Loading…
Loading…
418 results • Best match
PIPE OD 57MM AND 2.9MM THICK IN LENGTH OF 5 MTRS., as per Drawing: IS:6913-1973 TABLE-1 GRADE B, Packing Instruction: AS PER STANDARD PACKING. IT SHOULD BE ENSURED THAT ITEM SHOULD NOT RUB DURING TRAN
HEX HEAD SCREW M6X35 STAINLESS STEEL, as per Drawing: IS:1364(PART-2)-1992 A2-70 TO IS:1367(PART-14)-1984, Packing Instruction: AS PER STANDARD PACKING. IT SHOULD BE ENSURED THAT ITEM SHOULD NOT RUB D
Consultancy service for Preliminary conceptual structural Design and drawings of one nos Bridges over Haraminala from BP 1170 to BP 1169 Approx 1.50 km long along Indo Pak border in Gujarat Subwork/Packages: Three
Balance construction works including launching of 6 nos. pre-cast RCC boxes, P-Way works and other associated works in connection with One No. RUB on Single Line Railway track at Ch. KM 402/935M in Karodiya Village, Vadodara.
Providing water level monitoring system by using smart Lidar water level sensors at various Road under bridges to facilitate pumping arrangements during monsoon under the jurisdiction of Assistant Divisional Engineer - Dhrangadhra (Re-invited)
BRC Division:- Hiring of diesel pump to drain out rain water/sludge/mud from surrounding area of various locations of Limited Height Subway/Level Crossing/ Road under Bridge/Railway Colony/ Railway Station/ Railway Yard/Shed etc under the jurisdiction of Sr. DEN(N)BRC (Re-invited) (R-1).
BRC Division:- Hiring of diesel pump to drain out rain water/sludge/mud from surrounding area of various locations of Limited Height Subway/Level Crossing/ Road under Bridge/Railway Colony/ Railway Station/ Railway Yard/Shed etc under the jurisdiction of Sr. DEN(N)BRC (Re-invited) (R-2).
TWO STAGE VACUUM PUMP 1/2 HP, 230 V, 4.5 CFM SINGLE PHASE SUITABLE FOR AC UNIT WITH PARTIAL PRESSURE 0.2 PA AND TOTAL PRESSURE 15 MICRON, MODEL VE245 N OF VALUE MAKE OR INFINITY or ROTHENBERGER or ROB
Rajkot division-S&T Work in connection with (i) Providing ROB in lieu of LC No 135 at Km 755/0-1 Between KHDI - PDH section(2 lanes) (ii) Providing ROB in lieu of LC No 147 at Km 770/1-2 Between PDH - CX section(2 lanes) (iii) Proposed LHS in lieu of LC No. 92 at Km 698/1-2 bet LXR-WKR (iv) Kanalus: Rectification of bad layout from Pt 112 towards PBR side by shifting the turnout by 18m towards RJT.
Rajkot division-S&T Work in connection with (i) Providing ROB in lieu of LC No 135 at Km 755/0-1 Between KHDI - PDH section(2 lanes) (ii) Providing ROB in lieu of LC No 147 at Km 770/1-2 Between PDH - CX section(2 lanes) (iii) Proposed LHS in lieu of LC No. 92 at Km 698/1-2 bet LXR-WKR (iv) Kanalus: Rectification of bad layout from Pt 112 towards PBR side by shifting the turnout by 18m towards RJT.
Elimination of level crossings No. 144 at 167/7-8, 146 at 169/6-7 & 150 at 176/0-1 by providing road under bridges between Palanpur-Samakhiali Section under jurisdiction of Sr.DEN (NW)-ADI.
Engaging Consultancy Service for the works of Construction of proposed ROB and its approches in replacement of existing Level Crossing No 33X at Km. 88.565 and Level Crossing No.88 at Km. 113.00 of NH-64 District-Anand in the State of Gujartat
Elimination of level crossings No. 127 at Km 145/1-2, 138 at Km 158/8-9 & 139 at 160/3-4 by providing road under bridges between Palanpur- Samakhiali Section under jurisdiction of Sr.DEN (NW)-ADI.
