Loading…
Loading…
10,591 results • Latest
Collection of coconuts from the Coconut Orchards of Horticultural Research Station under Faculty of Horticulttrue and Teaching Farm under Directorate of Farms, Bidhan Chandra Krishi Viswavidyalaya for 2 years
INSTALLATION OF SOLAR STREET LIGHT NEAR H/O DIBAKAR GHOSH
Shifting of pipe line due to widening of Chakdah Bongoan road from Chakdah Chowmatha to Chakdah Bus stand and other allied pertinent works at Palagacha Zone- I under Chakdah Surface based PWSS under Nadia Arsenic Division-I,P.H.E. Dte.
CONSTRUCTION OF CC ROAD FROM THE H/O NAUSAD MASTER TO KALI MANDIR
INSTALLATION OF 9(NINE) LIGHTS FROM THE MASQUE TO THE H/O SARIYAT SEKH
Tender for award of license to run shop outlets/ commercial establishment
Assessment of present cross sectional profile with topographical survey of Howrah Drainage Channel, Branches No I II III VI Swarnamoyee Khal and Balitikuri Khal for preparation of a comprehensive plan for re-excavation work under EE I LDI
Repairing of CC road from Mirjapur Purbapara Primary School to Sarkari Ghat under Panighata G.P
Assessment of present cross sectional profile with topographical survey of River Bali under SE Eastern Circle Sandeshkhali II block district of North 24 Pgs to be conducted by River Research Institute under Irrigation Waterways Department Govt
Repairing of CC road from H/O Manjarul Haque Munshi to H/O Mohijuddin Munshi under Panighata G.P
Security Manpower Service (Version 2.0) - Office/Commercial/Institutions/Residential; Unarmed Security Guard
PRE PACKAGE OF FASTENERS FOR 2720 MM DIA. SI. BCB-92 ID FAN, COMPLETE IN ALL RESPECT AS PER DRAWING E
Supply of Glass Bottles or Jars for Ghee under Banglar Dairy Limited
FLAME PROOF DUPLEX TYPE RTD, 3 WIRE, PT-100, EX-D, PESO CERTIFIED; FOR 975 MM DIA. SI. PSC-05 PURGE A
Convertion of High Mast Light From Electric to Solar at Dhoradaha Rajanikanta High School Under Dhoradaha-I GP Withiun Karimpur-II Dev Block
INSTALLATION OF 25 NOS. ELECTRIC STREET LIGHT UNDER PS 14 UNDER DHORADAHA-I GP UNDER KARIMPUR-II DEV BLOCK UNDER APAS FUND FOR THE YEAR 2025-26 SCHEME ID APAS-01-077-14-0007
REPAIRING WORK OF ROOM AT DOHORADAHA MOLLAPARA KABARASTHAN UNDER DHORADAHA-I GP UNDER KARIMPUR-II DEV BLOCK UNDER APAS FUND FOR THE YEAR 2025-26 SCHEME ID APAS-01-077-13-0001
CONSTRUCTION OF PCC ROAD FROM HOUSE OF SAHIDUL SEKH TO HOUSE OF MAHARAM SEKH VIA CHATU BISWAS AT DOHORADAHA MOLLAPARA UNDER DHORADAHA-I GP UNDER KARIMPUR-II DEV BLOCK UNDER APAS FUND FOR THE YEAR 2025-26 SCHEME ID APAS-01-077-13-0004
Construction of 6.3 MVA PTR plinth foundation along with CT 7 VCB foundation cable trench pahway and other aliied civil works at Mayapur 3311 KV SubStation under Krishnanagar Division in the district of Nadia
Construction of modified community leach pit (5HH, 29nos) Phase-IV at Khidirpur Under Bethuadahari-IIGP
Construction of CC road from Main Road Towards the House of Isab Sk (70 Mt) Under Karimpur-I Gp,PS-95
Construction of sitting arrangement (2 nos) near Pakurtala Masjid and Dumurtala Masjid under Panighata G.P
Piling of road from H/O Nur Hossain Sk to H/O Anarul Mondal under Panighata G.P
Construction of Boundary wall at Narayanpur Muslim Para Idgaha Booth No 117
Electrification work and Installation of Tube Well (100mm x 50 mm dia with submersible) for New Su Sasthya Kendra (Health and Wellness Centre) at Mukundapur at Majdia Panshila G.P under Nabadwip Panchayat Samity, Nadia.
