Loading…
Loading…
17,035 results • Best match
WORK schedule of maintenance and attending breakdown 33 11 4 KV line of 33 11 KV Substation Auras and Miyaganj EDSD III Miyaganj under the area of Electricity Distribution Division V Hasanganj Unnao
Digging of cable trench approx. 1200x1200 mm by JCB/kachha road/pakka road for suitable size for damaged cable joints/ new cable laying
Electrical/G work for : Jhansi : Replacement and modification of pre cooling points for AC coaches in Jhansi premises.
clamps for cable laying with all necessary
Improvement to passenger amenities at JKNI Halt station, Major improvement work like extension of PF no.2, water supply pipeline and sanitation & Provision of RCC OHT (50000 Gallon) with 01 no. deep tube well (900') etc. at SDDN in LJN Division, Major improvement work like raising of PF no.2, Existing PP shelter, Provision of RCC OHT (50000 Gallon) with 01 no. deep tube well (900'), Imp. of toilet water supply, pipeline and sanitation at BLP in LJN Division, Proposed dismantling & extension of existing foot over bridge from platform No. 02 to platform No. 01 at Lucknow City station of Lucknow Division, Development of Goods platform surface ,fencing etc. at PD & approach road widening etc. at BKT , S&T Work in connection with Provision of New PP Shelter at PF no. 2, 3, 4 & 5 due to existing infringement of SOD in old PP Shelter and providing galvanized sheet PF No. 1 & 6 of LJN Station in section of SSE/W/LJN. Provision of Telecom facilities for 2nd entry gate (South side) at SDDN in LJN Division. Improvement of platform surface on PF no. 1 to 6 with improvement of Concourse Area, Passenger Hall, waiting hall and water supply pipeline, Toilets and circulating area at LJN station.
... approved by Railway. The cable Laying includes Laying of cable in trenches, through pipes ...
REPLACEMENT OF DAMAGED/RUSTED LT/HT POLE, INSTALLATION OF 250 KVA ADDITIONAL, CAPACITY INCREASING OF DISTRIBUTION T/f 63-100 KVA, 100-250 KVA AND CONSTRUCTION AND STRENGHTNING OF 11 KV U/g LINE AT DIFFERENT SUBSTATIONS UNDER EUDD-BAMRAULI
Laying of L.T. cable of size 1x240 sq mm.from T/F LT Bushing to LT Cubical/LT Pole and suitably connection with 240 sq mm long baarrel All Lugs at both ends.Lugs provided by contractor.
Rehabilitation and Restoration of Tarafeni Barrage and its appurtenant structures Civil, Electro Mechanical and Instrumentation part under Kangsabati Project in Right Bank Canal System at Mouza and Village Baistampur, Block Binpur II, P.S. Belpahar
INSTALLATION Underground Digging through Soft Soil Cable Laying Charges
SPECIAL REPAIR/ REPLACEMENT OF LT OVERHEAD LINE TO LT UNDERGROUND CABLE IN MES COLONY UNDER GE SAUGOR
... cable , 80 mm thick before laying the cable and after laying the cable complete all as specified ...
SPECIAL REPAIR/ REPLACEMENT OF LT OVERHEAD LINE TO LT UNDERGROUND CABLE AND ALLIED WORKS IN VK LINE UNDER GE SAUGOR
... cable , 80 mm thick before laying the cable and after laying the cable complete all as specified ...
Katni KTE-Construction of New Parcel Office at Katni station in lieu of existing parcel office to be dismantled under ADEN (M)/KTE Subdivision
Cable laying DOUBLE in earth: This involves Excavation of 1000mm deep trench in soil/hard
SITC of CCTV Camera System for Security purpose at malviya Nagar Ward No. 129 Partap Nagar Colony Tonk Road , Jaipur
... item no. 11.1 to 11.4 for Laying Charges for cable through Manual Boggi by... repairing the pit after laying of cable with PCC/ Bitumin as required.
SITC of CCTV Camera System for Security purpose at Malivya Nagar Ward No. 145, Jankpuri II (Part-2) Malviya Nagar, Jaipur
... item no. 11.1 to 11.4 for Laying Charges for cable through Manual Boggi by... repairing the pit after laying of cable with PCC/ Bitumin as required.
SITC of CCTV Camera System for Security purpose at malviya Nagar Ward No. 131 Hansh Marg (Part-2) Malviya Nagar Jaipur
... item no. 11.1 to 11.4 for Laying Charges for cable through Manual Boggi by... repairing the pit after laying of cable with PCC/ Bitumin as required.
Replacement of dmaged AB cable DTR at Dwarahat town under EDSD,Dwarahat
Laying of AB cable of size 120 sq.mm
Provision of Trap/derailing switch to enable stabling on long haul loop line at Thuria, Laban, Chhoti Udai & Piloda stations.
... over pieces of signalling cable. Laying of cable pieces shall be covered in laying of cable item and cable shall be ...
