211 results • Best match
Appointment of Cloud Service Provider or Managed Service Provider to host existing ERP System of TSECL along with Design, Implementation and Support of Project Execution Management System (PEMS) under Revamped Distribution Sector Scheme (RDSS)
Shifting of HT LT Line and sub-station from IOCL land near Kanchanmala rail bridge area under Electrical Sub-Division- Sekerkote New 1.2 km HT line from Tea garden to Rail bridge and 1.2 Km 11 kv line in composite with LT ABC and 10 span LT ABC f
Extension of HT Line/LT line and mtc of dead 11kv line
Extension of 33 KV Line from 33 KV Sub-Station Chawmanu along with installation of necessary equipments and installation of 16 Nos. 33/0.4 KV, 100 KVA Distribution Transformer at 16 Nos. BOPs under ESD - Chawmanu
Construction of 20x63 KVA Substation incl. 1 km HT Line and 1 km LT line for segregation of DWS schemes distribution transformers from public connections within the jurisdiction of ED-Kamalpur
Extension of HT/LT line (HT line through 70sqmm XLPE cable) including construction of 1x63KVA Sub-Station for providing 3-phase Service Connection to DTW scheme at Naraura of Bishalgarh Municipality Corporation
Supply, erection and commissioning of DTW Scheme (05 Nos) by extension of 11 KV / LT line , HT line through UG cable in/c construction of 05x63 KVA Substation for providing new service connection to DTW Scheme
Supply, erection and commissioning of DTW Scheme (04 Nos) by extension of 11 KV / LT line , HT line through UG cable and AB Cable in/c construction of 4x63 KVA Substation for providing new service connection to DTW Scheme of DWS Department under Bis
Supply erection of LT line for service connection
Extension of 5.5KM 11KV HT Line, 2.5KM LT line and mtc of dead 11kv line 7.0km 4nos sub-station LT Line 5km including installation of 1x100KVA, 3 x 63 KVA, 2X25KVA 2X16KVA Distribution Sub-Station
Extension of HT/LT line with installation
R E Works for system strengthening through re-conductoring of existing 11KV line , LT line and Augmentation of DTR i/c. DTR earthing on turnkey basis at North Tripura and Unakoti Districts under DDUGJY Phase- II (2nd Call)
R E Works for system strengthening through re-conductoring of existing 11KV line , LT line and Augmentation of DTR i/c. DTR earthing on turnkey basis at Gomati and South Tripura Districts under DDUGJY Phase- II (2nd Call)
R E Works for system strengthening through re-conductoring of existing 11KV line , LT line and Augmentation of DTR i/c. DTR earthing on turnkey basis at West Tripura and Sipahijala Districts under DDUGJY Phase- II (2nd Call)
R E Works for system strengthening through re-conductoring of existing 11KV line , LT line and Augmentation of DTR i/c. DTR earthing on turnkey basis at Dhalai and Khowai Districts under DDUGJY Phase- II (2nd Call)
Rural Electrification works of North Tripura District in Tripura under Deendayal Upadhyaya Gram Jyoti Yojana
Rural Electrification Works Of Unakoti District Of Tripura State Under Deendayal Upadhyaya Gram Jyoti Yojana.(DDUGJY)
Rural Electrification Works Of Khowai District Of Tripura State Under Deendayal Upadhyaya Gram Jyoti Yojana DDUGJY
Rural Electrification Works Of Sipahijala District Of Tripura State Under Deen dayal Upadhyaya Gram Jyoti Yojana.DDUGJY
Rural Electrification Works Of Dhalai District District Of Tripura State Under Deendayal Upadhyaya Gram Jyoti Yojana DDUGJY
Rural Electrification Works Of South Tripura District Of Tripura State Under Deendayal Upadhyaya Gram Jyoti Yojana DDUGJY
Rural Electrification Works Of West Tripura District Of Tripura State Under Deen dayal Upadhyaya Gram Jyoti YojanaDDUGJY
Rural Electrification Works Of Gomati District District Of Tripura State Under Deendayal Upadhyaya Gram Jyoti Yojana DDUGJY
Shifting of HT LT Line and SS Kamalpur to Manikbhander road double lane ESD Kamalpur
Shifting utility and conversion of OH 11 kv line to UG Cable at ROB 313A between Ambassa to Kachucharra road within the jurisdiction ED Ambassa.