Construction of Cement Concrete Road from H/O Tarun Haldar to H/O Aparup Mondal at Khidirpur Booth No 116
Repairing and Renovation Work of AWC at Baliadanga Madhyapara (AWC Code.19336260908) in the GP of Anishmali under Ranaghat-II Dev.Block.
Repearing of Roof Treatment (Jal Chhad ) at Khidirpur Primary School Booth No 116
Electrification work and Installation of Tube Well 100mm x 50 mm dia with submersible for New Su Sasthya Kendra Health and Wellness Centre at Teorkhali Mouza JL No. 15, Plot No. 143 1066 under Swarupganj GP under Nabadwip Panchayat Samity.
Preparatory measures for various roads in SectionIII ahead of the upcoming monsoon including brick stitching jhama metal consolidation and allied works under Quality Control Sub Division No I of Nadia Highway Division No II for the year 2026 2027
Construction of Concrete Chatal at Narayanpur Purbapara Barowari Durga Mandir Booth No 117
Preparatory measures for various roads in Section II ahead of the upcoming monsoon including brick stitching jhama metal consolidation and allied works under Quality Control Sub Division No I of Nadia Highway Division No II for the year 2026-2027
Preparatory measures for various roads in SectionI ahead of the upcoming monsoon including brick stitching jhama metal consolidation and allied works under Quality Control Sub Division NO I of Nadia Highway Division No II for the year 2026 2027
Installation of Street Light at Narayanpur Purbapara Booth No 117
Manpower Outsourcing Services - Fixed Remuneration - Teaching; Lecturer; Post Graduate
CONSTRUCTION OF SHADE STRUCTURE AT LALPUR HEALTH SUB-CENTRE AT TATLA-2 G.P. SCHEME ID- APAS/01 /091/199/ 0001
Construction of Sitting Monch at Narayanpur Pashchimpara Radha Gobinda Mandir Booth No 117
Repearing with Roof Slab (Community Hall ) at Narayanpur Muslimpara Booth No 117
Installation of Solar High Mast Light near Satyacharan Girls School (On Main road ) at Booth No 124
Construction of CC Road at Gangni Debnath Para from h/o Sanjay Roy towards house of Kabita Biswas (Booth No-77) under Barasat GP of Ranaghat-I Panchayat Samity
Construction with Shed (Monch) near Electric Office Para Shib Mandir at Booth No 124
Construction of CC Road at Byaspur Kuthirpara from h/o Moni Bag towards house of Bhanu Bag (Booth No-132) of Khisma GP of Ranaghat-I Panchayat Samity
Construction of Cement Concrete Road from Barojibi para Mandir to H/O Prabir Mondal at Booth No 124
Construction of B.T. Road at Nazirpur from h/o Pintu Biswas to h/o Sachin Biswas under Barasat GP of Ranaghat-I Panchayat Samity
Construction of Cement Concrete Road from H/O Meghnath Haldar to Rakkha Kalitala Mandir at Khidirpur Booth No 116
Construction of B.T. Road at Gangni Bakultala from h/o Ratan Biswas to h/o Sadhan Pal under Barasat GP of Ranaghat-I Panchayat Samity
Construction of CC Road at Kalinarayanpur Math Para from h/o Narayan Biswas towards house of Manik Das (Booth No-188) of Kalinarayanpur Paharpur GP under Ranaghat-I Panchayat Samity
Installation of Solar High Mast Light near Beltalapara Barowari Mandir at Khidirpur Booth No 116
Electrification work and Installation of Tube Well (100mm x 50 mm dia with submersible) for New Su-Sasthya Kendra (Health and Wellness Centre) at Simulgachi Mouza, J.L.No. 23 Plot No. 787 under Majdia Panshila G.P under Nabadwip Panchayat Samity
Installation of Stand Lone Solar PV High Mast Light (4 Light) 10.5 M height at Gangni Bathing Ghat under Barasat GP of Ranaghat-I Panchayat Samity