Loading…
Loading…
3,379 results • Best match
Work of electrification of various villages as mentioned in the NIT under EDD 2 Gonda on Semi-TurnKey basis.
Construction of 33 KV KAMAR LINK LINE from 132 KV Sub-Station UPSIDC (Koshi) District Mathura on turnkey basis
Construction of 33 KV KOTWAN LINK LINE from 132 KV Sub-Station UPSIDC (Koshi), District Mathura on turnkey basis
Shifting and Construction of 33 KV, 11 KV, L.T. Line at Medical Collage Deoria in Turnkey Basis in Deposit Head
FATEHPUR SEWERAGE AND SEWAGE TREATMENT SCHEME ZONE-I, DISTT. FATEHPUR, INCLUDING SUCCESSFUL TESTING AND COMMISSIONING ON PERCENTAGE RATE TURNKEY BASIS
CONSTRUCTION OF NEWLY PROPOSED 33/11 KV 1X5 MVA CAPACITY S/S SARKAURA IN DISTT SULTANPUR ON PARTIAL TURNKEY BASIS
CONSTRUCTION OF NEWLY PROPOSED 33/11 KV 1X5 MVA CAPACITY SUB STATION SAIDPUR, RUDAULI DISTT. AYODHYA ON SEMI TURNKEY BASIS
Taping of 33 kv Jalkal line from 132/33 kv s/s Myorpur, Sonbhadra under B.P. 2025-26 (Semi-Turnkey)
Work for shifting of electric pole line etc on semi turnkey basis from Jesis chauraha under EE, EDD-III, Jaunpur.
132 KV DC Jetha400 Atari Malihabad line on ACSR Panther conductor approx. 26.20 route Km of UPPTCL on Turnkey basis
Construction of SAS based 2x63MVA, 132kV Substation Padarathpur (Madhuban), Mau on Double Main and Transfer Bus Scheme on turnkey basis
Construction of 33 KV UPSIDC (Koshi) link line from 132 KV Sub-Station UPSIDC (Koshi) District Mathura on turnkey basis
Custom Bid for Services - For the work of shifting of poles and electrical equipment widening of 33 kV and 11 kV lines on a semi turnkey basis under the Full Deposit Scheme under the jurisdiction of the Electricity Distribution Division Tundla Similar Category Operation and Maintenance Of Electrical Systems/Electrical Installations Operation and Management Service of Electrical Buses Repair, Maintenance and Installation of Plant Systems/Equipments
Supply AND Erection of Outdoor Equipment of 02No. 145KV Bay at 400KV S/S Rasara on turnkey basis Under ETD-Ballia
Taping of 33/11 kv s/s Kewali to existing 33 kv Ranitara feeder, Sonbhadra under B.P. 2025-26 (Semi-Turnkey)
Construction of 33 KV UPSIDC Kosi Link line from 132 KV Sub station UPSIDC Kosi in Distt. Mathura, on Turnkey basis
Issue of 256 KVA new connection to M/s PNC, Aligarh Highways Pvt. Ltd. on Turnkey basis under EDD IInd Etah.
MULTI CIRCUIT Gr. NOIDA(765 KV) TO YIEDA SECTOR-24 YIEDA SECTOR-18 LINES ON MOOSE ACSR CONDUCTOR ON TURNKEY BASIS
RELEASE THE CONNECTION FOR USE IN HABITAT CENTER (NAGAR NIGAM) ALIGARH ON TURNKEY BASIS IN THE AREA OF EUDD-4 ALIGARH
Construction of New Link line (15 km) from 220 kV Substation Sarh to 33/11 kV Substation Paseva On Turnkey Basis
CONSTRUCTION OF 01 NOS. 33 KV HYBRID BAY TO BE CONSTRUCTED ON TURNKEY BASIS UNDER DEPOSIT HEAD AT 220KV S/S HAPUR.