Shifting of HT OR LT line and Sub Station and Reconstruction
Construction of HT/LT line with installation of Distribution transformer including dismantling and erection of existing 1 1KV/LT line and related materials for providing domestic service connection
Ext of 33 KV line from GNR Sub-station to Jenerai Para Fwd inc installion of 100 KVA 33/.433 KV Distribution SS within the jurisdiction under ESD AMB
REDB works (33 KV level) in connection with Rural Electrification works of Unakoti District in Tripura under RE-DDUGJY
Extension of dedicated 11 KV line for flood lighting along the Indo-Bangla boarder fencing at 12 Location in the jurisdiction Sabroom ESD under ED- Sabroom
Extension of dedicated 11 KV line for flood lighting along the Indo-Bangla boarder fencing at 8 Location in the jurisdiction Satchand ESD under ED- Sabroom
Restoration of 11 KV line from 66 KV Switchyard Tirthamukh to DAM which were damaged due to flood under the jurisdiction of Gumti Electrical Division, Jatanbari
REDB works (33 KV level) in connection with Rural Electrification works of Gomati District in Tripura under RE-DDUGJY scheme
Ext of 33 KV line from GNT 33 KV SS to eight nos in/c installation of 100 KVA 33/0.433 KV Distribution SS within the jurisdiction of ESD-GNT
Extension of HT/LT line and Construction of Substation under ED Dharmanagar
Extension of HT/LT line with underground XLPE 3Cx70mm2 at Kalajari BRU
Extension of 11 KV line with 3-core 120 sq. Mm. XLPE UG Cable for Phuldangsei Innovative Water Supply Project, Jampui Hill within the Jurisdiction of Electrical
Extension of HT/LT line i/c. installation of 63/100 KVA DT for segregation and providing 3-phase service connection to the Different DTW Schemes within the jurisdiction of ESD - Manu and ESD - Chawmanu under ED - Manu, LTV., Dhalai District.
Shifting of 11 KV underground cable, Overhead line, LT line and construction of new overhead line and LT line for arranging power supply during construction and after construction of RCC Cover drain
Extension of 14.0km HT Line 4.0km LT line including installation of 2x63KVA 3x16KVA Distribution Sub-Station
Construction of 11 KV LT line Distribution Sub Station for providing domestic Service connection
Extension of HT/LT line including sub-stn for DWS scheme under ED-DMR
Extention of LT line with 1(one) no. 8 mtr. PCC pole for providing Single Phase service connection with laying of PVC cable from nearby electric pole to premises upto 35 meter in length supported by GI wire, Reel insulator i/c fitting fix
REDB works (33 KV level) in connection with Rural Electrification works of North Tripura District in Tripura under RE-Deen Dayal Upadhaya Gram Jyoti Yojana (RE-DDUGJY)
Construction of HT LT Line including 63 KVA Substation under EC Sepahijala Gomti Belonia under TSECL
Providing 3ph service connection to newly constructed DTW pump and HT line extension under ED Dharmanagar part IV
Extension of 2.6KM 11KV HT Line, 5.6KM LT line including installation of 2x63KVA, 2 x 25 KVA, 3X16KVA Distribution
Supply erection and commissioning of HT UG 33 11KV line and 32 11 KV overhead line from new 132 KV Gantry
Providing of HT line through 11KV UG cable along with Installation of 1x63 KVA Distribution Transformer at Samasthi Hotel
Implementation of Onload Transformer Monitoring System (OTMS) for 33/11kV Power Transformers in Tripura under RDSS