Setting Up Mechanized Laundry Units in Govt Hospital premises SITC of 11 KV 500KVA x 2 Capacity Sub Station in Old Matri Sadan Hospital Campus Under Murshidabad Medical College and Hospital
Laying of cable in underground trench as per GS for the following numbers of Cables.
Tender for supply of equipment material design erection testing commissioning for SOP to Branch Manager HP Agro industries corp Ltd BO Jachh Jassure by prov 3 Ph LT line at Jachh from exisitng 1104KV 250 KVA SStn Agro in E section Jssure under ESD N
Sagging of conductor/cable i.e. laying, stringing and sagging & binding with insulator (Single wire per KM).
Work
... jumpering work, control cable termination, laying of various type control ...
Laying of underground 11 KV Patel Nagar Feeder Balmiki Mandir to Teg Bhadur Gurudwara Gandhi Gram.
ERECTION & LAYING 11KV CABLE 3X120 SQMM
Erection of 3.3KV Overhead line from Quarry 1 (Crusher) to Quarry 2 (Near view point) at New Kenda Colliery under Kenda Area
Earth cutting and laying of cable for connection transformer and Overhead line with bricks, sand 2X3.
Supply, Installation and Commissioning including AMC of peripheral CCTVsecurity surveillance system at NTPC Auraiya
Laying of Cable UTP/OFC
Maintaining of sewage pumping by SITC of automatic water level sensing system at Rohini Jail SPS in AC-13.
... pump/set. (ii) Supplying & laying of cable from indoor unit to level ...
Maintenance of sewage pumping by SITC of Automatic Water Level Sensing system at Khanjhawala Road SPS
... pump/set. (ii) Supplying & laying of cable from indoor unit to level ...
Maintaining of sewage pumping by SITC of automatic water level sensing system at Raja Vihar SPS in AC-13.
... pump/set. (ii) Supplying & laying of cable from indoor unit to level ...
Maintaining of sewage pumping by SITC of automatic water level sensing system at Khadda Basti SPS in AC-13.
... pump/set. (ii) Supplying & laying of cable from indoor unit to level ...
Part supply of material & execution of Signalling indoor and outdoor work in connection with the work of conversion of UP loop Line no. 4 into common loop by providing new crossover between UP & DN line at JL end at Niyol Station of Mumbai Division, Western Railway.
... with DIN 53438 Part-II for laying signalling/telecom cables, channel attachable to each... cover, as per RDSO STS/E/cable laying Practise Vol-IV and as per ...
providing and laying of power line at IGP Talabgaon, Bundi
... mm along the trench, (b) Lay the cable in the middle of the trench,... height 125 mm on top of the cable. (d) Lay the protective Common burnt ...
Shifting of (A) 03 nos of haulage with motor, bed plate and rope (B) switches, starter and cables and (C) Trans switch unit from BB18(A) Panel to BB19 (A) panel to maintain production of mines of Siduli Colliery.
Unloading and laying of cable 70 sqmm and 40 sqmm 300mtr
Construction of boundary wall and road restoration etc. work for the Safety of New Canal Colony, Okhla.
... connected by clamps (Four underground laying cable shall be placed at a depth ...
Construction of Tower wagon shed,siding,retaining wall,SNT and earthwork at sakleshpur Rly yard and allied works including supply of spares and TNP for OHE depots at Hassan and Mysore for SWR
... Mtr. for road crossing of cables, laying of DWC/HDPE/RCC pipes with... to the original position. Laying of cables is not included in this ...
Vadodara Division: Electrical work in connection with extension of PF No. 1 at Anand and raising of platforms to accommodate 12 coach MEMU trains at stations in Anand - Khambhat section
... original position after laying of 18 cable in HDPE pipe, 50 mm diameter... refilling/ plastering after laying of cable in 50 mm diameter HDPE pipe ...
Hyderabad Division: 1) Provision of Doubling line between Malkajgiri-Moula Ali stations for a length of 2.5 kms- Electrical Arrangements 2) Proposed construction of sewage treatment plant at Diesel Loco shed/ MLY- Electrical arrangements
... widex90cm deep road etc., for laying of LTUG cable. After laying of cable the trench should be brought ...
Withdrawing and lowering of Submersible pump motor set at river Ajoy at Bhaburia Head Works and some other allied works under Gourbazar-Ichapur and Jamgara-Jagannathpur Water Supply Scheme.
... Ajoy for withdrawing and laying of cable line up to the depth of ...
Supply, delivery, installation of (i) M.S. Self supported chimney of 30 Mtr. height (ii) Cast Iron made wood base system and (iii) 440V, 3Ph AC Control Panel allied electrical works for wooden pyre system at Shibpur Burning Ghat under HMC for impro
(i) Laying of cable on wall/surface including ...
81486 PROVISION OF HT AUTOMATIC VOLTAGE REGULATOR (AVR) ALONG WITH ASSOCIATED WORKS AT INS KATTABOMMAN UNDER GE TIRUNELVELI
Supply, laying & testing cable XLPE insulated, screened, ...
