Loading…
Loading…
10,727 results • Best match
Providing and Installing CCTV at Various locations for Grampanchayat Kunjirwadi,Tal-Haveli,Dist-Pune
Cat-6 Cable Laying in Pipe & Fitting
TTPS ES Circle EM I Charges towards providing Temporary LT 3 Phase supply arrangement for various overhauling works connected with TM I and CMD I and other emergency lighting works in P H area and disconnection of power cables of various v
Labour Charges for providing Temporary LT 3 Phase supply arrangement for various overhauling works including laying cable from nearest source.
TTPS ES Circle EM I Charges towards providing Temporary LT 3 Phase supply arrangement for various overhauling works connected with TM I CMD I and other emergency lighting works in P H area and disconnection of power cables of various valv
Labour Charges for providing Temporary LT 3 Phase supply arrangement for various overhauling works including laying cable from nearest source.
Janpad Muradabad ke Kundarki (NH-509) se Jalalpur Dharampur Kalan Sihali mala hote huye Bilari Darni Junction tak marg ke ch 0.650 se 8.050 (Length 7.400 Km) tak pole shifting ka karya
Underground XLPE Cable laying drilling method
NW security at Vidhan Sabha
CAT6 UTP Cable laying with conduit
EMERGENCY DG POWER ARRANGEMENT TO WORK STATION SOUTH AND JETTY1 AND 2
Installation, testing and commissioning of 3.5Cx400sqmm, Aluminium, armoured, 1.1KV grade, XLPE insulation, inner&outer sheath PVC, cable -Cables to be supplied and laid buried in ground, HDPE/RCC Pipes or readymade RCC trenches/ laid on cable trays/cable supports/walls/below floor,etc. Cables shall be supported before end terminations. MS item for supporting would not be measured separately. Removal of empty drums, cartons and making the site normal as instructed by Purchaser/ client is included in scope. The erection scope shall also include drilling holes, minor civil work, testing, commissioning etc. An approximate length of 60Mtrs of cable trench in existing area are covered with concrete slabs . These slabs are to be removed for cabling work in trenches in the existing area and the same shall be installed back after cable laying.Cables are measurable and only completed portion between end terminations of work would be measured. Cable schedule shall be prepared. Cable joints shall be avoided .Employer's/consultant decision would be final in this regard. Miscellaneous items required for laying of such cables like heavy duty nylon ties, cable tags, cable route marker etc. as required shall also be supplied and installed by the bidder as a part of cable laying.