Loading…
Loading…
211 results • Best match
Ext of dedicated 11KV border line newly 33/11 KV s/s for IBBFL at Rajkandi, Kalatila ED Kamalpur
Supply erection testing commissioning of HT LT line inst of DT SS for SC to unelectrified PVTG households of Ambassa Block under PM JANMAN SCHEME of ED Ambassa
Shifting of HT/LT line to keep ideal clearance from electricity lines for passing of ONGC rig machine from Durgapur to North Hurua under ESD-II, Dharmanagar (DRAA).
Supply erection commissioning of DWS scheme by extension of 11kv line using UG 11KV/XLPE 3cx70 squr mm cable for providing new 3ph service connection at Kumariakucha Madhya para DWS Scheme under ED Sonamura
Supply erection testing commissioning of HT LT line inst of DT SS for SC to unelectrified PVTG households of Dumbur Nagar Block under PM JANMAN SCHEME of ED Ambassa
Extension of HT/LT line including installation of a 100 KVA Distribution Transformer at Sri Krishna Mission School, Agartala for providing three phase Service Connection under ESD- Capital Complex.
Supply erection testing commissioning of HT LT line inst of DT SS for SC to unelectrified PVTG households of Ganga Nagar Block under PM JANMAN SCHEME of ED Ambassa
Extension of HT/LT line including construction of 15x63 KVA distribution Sub-station for segregation of DTW scheme from other consumer for quality power supply under Electrical Division Udaipur.
Extension of HT/LT line for providing 3 (three) phase service connection to the Establishment of Modern Abattoir for pig cum pork processing plant construction at Karaicherra, Machmara under ESD-Pecharthal
Construction of 11KV/LT line, Distribution sub-station for providing service connection to DTW (DWS) schemes at different locations under Electrical Division Udaipur of TSECL, Gomati District, Tripura. (Total Scheme 20Nos)
Extension of HT/LT line and inst of S/S 25 KVA for Providing 3ph SC at Bhagat Singh Chowmohani, Manikbhander for outdoor advertising event LED Digital media under ESD Kamalpur.
HT LT LINE MATERIALS
Extension of HT LT line and Construction of 11 043 KV 2X 1000 KVA Distribution Sub for MLA Hostel near ILS Hospital under ESD Capital Complex
Extension of LT line (8.0 Mtr long PCC Pole-57Nos) for providing Single phase service connection to 13(thirteen)Nos School Building at different location namely - 1) Chandukchera J.B School--Nil 2) Ruttuk Rai para J.B School -NIL 3) Sachindra Kr.
Extension of HT LT line and Construction of 1X 100 KVA Sub Station for providing three phase power supply system at newly modified IRP including DTW at Khejur Bagan near Bhagat Sing Hindhi English Medium School
Survey, Supply, Erection, Testing and Commissioning of 11KV Line, LT AB Cable Line, Installation of DTs with associated accessories on Partial Turnkey basis at 3 District (North Tripura, Unakoti and Dhalai) in Tripura State under DDUGJY Ph-II
Survey, Supply, Erection, Testing and Commissioning of 11KV Line, LT AB Cable Line, Installation of DTs with associated accessories on Partial Turnkey basis at 3 District (Khowai, West Tripura, Gomati) in Tripura State under DDUGJY Ph-II Scheme
Ext. of LT Line with 1 No. 8mtr PCC Pole for 1ph SC with PVC Cble from nearby Pole to Premises up 35mtr at Diif location fully trunky basis under ED Sonamura
Extension of LT Line with 1- Pole / 2-Pole / 3-Pole for Power Supply to un-electrified household under different GP/VC under Gournagar R.D.Block within the jurisdiction of Electrical Division-Kailashahar.
Construction of 11 KV/LT line, Distribution sub-station for providing service connection to DTW (DWS) schemes at different locations under Electrical Division Udaipur of TSECL, Gomati District, Tripura. (Total Scheme 19Nos)
Extension of LT Line with 1- Pole / 2-Pole / 3-Pole for Power Supply to un-electrified household under different GP/VC under Chandipur R.D.Block within the jurisdiction of Electrical Division-Kailashahar
SH. Construction of 6.16KM 11KV line by ACSR weasel, 13.68KM LT AB cable line (1..Phase / 3.. Phase) along with construction of 09(nine)nos. 25KVA distribution substation for providing service connection (1..Phase) to 376 nos DA.JGUA households
Extension of LT line with 02 poles for each consumer for electrification of unelectrified households under Jampuijala and Dukli RD Blocks within the Jurisdiction of Electrical Sub Division Jampuijala on Partial Turnkey basis
Supply Erection testing and commissioning of with construction of HT LT line and 4 x 63 KVA FOR 3ph to DTW W.R Scheme at different location under ESD Salema of ED Kamalpur TSECL
Construction of 7.60KM 11KV line by ACSR weasel, 26.42KM LT AB cable line (1Phase/3 Phase) along with construction of 11nos. 25KVA distribution S/T for providing 350 nos. single phase service connection to PVTGs household under Electrical DIVN, UDP
Pvdg 3ph service connection to newly constructed DTW pump and innovative scheme at different locations with installation of 4 nos 11/0.433 KV, 1X63 KVA Transformer and HT/LT line extension under ED-Dharmanagar.