DEN/East Jurisdiction Group Work (1) TRR (P) 4.918 Tkm on Major and Important bridges against the sanctioned work of Bhavnagar Division - TRR (P) 20.808 Tkm on Major and Important Bridges (2) Conversion of SWR to LWR on 2 to 4 Degree Curve in Dhola-Bhavnagar and Sabarmati-Botad section in the work of Bhavnagar Division - Conversion of SWR to LWR on 2 to 4 Degree Curve (3) Botad-Dhola section: Through sleeper renewal from Botad to LC No. 163 (2 Km).
DEN/East Jurisdiction Group Work (1) TRR (P) 4.918 Tkm on Major and Important bridges against the sanctioned work of Bhavnagar Division - TRR (P) 20.808 Tkm on Major and Important Bridges (2) Conversion of SWR to LWR on 2 to 4 Degree Curve in Dhola-Bhavnagar and Sabarmati-Botad section in the work of Bhavnagar Division - Conversion of SWR to LWR on 2 to 4 Degree Curve (3) Botad-Dhola section: Through sleeper renewal from Botad to LC No. 163 (2 Km).
Ahmedabad Division - Rehabilitation of allied facilities at Track Machine Siding, Improvement to Approach Road, walls and drainage arrangement by providing sump and drain to prevent water logging of RUB, Removal of Deficiencies in Divyangjan Amenties at Various Stations under jurisdiction ADEN-Gandhidham.(Composite work)
Anand - Godhra : OHE Modification in existing OHE and other allied TRD work in connection with existing PSR at Sadnapura , Angadi , Sevaliya and Tuwa,removal of existing PSR at curve no.9 at Bhalej Yard and elimination of LC Nos 2,10,13,17, 38,48, ... by RUB
Anand - Godhra : OHE Modification in existing OHE and other allied TRD work in connection with existing PSR at Sadnapura , Angadi , Sevaliya and Tuwa,removal of existing PSR at curve no.9 at Bhalej Yard and elimination of LC Nos 2,10,13,17, 38,48, ... by RUB
Anand - Godhra : OHE Modification in existing OHE and other allied TRD work in connection with existing PSR at Sadnapura , Angadi , Sevaliya and Tuwa,removal of existing PSR at curve no.9 at Bhalej Yard and elimination of LC Nos 2,10,13,17, 38,48, ... by RUB
Repair and Rehabilitation of Bridges located at km58.569 (from km58.569 to km58.696), km86.500 (from km86.500 to km86.620) and km99.575(RHS)(from km99.575 to km99.687) on 04 lane Ahmedabad Godhra section of NH 47 in the state of Gujarat
Signalling works in connection with the Engineering works of (1) Vadodara- Geratpur Section: Rebuilding of Br. No. 601UP, 601DN, 640UP, 642DN & 644DN on Vadodara Geratpur Section. (2) Vadodara-Godhra Section: Replacement of existing steel girders by ... of Major Bridge No. ...
Facility Management Services - LumpSum Based - Annual subscription charges Remote site annual maintenance technical supports and hardware AMC at Bridge No 12 Bet WKR MU 38 Bet MU MVI under ADEN RJT Jurisdiction Total 02 Nos Bridges locations for tw..
Vadodara Division :- Construction of Road under Bridges in lieu of elimination of 12 number of Level Crossings (Anand-Khambat Section: LC No. 34, 36, 41, 41X, 45 and Nadiad - Kapadvanj Section : LC No. 14, 18, 28, 38, 41, 42, 47).
