Loading…
Loading…
3,381 results • Best match
Various Electrical work of electric supply in the area of EDSD IIIrd (Jalesar) Etah (EDD-IInd, Etah) under additional business plan (339 Cr.) on Semi Turnkey basis.
Various Electrical work for strengthening of electric supply in the area of EDSD IIIrd (Jalesar) Etah (EDD-IInd, Etah) under additional business plan on Semi Turnkey basis.
Various Electrical work for strengthening of electric supply in the area of EDSD IInd( Aliganj) Etah (EDD-Ist, Etah) under additional business plan on Semi Turnkey basis.
Installation of Additional 10 MVA Power Transformer at 33/11 KV Power SS Mantri Awas and assoicated work On Semi turnkey basis Under Business Plan 2024 25
Various electric work against Additional Business Plan 2023-24 for quality power supply in Aligarh City on Semi Turnkey Basis in the area of EUDD-2, Aligarh
132 KV Mahoba Mahoba TSS Ckt II line 3.5 km new line 2 km 2nd Ckt Stringing on existing towers on ACSR Panther conductor on Turnkey basis
CONSTRUCTION OF 3.0 KM. 33 KV DOUBLE CIRCUIT LINE FROM 220 KV S/S BHADAURA TO 33 KV GAHAMER AND REVTIPUR TAPPING POINT, DISST- GHAZIPUR (TURNKEY BASIS)
Shifting of H.T./L.T. Line on semi turnkey basis from Garapur to Sikarndra Marg in EDSD Phoolpur Under Electricity Distribution Division-II, Allahabad due to Road winding
Shifting of H.T./L.T. Line on semi turnkey basis from Sahidaganj Ghat sampark marg in EDSD Phoolpur Under Electricity Distribution Division-II, Allahabad due to Road winding
Shifting of H.T./L.T. Line on semi turnkey basis from Nivi Bhadkar Sampark Marg in EDSD Jhunsi Under Electricity Distribution Division-II, Allahabad due to Road winding
The Shifting of 11 KV Line/LT Line due To Widening Of The Road From Rampur to Lehuwa Link Road Jama Yojana Year 2019-20 (Semi Turnkey)
The Shifting of 11 KV Line/LT Line due To Widening Of The Road From Ghorawal To Bardiya Link Road , Jama Yojana Year 2019-20 (Semi Turnkey)
CONSTRUCTION OF NEW 33 11 KV SUB STATION 33 KV 11 KV LINES ON SEMI TURNKEY BASIS AT BHOLEPUR DIVISION DISTRICT FARRUKHABAD OF UTTAR PRADESH UNDER IPDS
CONNECTING 132 KV DOUBLE CIRCUIT OVERHEAD LINE TO BAY IN IIT KANPUR CAMPUS Substation USING UG CABLE 1000sqmm Al XLPE 06 plus 01 spare CABLES ON TURNKEY BASIS
Increasing Capacity of Substation Sec-14 old Indira nagar Lucknow from 3X10 and 1X5 MVA to 4X10 MVA On Semi turnkey basis Under Additional Business Plan 2023 24
Construction of UG portion of LILO of 132 KV NARA BAGHRA AT SUZRU 06 CABLES and spare on turnkey basis with 132kV 630 sqmm al Cond XLPE cable
11 KV Link Line (3.00 Km.)From 33/11 KV S/S Carpet City to Joint the 11 KV Indramil Town Distt.- Bhadohi Under B.P. 2018-19 (Turnkey)
Shifting of H.T./L.T. Line on semi turnkey basis from Sikandra Bahariya to Dandupur Marg in EDSD Phoolpur Under Electricity Distribution Division-II, Allahabad due to Road winding
Work of construction of 33 KV Managarhi, Sakatpur, Bajana and Naujheel Link Line by underground cable laying at 220 KV Sub-station Mant, District-Mathura on turnkey basis
Shifting of H.T./L.T. Line on semi turnkey basis from Patel Nagar to Bariyari Marg in EDSD Phoolpur Under Electricity Distribution Division-II, Allahabad due to Road winding
Conversion of Existing Electrical System feeding the Main Bazaar Area to Underground Electrical System in Farrukhabad Town of District Farrukhabad of UP under DVVNL Agra on Turnkey Basis
Engineering, Procurement, Construction (EPC) inclusive-of 5 Years comprehensive Operation and Maintenance of 9.81 KWp On-Grid Roof Mounted Captive Solar Power Project at Indian Oil Corporation Limited, Aviation Fuel Station, Sarsawa, Saharanpur
Assets Insurance Service - Marine – cum – Erection (MCE), for EPC Package for 1x800MW Ultra Supercritical Expansion Unit at DCRTPP Yamunanagar; Property Damage Cover, Storm, Typhoon, Hurricane, Tornado, Flood and Inundation (STFI) Cover, Earthquake C..
work of replacement of damaged VCB and strengthening of 33/11 KV sub-stations under EDD Modinagar should be done on semi-turnkey basis under Business Plan 23-24.
Various Electrical work for strengthening of electric system in the area of EDD-Ist, EDD-IInd and EUDD, Etah under additional business plan (Varsha Ritu) on Semi Turnkey basis.