Restoration of street lights at Mayo Road 2 and Outram Road due to construction of Park Street Underground Metro Station.
Laying only Cable upto 50 sqmm through existing RCC/Hume/ GI Pipe/open masonary trench for single, 2, 3, 3½ & 4 core.
As mentioned and described in BOQ
... layers of 80mm thick before laying of cable and second layer of 150mm thick after laying of cable in trenches/ducts including ...
PROVN OF CONSTRUCTION OF FOUR GUARD ROOMS ALONG WITH TOILETS CUM BATHROOMS REPAIR BAY TWO INSPECTION PITS TOOLS AND MT STORES PAINT STORE AND FOL STORE COVERED UNDER VARIOUS LBW WORKS UNDER GE ( NORTH) BATHINDA AT BATHINDA MIL STN
... clean fine river sand for underground cable 8 cm before laying cable and 15 cm after laying and... and punned to 18 cm after laying of cable complete all as specified. ...
CERTAIN REPAIRS TO COPE BOX, FPBS, SERVICE DUCTS CRANES AND OTHER RELATED WORKS AT IN JETTY UNDER AGE E/M AT GE HADDO, SRI VIJAYA PURAM
Supply and Laying in cable trenches, walls, structure ...
Electrical works in connection with "Provision of AI based Facial Recognition system (FRS) integrated with Video Surveillance System at Sealdah station."
"Cable laying upon cable tray with necessary binding/clamps etc.
GE/BAS-93/2025-26 Repair/replacement to diesel engine set of different capacity alongwith connected items at Madhopur Stn under GE Basoli
... under cable upto 15cm before laying the cable and 8cm over the cable after laying, punned down to overall ...
S&T Portion of work for (1) Station development work at Soro under Amrit Bharat Station Scheme of Kharagpur Division (2) Railnet connectivity for construction of new 70 beds R/Room instead of 100 bedded Running Room at NMP.
... filling and ramming after cable laying as specified in Tech. Circular... issued by CSTE/SER for S&T Cables (Cable laying charges is included). This ...
S&T Portion of work for (1) Station development work at Soro under Amrit Bharat Station Scheme of Kharagpur Division (2) Railnet connectivity for construction of new 70 beds R/Room instead of 100 bedded Running Room at NMP.
... filling and ramming after cable laying as specified in Tech. Circular... issued by CSTE/SER for S&T Cables (Cable laying charges is included). This ...
PROVN OF CERTAIN MINOR AND REVENUE WORKS AT KHUNMOH AND KHREUH UNDER AGE E/M OF GE 861 UNDER GE 861 EWS
... clean fine river sand for underground cable 8 cm before laying cable and 15 cm after laying and... and punned to 18 cm after laying of cable complete all as specified. ...
SUPPLY AND INSTALLATION OF ELECTRICAL ITEMS IN PLACE OF DAMAGED ITEMS FOR OPERATING BIG DIA TUBEWELL AT HAZI RATAN AND OTHER 5 BIG DIA TUBEWELL
Laying through Underground TrechaLaying of two cables upto 35 sqmm in an underground ...
Development/upgradation/modification work for existing electrical general assets at sections- BRPK to PTPL and BT-HNB.
"Trenching and laying of cable underground by soil cutting through ...
REPAIR/ MAINT OF TO PERIMETER SECURITY LIGHTS AND ALLIED SERVICES AT KHUNDRU, KHANABAL, KHUNMOH AND KHREUH and SHER-E-SHALI GRN UNDER GE 861 EWS
... clean fine river sand for underground cable 8 cm before laying cable and 15 cm after laying and... and punned to 18 cm after laying of cable complete all as specified ...
REPAIR AND MAINTENANCE OF LT CONDUCTORS WITH CONNECTED WKS PERTAINING TO PRE AND POST MONSOON AT AREA-I AND II UNDER GE SAUGOR
... cable , 80 mm thick before laying the cable and after laying the cable complete all as specified ...
REPAIR/MAINT OF EARTHING, LIGHTNING PROTN SYSTEM, PAINTING OF ELECTRICAL POLES, TRIMMING OF TREES/ BUSHES, STONE AGGREGATE IN SUB STNS AND CONNECTED SERVIVICES IN ALL POWER HOUSE ST AT BASISTHA AND OTHER THAN BASISTHA AREA UNDER GE GUWAHATI
... fine river sand 9 cm before laying cable and 9 cm deep cover after laying the cable complete all as specified ...
Construction of Mechanized Laundry in the premises of K.S. Roy T. B. Hospital----- External Electrical Installation work.
Laying of cable as below, after cutting ...
Supplying Electrical Materials And Repair Maintenance Services At. Grampanchayat Kuruli, Tal. Khed, Dist. Pune
Supplying & Laying PVC armoured cable 4core 6sq mm
The work for shifting of Electrical utility due to raod widening At Dalmandi Marg, Machchodari
... mm from ground level for Laying of LT cable by Providing of Brick on ...