Manufacturing, Supply of AT Welding portions with accesse. suitable for 60Kg E1 HH1080 grade rails and execution of AT welding works of Turnout Joints in DFC crossing stations and SEJ joints on Steel Girder bridge approaches with latest RDSO approved
Vadodara Division:- Construction of Road under Bridges in lieu of elimination of 20 numbers of level crossings (Kapadvanj-Modasa section LC No. 56, 61, 62, 65, 66, 67, 69, 70, 71, 72, 74, 75, 76, 77, 79, 80, 81, 84, 85 and 87).
Elimination of level crossings No. 21 Km 40/9-41/0, 23 Km 43/3-4, 24 Km 44/1-2 & 26 Km 45/4-5 by providing road under bridges between Gandhidham - New Bhuj Section under jurisdiction of Sr.DEN (NW)-ADI.
Improvement/Upgradation to rooms no. 104,105, 106, 107, toilet and officer hall of medical department at 1st floor of Annexe-II building & Improvement of ROB cell Room No. 150, Vigilance Branch and Crime Branch at ANNEXE-I, at Baroda House in the section of SSE/W/BH under ADEN/E-III.
Elimination of level crossings No. 13 at Km 20/8-9, 16 at Km 26/9-27/0, 19 at Km 36/0-1 & 20 at 40/3-4 by providing road under bridges between Gandhidham - New Bhuj Section under jurisdiction of Sr.DEN (NW)-ADI.
TRD work in connection with Interlocking work at LC Gate Number-75, 203, 241, 258 and Vavaniya (WWA), Dahinsara (DAC), Barwala Road(BRL), Bhakti- Nagar(BKNG) stations various locations and OHE slewing/Re-slewing work at LC Gate-113 in connection with ... of RUB /LHS ...
TRD work in connection with Interlocking work at LC Gate Number-75, 203, 241, 258 and Vavaniya (WWA), Dahinsara (DAC), Barwala Road(BRL), Bhakti- Nagar(BKNG) stations various locations and OHE slewing/Re-slewing work at LC Gate-113 in connection with ... of RUB /LHS ...
Construction of Road, Retaining, Boundary wall, Other Miscellaneous works, P Way Work for Provision of Temporary LC for rebuilding Valsad ROB and Vapi ROB in Gujarat State in connection with with DFCCIL Western Corridor (Phase 2), Package CTP12
OHE modification in existing OHE and other allied TRD work in connection with reception/dispatch facility of trains on line no.9&10 & regirdering by new composit girder of ROB : 3A ( KM 470/40 to 471/02) at Godhra , increasing CSR of lines at Kharsaliya and Ranoli and Bonding work in Vadodara- Godhra section
OHE modification in existing OHE and other allied TRD work in connection with reception/dispatch facility of trains on line no.9&10 & regirdering by new composit girder of ROB : 3A ( KM 470/40 to 471/02) at Godhra , increasing CSR of lines at Kharsaliya and Ranoli and Bonding work in Vadodara- Godhra section
Annual Maintenance Contract for Weigh bridges and Weighing scales installed in Gujarat Refinery
Vadodara division- Rehabilitation of turn table at BRCY, Bridge Godhra & protective painting of various bridges in the section of SSE/BR/BRC & Schedule painting of Br No 502, 452,471UP/DN, 520UP/DN, 504A in jurisdiction of SSE(B)BH and SSE(B)BRC of Vadodara division.(Balance Quantity).
CONSTRUCTION OF MINOR BRIDGE ON CHHABHO BORMATH ARJANVAV MADHAKAMPA UBHRANI MATA RD CH 2/730 AND CONSTRUCTION OF BOX CULVERT AT CH 13/374 ON LIMB MATHASULIYA CHANDREJ VEJPURA KAPA GODHNAL ROAD
Design, Supply,Installation,Testing and Commissioning of Indoor and Outdoor Signalling Gears along with Alteration work in Existing EI/PI for-(1) Chhyapuri-Bajva Section-Multi track Work. (2) Miyagam-Lakodara Section Fly over line project work. (3) ... of ROB .