Constrn of HT/LT line with 6x63KVA sub-station for providing 3-Phase service connection to DTW Scheme of WRD at Baishnabirchar,Hadra,Dhuptali, Kushamara, Samukhcherra,Bagabasa under Electrical DIVN UDP, G.District, Tripura State
Construction of 11 KV/LT line, Distribution sub-station for providing service connection to DTW scheme of DWS Department at different locations under Electrical Division Udaipur of TSECL, Gomati District, Tripura. (Total Scheme 10Nos
Extension of HT line including installation of 1 X 200 KVA Distribution Sub-Station for providing 3-phase service connection to Mini Tea Processing factory at Machmara Tea Estate under Machmara ADC Village of Pecharthal RD Block.
Supply, erection and commissioning of DTW Scheme (32 Nos) by extension of 11 KV / LT line , HT line through UG cable in/c construction of 1x63 KVA Substation for providing new service connection to DTW Scheme of DWS Department under Bisha
Extension of new HT/LT line by 200KVA and 100KVA sub-station with 11KV covered conductor 1Cx70mm2 to give three phase service connection to water innovative source and a water Boosting station at Tapsa Para
Extension of HT LT line including distribution Transformer in turnkey basis Partial for energization of DTW innovative scheme at different locations of Satchand Rupaichari and poangbari R D block under the jurisdiction of ED Sabroom
Construction of HT LT line including construction of 63 KVA Substation for providing three phase service connection at DTW scheme of DWS Jal Jiban Mission at different locations of Electrical Circle no I II Khowai
Constn of HT LT line and 1x315 KVA Sub Station for providing 3ph service connection to the Crematorium centre under Santirbazar Municipal Council, Santirbazar South Tripura within the jurisdiction of ESD Bagafa under ED Santirbazar
Extension of HT line inc 1X63KVA DT for providing 3Phase new service connection to Maijpara Aswinimarket under Charipara GP for Implementation of Jal Jeevan Mission Har Ghar Jal in Tripura within the jurisdiction of Amtali Electrical Sub-Division
Pvdg 3ph service connection to newly constructed DTW pump and innovative scheme at different locations with installation of 4 nos 11/0.433 KV, 1X63 KVA Transformer and HT/LT line extension under ED-Dharmanagar (part II).
Extension of HT/LT line including installation of 13x25 KVA distribution transformers for providing 405 nos 1-phase service connections to un-electrified PVTG Reang household under PM- JANMAN scheme within the jurisdiction of ESD-Mungiakami.
Extension of HT/LT line including 16x63 KVA Substation for 16 nos. DTW (DWS) Scheme i/c Innovative Scheme within the jurisdiction of Sabroom and Satchand Electrical Sub-Division under Sabroom Electrical Division, Manubazar, South Tripura.
Construction of HT LT Line and inc 5x25 KVA Sub Station for providing of 1 Phase Service connection to the PVTG beneficiaries under PM JANAMAN at different location within the jurisdiction of ESD Jolaibari during the FY 2023 2024 under Santirbazar
Extension of LT line by 02 nos. 8Mtr. Long PCC pole per household for providing single phase service connection to 175nos. un-electrified household under ESD MTB within the jurisdiction of Electrical Division Udaipur, TSECL,Tripura State
Ext. of LT line with 2nos. PCC Pole for 1ph S/C with PVC cable from nearby electric pole to premise up to 35mtr for electrified of Un electrified house hold fully trunky basis under ED Sonamura
Shifting of electrical poles, Transformer sub-stations, HT(11KV)/LT line etc./ shifting of utilities lines falling in the newly constructing RCC covered drain / proposed alignment for RCC covered drain with the approch road NH8 right side
Extension of HT line by 11 KV XLPE UG cable (3X185 sqmm) including construction of 315 KVA and 500 KVA Sub-Station for providing power connection to new Court building of District and Session Judge at Bishramganj and New Residential quarters
Extension of HT line by 3 core 6.35/11 KV 95 sqmm XLPE insulated Power Cable and installation of 1X200 KVA 11/0.433 KV Sub-station for facilitating service connections to Residential cum Commercial building Motorstand under ESD-I Banamalipur
Extension of LT line by 02nos. 8Mtr. Long PCC pole per household for providing single phase service connection to 198nos. un-electrified household in KBN RD Block under ESD KBN within the jurisdiction of Electrical Division Udaipur, TSECL
Shifting of existing 33 KV 11 KV LT line and Service Connection from Panitilla 318 to Sidongchara 343 KM in connection with construction and widening of NH 08 44 AA Road within the jurisdiction of Electrical Sub Division
Construction of HT LT line including construction of 63 KVA SubStation for providing three phase service connection at DTW scheme of DWS (Jal Jiban Mission) at Different locations of Electrical Circle Dhalai Unakoti and North under different Distric
Extension of HT LT line by Underground power cable including Installation of 1X63KVA distribution transformer for providing 3-phase service connection to newly Sunk DTW under AMRUT Scheme at Shyamapalli under AMC Word No- 47 scheme within the juri
Providing 78 Seventy Eight nos casual labour for revenue management Service connection Operation and maintenance of HT LT line Sub Station etc to be engaged under ESD Mohanpur ESD Bamutia ESD Hezamara ESD Lefunga within jurisdiction of ED Mohanpur
Extension of HT/LT line including construction of 19X25KVA sub-station for low voltage problem to SBDTW Scheme of DWS (PWD) Dept., Kalyanpur Division within the jurisdiction of ESD-II, Teliamura, ESD-Kalyanpur and ESD-Mungiakami under Electrical Divi