Increasing capacity of power transformer at Rahakalan and construction of 2 nos 11 KV feeders In dist. Agra on semi Turnkey Basis
33 KV Line Shifting at Gwari Crossing (Northern Railway) near Janehwar Mishra Park under Deposit Scheme and related work Semi turnkey basis
Work of releasing additionl load on semi turnkey basis for Jila Sankyut chikitsalaya Sector 23 Sanjay Nagar Ghaziabad under EUDD-I GZB
The work of Installation of 11 KV New 250 KVA DTR under EDC, Etawah ON Semi Turnkey Basis (Business Plan 2025-26)
HASTINAPUR WATER SUPPLY REORGANIZATION SCHEME WITH ITS APPURTENANT WORK ON TURNKEY BASIS IN HASTINAPUR NAGAR PANCHAYAT,HASTINAPUR ,AT DISTRICT-MEERUT, UTTAR PRADESH
Construction of MVA SAS Based 132kV Substation Sisain Belthara Road Ballia on Double Main and Transfer scheme on turnkey basis against ESD620
Development of Infrastructure for electrification of Un-electrified Households on Turnkey Basis under Revamped Reforms-Linked Results-Based Distribution Sector Scheme (RDSS)
Development of Infrastructure for electrification of Un-electrified Households on turnkey basis under Revamped Reforms-Linked Results-Based Distribution Sector Scheme (RDSS)
Development of Infrastructure for electrification of Un-electrified Households on turnkey basis under Revamped Reforms-Linked Results-Based Distribution Sector Scheme (RDSS)
Development of Infrastructure for electrification of Un-electrified Households on turnkey basis under Revamped Reforms-Linked Results-Based Distribution Sector Scheme (RDSS)
Development of Infrastructure for electrification of Un-electrified Households on Turnkey Basis under Revamped Reforms-Linked Results-Based Distribution Sector Scheme (RDSS)
CONSTRUCTION WORK OF OVERHEAD(OH) PORTION OF LILO of 132 kV NARA-BAGHRA LINE 132 KV S/S SUZRU ON TURNKEY BASIS
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Commercial; Electrical System or Installation; SEMI TURNKEY 73/EDC(F)/2026-27
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Commercial; Electrical System or Installation; SEMI TURNKEY 74/EDC(F)/2026-27
Electrification of 08 No. Villages and 22 No. Rajkiya Nalkoop in Sansad Nidhi Deposite Scheme sami Turnkey Basis in EDD-I Prayagraj
CONSTRUCTION OF 7.7 KM. 33 KV SINGLE CIRCUIT LINE FROM 132 KV CHAKIYA TO 33/11 KV SAHABGANJ DISTT. CHANDAULI (TURNKEY BASIS)
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Commercial; Electrical System or Installation; SEMI TURNKEY 69/EDC(F)/2026-27
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Commercial; Electrical System or Installation; SEMI TURNKEY 70/EDC(F)/2026-27
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Commercial; Electrical System or Installation; SEMI TURNKEY 72/EDC(F)/2026-27
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Commercial; Electrical System or Installation; SEMI TURNKEY 71/EDC(F)/2026-27
Replacing LT Over Head bare conductor by LT AB cable and shifting the consumer meters outside the consumer premises on turnkey basis
Civil, MEP and Supply of Capital Items
MAWANA WATER SUPPLY REORGANIZATION SCHEME WITH ITS APPURTENANT WORK ON TURNKEY BASIS IN MAWANA NAGAR PALIKA PARISHAD ,MAWANA AT DISTRICT-MEERUT, UTTAR PRADESH
Rate Contract for repairing and maintenance of HV 33 and 11 KV Underground cable faults in various voltage level cables on Turnkey Basis
Additional estimate for new 11 KV feeder to bifurcate the load of 11 Kv Jamunipur feeder emanated from Carpet City, Bhadohi. (Semi-Turnkey)
11/0.4 KV LT Protection works under business plan 2024-25 (Phase-II) in the area of EDC, Etawah on Semi-Turnkey basis.
Dismantling of old Black Steel tower and conductor and replacement with new tower and ACSR Panther Conductor of 132KV Line on turnkey basis.
Renovation work of Existing 33 KV Line (9.00 KM) Jamalpur, Mirzapur Feeder from 132/33 KV Sub-Station Pirallipur, Chunar, Mirzapur (Semi Turnkey)
Construction and laying of 11KV feeders emanating from 33/11KV Substation (Newly proposed) Amrai and other associated works on turnkey Basis in Lucknow