Loading…
Loading…
4,369 results • Latest
Improvement such as widening strengthening to Fatabahal Fasad road from 0/643 km to 0/673 km, 8/546km to 8/646 km.
Construction of Boundary wall as well as Master Plan of construction Paddy Purchase Centre in Sarasmal PCC under Deogaon Block
GLOBAL TENDER FOR PROCUREMENT OF CP COKE
Procurement of Computer Systems etc for establishment of Brahmagiri Project Office
Overhauling kit for Distributor Valve (II73835)
Overhauling kit for Driver's backup valve (PTDC) (787609)
SUPPLY AND INSTALLATION OF DOUBLE ACTING AC COMPARTMENT SWING DOOR ASSEMBLY FOR AC COACHES AS PER ICF DRG NO. -ICF/SK3-5-6-014 COL-I & COL-II Alt-h OR LATEST AND RETROFITMENT IN EXISTING COACHES AS PER ICF/ SK3-5-6- 019
Supply, Installation , testing and commissioning of 518 no double arm led street at Dhenkanal bypass and angul bypass in different location of Cuttack Angul NH 55 from Km 0.400 to Km 112 in the state of Odisha
IMPROVEMENT WORKS TO DRAINAGE CHANNEL
IMPROVEMENT WORKS TO DRAINAGE CHANNEL
IMPROVEMENT WORKS TO DRAINAGE CHANNEL
PROCUREMENT OF MECHANICAL SEALS AND ITS SPARES FOR FOR ST-I CEP AT NTPC Talcher Kaniha
IMPROVEMENT WORKS TO DRAINAGE CHANNEL
IMPROVEMENT WORKS TO DRAINAGE CHANNEL
IMPROVEMENT WORKS TO DRAINAGE CHANNEL
IMPROVEMENT WORKS TO DRAINAGE CHANNEL
IMPROVEMENT WORKS TO DRAINAGE CHANNEL
588-12623 STMC-For 1 nos of roads for a length of 15.980 km under Koraput R and B Division(Package 10)
IMPROVEMENT WORKS TO DRAINAGE CHANNEL
IMPROVEMENT WORKS TO DRAINAGE CHANNEL
Replacement of damaged false ceiling tiles with new ones in Hospital building and Burn Center for upcoming Kayakalp visit at AIIMS, Bhubaneswar
IMPROVEMENT WORKS TO DRAINAGE CHANNEL
IMPROVEMENT WORKS TO DRAINAGE CHANNEL
Construction of AddI. Mission Sakti Bhaban Building at Matiasahi under DMF in the District of Anugola for the year 2026-27
Construction of AddI. Mission Sakti Bhaban Building at Sanahula under DMF in the District of Anugola for the year 2026-27
Construction of AddI. Mission Sakti Bhaban Building at Badadandasahi under DMF in theDistrict of Anugola for the year 2026-27
SHIFTING AND MODIFICATION OF 11KV NETWORK FOR ROAD WIDENING BY RandB DEPARTMENT NEAR DURGA MANDAP CHAWK TO INDIRA CHAWK, JEYPORE UNDER ESO NO III ELECTRICAL SECTION year 2025-26
SHIFTING AND MODIFICATION OF 11KV NETWORK FOR ROAD WIDENING BY R and B DEPARTMENT FROM INDIRA CHAWK TO PURNAGADA CHAWK, JEYPORE UNDER ESO NO III ELECTRICAL SECTION.
SHIFTING AND MODIFICATION OF LT NETWORK FOR ROAD WIDENING BY R and B DEPARTMENT FROM MAIN ROAD CHAWK TO INDIRA CHAWK, JEYPORE UNDER ESO NO III ELECTRICAL SECTION.
Design, manufacturing, supply, and installation of a Pre-Engineered Building, PEB CoreBox Shed, including Civil foundation, flooring, E.I. etc. all complete on a turnkey basis at Ampavalli Limestone Mines, in the District of Koraput
SHIFTING AND MODIFICATION OF LT NETWORK FOR ROAD WIDENING BY R and B DEPARTMENT FROM INDIRA CHAWK TO PURNAGADA CHAWK, JEYPORE UNDER ESO NO III ELECTRICAL SECTION
STMC-For 1 no of road for a length of 33.3 km under Rayagada (R and B) Division -II (Package No-3)
Periodically Cleaning of 10 Nos underground water sumps and Painting of Boundary wall of Quarter Guard at GC CRPF Sambalpur
STMC-For 1 no of road for a length of 23.646 km km under Rayagada (R and B) Division -II (Package No-2)
STMC-For 2 nos of road for a length of 22.841 km under Rayagada (R and B) Division -II (Package No-4)
Engagement of Consultants for Proof Engineering Services (PES) in Irrigation Projects (Barrages and ISSs) under Water Resources Department, Government of Odisha.
KRYNIC0118 Supply of Walkie Talkie for Talcher TPS
Construction of Sub Center Building at Badakerjang under Banarpal Block for the year 2026-27
Construction of Sub Center Building at Dharampur under Talcher Block for the year 2026-27
Construction of Sub Center Building at Saradhapur B under Anugola Block for the year 2026-27