CONSTRUCTION OF INDEPENDENT 33 KV LINE FROM UNDER CONSTRUCTION 132 KB SUB STATION SAIDPUR, RUDAULI TO 33/11 KV SUB STATION AMANIGANJ MILKIPUR, DISTT- AYODHYA ON SEMI TURNKEY BASIS
Electrical work for the Extension of load from 17 kw to 325 kw i.e., total load 342 kw of Superintending Lady Hospital, Etah on Turnkey Basis under EUDD, Etah.
Electrical work for the extension of load from 240 KVA to 360 KVA of Chief Medical Officier, District Hospital, Etah for xygen plant on Turnkey Basis under EUDD, Etah.
Various Electrical work for strengthening of electric system in the area of EDD-Ist, EDD-Ind and EUDD, Etah under additional business plan (Grisham Ritu) on Semi Turnkey basis.
CONSTRUCTION OF 552 KMS APPROX OF 132 KV TRANSMISSION LINES ON ZEBRA CONDUCTOR LYING IN DIFFERENT PARTS OF UTTAR PRADESH ON TURNKEY BASIS EXCLUDING SUPPLY OF CONDUCTOR AND EARTHWIRE
Electrification of H.T/L.T Line in Villages Kathula (Airport Bamroli) Shifting Work on the Basis of Semi Turnkey in Different Deposite Scheme year 2017-18 Under EDD-I Allahabad
Shifting of H.T./L.T. Line on semi turnkey basis from Hanumanganj, Chandoha, bagai Jalalpur Sahso Marg in EDSD Phoolpur Under Electricity Distribution Division-II, Allahabad due to Road winding
Facility Management Services - LumpSum Based - Healthcare; O&M of Mechanical Work, O&M of Electrical Work, TurnKey project; Consumables to be provided by service provider (inclusive in contract cost)
As per NIT Tender Document
33 KV JAL JEEVAN MISSON Line from 220 KV Sub-Station Kirawali to JAL JEEVAN MISSION Plant Raybha Achhnera in District Agra on Semi Turnkey Basis under Full Deposit Scheme.
Design Engineering Manufacturing Testing Supply Stringing dismantling Installation ERS Testing Commissioning etc for Diversion Height raising of various 220kV and 132 kV Trans line of UPPTCL of UPPTCL on Turnkey
Construction of Double Circuit 33 KV Line from 220 KV BKT to 33 11 KV S S Puraniya and assoicated work On Semi turnkey basis Under Business Plan 2025-26.
Design, Engineering, Manufacturing, Testing, Supply, Stringing, Installation, Testing,Commissioning etc. for Construction of 132kV transmission line on ACSR Panther,Zebra Conductor 172 Kms with Dismantling and Destringing works on turnkey
CONSTRUCTION OF 10. KM. 33 KV SINGLE CIRCUIT LINE FROM 220 KV S/S BHADAURA (33KV REVTIPUR TAPPING POINT) TO 33/11 KV S/S REVTIPUR, DISST- GHAZIPUR(TURNKEY BASIS)
Shifting of H.T./L.T. Line on semi turnkey basis from Tiwaripur(Ram Padarath) to Sarai Chandi Marg in EDSD Phoolpur Under Electricity Distribution Division-II, Allahabad due to Road winding
Shifting of H.T./L.T. Line on semi turnkey basis from Gorakhpur road Sahso to Ramnagar Hetapatti Gulalpur in EDSD Phoolpur Under Electricity Distribution Division-II, Allahabad due to Road winding
Work of shifting/underground of 33 KV Electric Line at railway crossing of 33/11 KV S/S Railway Road, Etah under deposit scheme on Semi Turnkey basis under EUDD, Etah.
Work of fortification of line Under Business Plan Scheme 2023-24 on semi turnkey basis in the Area of EE, EUDD-VII Ghaziabad. Under the jurisdiction of SE, EUDC-III, Ghaziabad.
Work of various 11 KV overload feeder sepration/LT Line erection and strengthening of other work in the area of EDC Etah under Business Plan 339 Cr. on Semi Turnkey basis.
Construction of proposed 33 KV FARIHA Line from 132 KV Sub-Station FARIHA to existing 33/11 KV Sub-Station Fariha with LILO System in District-FIROZABAD, on (Semi-Turnkey Basis)
Work of fortification of line Under Business Plan Scheme 2023-24 on semi turnkey basis in the Area of EE, EUDD-VII Ghaziabad. Under the jurisdiction of SE, EUDC-III, Ghaziabad.
Work of fortification of line Under Business Plan Scheme 2023-24 on semi turnkey basis in the Area of EE, EUDD-VII Ghaziabad. Under the jurisdiction of SE, EUDC-III, Ghaziabad.
Replacement of 11 KV VCB Panels at 33/11 KV S/S Laulai, Shivpuri and Kamta under EUDD- Chinhat and associated work On Semi turnkey basis work Under AIIB-2023-24.
Capacity of 33 11 KV Power S S Kalyanpur will be increased from 2x10 1x5 MVA to 3x10 MVA and assoicated work On Semi turnkey basis Under Business Plan 2024 25
Capacity of 33 11 KV Power S S Kamta will be increased from 2x10 1x5 MVA to 3x10 MVA and assoicated work On Semi turnkey basis Under Business Plan 2024 25