Loading…
Loading…
17,143 results • Latest
PROCUREMENT OF ALL IN ONE PC
Construction of Pre Cast Boundary Wall in Village Dadwindi for the project of construction of Dadwindi realignment Greenfield from existing Km 36 250 to existingKm 38 650 onJalandhar kapurthala Sultanpur Lodhi Makhu road sectionofNH703AinthestateofPB
LINK PIN FOR LHB COACHES TO RCF DRAWING NO. LW05125, ALT. b.
COTTON STOCKINETTE BLEACHED CLOTH, 30 Cotton yarn as per IS No.3326:1978 first edition, width(Tubular).Design-Plane, Color-White, width-56 Inch/58 inch for Industrial Cleaning . Note: sample must be gor approved before supply of full supply. specn: 30 Cotton yarn as per IS No.3326:1978 first edition, width(Tubular).Design-Plane, Color-White, width
GWALIOR JN.: Necessary alteration in line no.6 (PF-4 line) for making through 3rd line with additional loop line (PF-5 lne) at Gwalior yard.
Supply of TLSA for 400 kV Transmission lines under Odisha Projects. (Specification No.: NCN0382)
Supply of 765 kV Circuit Breakers (With PIR) at Moga substation of NR-II of POWERGRID (Specification. No.: NCN0375).
HUMAN ELECTRICAL CREMATORIUM in chinaur, Shahjahanpur City Under State Smart City Mission.
Fishing Rights for Jamini Jalashya Category-2 Lalitpur Uttar Pradesh
Necessary construction work for setting up the Center of Excellence at Mahakarunik Tathagat Gautam Buddha Government Polytechnic Siddharth Nagar, selected in the second phase, with the support of Tata Technologies at Siddharth Nagar UP
Fishing Rights for Maudaha Jalashya Category-1 Hamirpur Uttar Pradesh
Construction work of parking shed in Nagar Panchayat office.
"SEALED WINDOW GLASS UNIT (FROSTED) FOR LAVATORY OF LHB COACHES TO RCF DRG. NO. LW54175 ALT. NIL."
Chloramphenicol/ Beclomethasone Dipropionate/ Clotrimazole/ Lignocaine Hcl i.e. Lidocaine) - 5%/0.025%/1%/2% (5ml), Ear Drop
Necessary construction work for setting up the Center of Excellence at the selected Government Polytechnic in Chhabi Laha Khor Basti in the second phase, in collaboration with Tata Technologies Limited at Basti UP
NAGAR PANCHAYAT SAHAWAR ME WARD 08 ME DIPTI SAHAB VALI GALI ME BHARAT VERMA KE GHAR SE ATUL JWALLARS KI DUKAN TAK 80 MM INTERLOCKING SADAK AND NALI NIRMAN KARYA
Nagar Panchayat Sirsi ke Ward 7 Mohalla Sarai sadak me lamha to pili tak rcc nala nirman karya.
As Per Tender Notice
As Per Tender Notice
Nagar panchayat Sirsi ke Ward 7 Mohalla Sarai sadak moradabad-Sambhal marg jama masjid to madarsa marg ke pass tak rcc nala nirman karya.
KARYALYA NAGAR PANCHAYAT DOSTPUR KE MITTING HALL ME A.C.P. A.C WINDOW, DOOR WIRING ELECTRICAL WORK
NAGAR PANCHAYAT SAHAWAR ME WARD 08 DIPTI SAHAB BALI GALI BHAGWAN SINGH KE MAKAN SE RAJKUMAR SE HOTE HUE MOTE AJEEJ KE MAKAN TAK 80 MM INTERLOCKING SADAK AND NALI NIRMAN KARYA
NAGAR PANCHAYAT SAHAWAR ME WARD NO 15 ME MOHALLA QURAISHI ME COMMUNITY HALL KA NIRMAN KARYA
Nagar Panchayat sirsi ke Ward 7 Mohalla Sarai sadak me alam Maulana ke Plot se shamshadghat tak rcc nala nirman karya.
Ward 3 Mohalla Chaudhriyan me Dakhshini school to Anand ke Plot tak RCC Nala Nirman Karya.
Nagar Panchayat Sirsi ke Ward 4 Mohalla chaudhriyan me milak marg to munni talab tak rcc nala nirman karya.
NAGAR PANCHAYAT SAHAWAR ME WARD 08 ME DIPTI SAHAB VALI GALI ME LAL MOHAMMAD KE GHAR SE BRAJESH MISHRA KE GHAR TAK AND ANIL KE GHAR SE MANOJ KE GHAR TAK 80 MM INTERLOCKING SADAK AND NALI NIRMAN KARYA
8 Boring by percussion method and installation of pumping plant at kareilly road. (LINE 1)
Supply of 75HP Three phase summer submersible pump controller
Construction of brick masonry chamber for sluice valve fitted in various pipe line of Nagar palika.