Total Multimodal Logistics Solution for Transportation and CHA activities of KCC origin Copper Concentrate and its handling at Kandla Mundra Port Gujarat for Export
Part supply of signaling material, installation, testing & commissioning in connection with construction of ROB in lieu of LC No. 232/B at Km. 759/6-7 between station Kalol - Khodiyar, LC No. 228 at Km 753/4-5 between Kalol - Pnsar Road and LC No. 230 at km 756/4-5 between Kalol - Mahesana on Ahmedabad - Palanpur section of Ahmedabad Division(Re-invite).
Part supply of signaling material, installation, testing & commissioning in connection with construction of ROB in lieu of LC No. 232/B at Km. 759/6-7 between station Kalol - Khodiyar, LC No. 228 at Km 753/4-5 between Kalol - Pnsar Road and LC No. 230 at km 756/4-5 between Kalol - Mahesana on Ahmedabad - Palanpur section of Ahmedabad Division.
Construction of civil works up to formation including earthwork, blanketing, minor bridge, retaining wall, LC retention work etc. from Chainage 37.532 to 176.240 Valsad to Umbergaon via Bhilad in connection with construction of WDFC phaseII, CTP12.
Construction and Handing over of FOB and walkway work with Covering in connection with Redevelopment of Udhna Station at Udhna of Mumbai Division in Western Railway
DEN(West) Bhavnagar Jurisdiction: Replacement of 1533 sets of Glued Joints against the sanctioned work of :- 1) Bhavnagar Division:- Replacement of 2977 sets of Glued joint.(15.02.31.24.3.51.005) 2) Bhavnagar Division - Conversion of SWR to LWR on 2 ... important bridges . ...
DEN(West) Bhavnagar Jurisdiction: Replacement of 1533 sets of Glued Joints against the sanctioned work of :- 1) Bhavnagar Division:- Replacement of 2977 sets of Glued joint.(15.02.31.24.3.51.005) 2) Bhavnagar Division - Conversion of SWR to LWR on 2 ... important bridges . ...
Design, Modification, Alteration, Augmentation, Manufacture, Supply, Installation, Wiring, Testing and Commissioning of Existing Medha make Electronic Interlocking (EI) System at Sabarmati-D cabin, Gandhigram and Sarkhej (03) stations in connection ... with ROB work ...
Engagement of Detail Design Consultant (DDC) for providing consultancy services for structural design and drawings of viaducts, bridges and other structures in connection with new BG Line construction between Tanda Road (ex.) - Jamaniya - Tirla (ex.) [45.71 km] located in Dhar District of Madhya Pradesh State and pertaining to Chhotaudepur - Dhar New BG Line Project in Vadodara Division of Western Railway.
Carrying out electrical utility shifting (underground/overhead as per site condition) in connection with ROB in lieu of LC No. 44, Dahod Yard, Dahod, Gujarat
Bhavnagar Division- Group work for elimination of 15 Nos. Level Crossings by provision of Road Under Bridges/Limited Height Subways at LC No. 43, 46, 50, 51, 57, 78, 85, 86, 89,99, (Dhasa-Rajula section), LC No. 112X (Rajula-Mahuva section), LC No. 10, 13 (Rajula-Pipavav section), LC No. 07 (Dhasa-Jetalsar section), and LC No.29 (Rajkot-Jetalsar section) under Sr.DEN(Central) Jurisdiction.
surgical isolation or surgical masks (Q3), Filtering Half Mask-Air Pollution Mask-IS 9473 (Q3), Alcohol Based Hand Rub/Hand Sanitizer (Q3), Patient Bed (Fowler and Semi Fowler) (Q3)
Ratlam division Section: Replacement of Pitted and perforated bracing angles , cross girder bottom angles, top flange cover plates, bed plates OHE Protection screen and inspection cradles, anti crash barrier drainage spouts, defective rivets, ... track bridges of ...