 km, sanctioned for implementation under NABARD RIDF XXIII, Job No TP /COM/13/2018 19. 2nd Call
Maintenence of Bailey type unit Steel Bridges on different roads under the jurisdiction of Killa PWD(RandB) sub-division.
Maintenance Road from Uttar Champamura Panchayet office to newly constructed RCC bridge over the river Howrah during the year 2020 21 SH Grouting and carpeting etc.
Special restoration and retrofitting of the RCC Bridge at Bishalgarh Bazar on AUS (Agartala_Udaipur_Sabroom) road over river Bijoy (L_40 point 00 Metre) during the year 2025_26
Improvement of Uttar Chellagang RCC bridge approach road L-0.65kmSH- Missing soling, WBM,carpeting, seal coating and other allied works etc during the year 2022-23.
Mtc. of road from Joypur RCC bridge to Dashamighat Club ch 0.00 to 0.75 SH Patch Mettaling, Recarpetting, Patch Grouting etc. during the year 2022 23
Construction of approach road for RCC bridge at Joypur towards Hairmara and improvement of road from Hairmara to Camperbazar road under Ramnagar Constituency Assembly 0.80 km
Strengthening of Howrah Embankment of Agartala, West Tripura from Dashamighat to Joypur RCC Bridge by widening, Toe wall, protection work etc. during the year 2024-25.
Mtc. of Steel foot Bridge on the way from Ramcharan Para to Ujian Ghaniamara HS School under Ujan Ghaniamara VC under Jampuijala R.D Block under RD Jampuijala Sub Division, Sepahijala during the year 2025-26.
Replacement of SPT bridge by RCC bridge over Halaicherra on Kailashahar-Golakpur road to NEC- Chydrone road via Rangrung SB school road (Ch. 0.51 km).(2nd Call)
Periodical Repair approach road of Moharcharra RCC Bridge (L-1.70 km)/ SH- Patch Metalling,Grouting, Re-carpetting etc. Under Kalyanpur R.D Block during the year 2023-24
Replacement of SPT Bridge at Ch. 0.3 Km by RCC Bridge on Nadiapurbazar Old NEC Road via Saidacherra sanctioned For implementation under NABARD(RIDF XX) Balance work.
Construction of RCC bridge Length 21.20 m over Ghoramara Cherra on the road from NH 44 to Durganagar Job No. TP COM 28 2017 18 3rd Call.
Construction of RCC Foot bridge over Howrah River from Kathaltali to Ranirbazar at Meghlipara GP under Old Agartala R D Block of West Tripura District under R D Agartala Division during the financial year 2021-22
4. Mtc of road from Udaipur-Killa road to Science city.(L1.30 Km),Road from Joying bari bazar to KillaDewanbari Road and Noabari RCC Bridge Approach road
Construction of new Intake well 1.20 MGD capacity Water Treatment Plant at Teliamura along with construction of pump house, steel foot bridge Civil, Mechanical and Electrical works etc. complete in all respects under RIDF-XXVI. (3rd Call)
Constn. Of 4 nos. community hall at Bhajabrata Sharma, Taraninagar G.P, at Rakhalthali, East Ratacherra G.P, at Ramkrishna Ashram, Kanchanbari G.P, near Hajibari H.S School, Taraninagar G.P and Construction of Bamboo foot bridge over Manu river from
Mtc. of road start from mohanpur bazar to dudhpatil steel foot bridge under PWD(R and B) Sub Division, Jirania during the year 2022-23 SH Patch soling, metalling, carpeting and allied works. (L 300.00m)(2nd Call).
Construction of RCC Foot bridge over Chapacherra river (Moharani Sardar para to Haribhakta Para) at Champaknagar VC under Jirania R D Block of West Tripura District under R D Agartala Division during the financial year 2021-22
Construction of 2 (two) nos RCC foot bridge at Dhalai District under RD Manu Division namely i) Over Kanchancherra at Kanchancherra VC under Manu RD Block and ii) Over Ultacherra at Naithongcherra VC under Manu RD Block.
Construction of RCC foot bridge over branch of Bijoy River near Naru Miah land to Adul Kalam Azad pond under Gazaria GP, Bishalgarh RD Block, Sepahijala District, Tripura during the financial year 2026-27. (PWD SoR 2023).
Strengthening of Howrah Embankment of Agartala, West Tripura from Joypur RCC Bridge to Indo Bangla Border by widening, Toe wall, protection work etc. during the year 2024-25.
Improvement of brick soled road from K-A road (At Manikbhandar RCC Bridge) to Lamboo-Mayachari road via Paul Para under RIDF XXX of NABARD
Construction of Approach Road, CC Block for River Bank Protection, Backfilling behind Abutment, RCC Railling Wearing Coarse over Deck Slab in connection with Constructed RCC Foot Bridge over Khowai river at South Durgapur GP under Kalyanpur RD Block
Maintenance of Steel foot bridge on the road from Hari kumar nath para to Manipuri colony over Dinadayal charra near the land of Bidhu Debnath under West Ghilatali GP of Kalyanpur RD Block (as per PWD SoR-2023).
Please refer DNIT100
Replacement of SPT Bridge by RCC Bridge over Raipassa cherra on Batbagan to Barabari road under Ambassa Constituency (0.04 km), Job No. TP/COM/81/22-23.(2nd call)
Mtc. of different Bailey bridges under PWD(RandB) Panisagar Sub-Division during the year 2023-24
Mtc. of Different Bailey bridges under PWD(RnB) Panisagar Sub-Division during the year 2025-2026
RCC bridge,approach
SH- Grouting, Patch Metalling, Patch carpeting, seal coat, road side unlined drains etc.(2nd call).
Maintenance of different road under the jurisdiction of PWD(R and B) Khayerpur Sub Division during the year 2022 23 / SH WBM, Re carpeting, seal coating, patch grouting, palasiding, placing of paver block and maintenance of steel foot bridge.
Operation and Maintenance of WTP at Collegetilla and Bordowali during the year 2022-2023. 4 MGD SWT Plant at Bardowali, Cleaning of sludge deposit inside and outside and Maintenance strengthening of foot bridge at Intake Well near Howrah river
Protection of Dhanai river Bank Right at Nichanchandrapara near R C C Foot bridge under Mandai Block during the year 2018 19 SH Bank revetment work by providing and placing of cement concrete Block Length 80 mtr under NABARD
Mtc. of Bailey bridges under Ampi Sub-Division, PWD SH- Provinding and fittings of Transom clamp,Raker,Sway bracing ,Deck nut and Bolts and MS welding sheet etc. during the year 2022-23.
Strengthening and improvement of riding quality of the road from Jogendranagar RCC Bridge to Takarjala via Malaynagar, Anandanagar, Srinagar, Brajendra Colony L-25.54 Km under West Tripura and Sipahijala District.
Strengthening of Howrah Embankment of Agartala, West Tripura from Pratapghar Steel bridge to Pratapghar RCC Bridge by raising, widening, soling, Toe wall, protection work etc. during the year 2024-25.