Loading…
Loading…
1,640 results • Best match
Maintenance of CD SH-165 Highway Connecting from Mavinsur (on SH-126) to Miryan (Karnataka Telangana Border) (Revansiddeshwar Temple to Chandankera Upgraded SH-165) from Ch 7.47 and 7.85 and SH-165 at Ch 0.40, 0.45 and 1.48 in Chincholi taluka under ... CD/ Bridges Maintenance ...
Custom Bid for Services - Hiring of Multy Utility Road vehicle for the use of AXEN Bridges MYS of MYS Division-Including SKLR section-in good working condition for a period of 24 months with overall 2000 kms per months, Custom Bid for Services - Extra Kilometers over and above 2000 Kms, 500Km x 24 Months x 1 Vehicle = 12000 Kms Similar Category Monthly Basis Cab & Taxi Hiring Services Monthly Basis Cab & Taxi Hiring Services
Development Works of Inchur Tree Park 3D stone designed RCC Concowood water fountain work, RCC Concowood stone designed Water pond, Construction of Octogonal type of MS structure, RCC concowood railing work, Butterfly selfie point RCC Concowood ... Concowood bridge work , ...
Providing PMC Services including Supervision, Quality control for Expansion/ Widening of narrow water vents for Construction of Retaining Walls, U drains, Box drains and Culverts/Bridges to Storm Water Drains at Various locations in R R Nagar and Yeshwanthpura Constituency of R R Nagar Zone Package RRN-1 (Project No. 14, 15 and 28)
Preparation of Detailed Project Report (DPR) including Survey, Soil Investigation, Hydraulic Studies, Detailed Structural Design and Drawings, Detailed Estimate, Tender Documents and Land Acquisition Plan for Construction of Bridge across the Stream on the Road from Balaganur to Narayananagar Camp in Sindhanur Taluk of Raichur District(Maski Constituency). under 5054 Karnataka Road Development Corporation Limited Capital Expenditure for the Year 2026-27.
Construction of Bridge cum barrage to halla across the road which connects between Honnenahalli to Gomardhalli villages, construction of checkdam in Sy.No 4/1 of siddapura village, Sy.No 53 of Honnenahalli village, construction of checkdam & causeway to Sy.No 67 of Gowdagere village and Providing protection works to existing checkdam constructed across Chikkasandra tank kodi halla in gowdagere hobli, Sira taluk
NYLOC NUT M20 HIGH TENSILE, as per Drawing: IS:7002-1991/DIN982, 10, COATING AS PER MDTS-057, Packing Instruction: AS PER STANDARD PACKING. IT SHOULD BE ENSURED THAT ITEM SHOULD NOT RUB DURING TRANSPORTATION. THE ITEM SHOULD BE PACKED WITH ADEQUATE STRENGTH. TRANSIT DAMAGE, IF ANY, SHALL BE AT THE COST OF SUPPLIER. AS PER DRAWING NO: LW05004 alt 'd', ITEM NO-57
NYLOC NUT M20 HIGH TENSILE, as per Drawing: IS:7002-1991/DIN982, 10, COATING AS PER MDTS-057, Packing Instruction: AS PER STANDARD PACKING. IT SHOULD BE ENSURED THAT ITEM SHOULD NOT RUB DURING TRANSPORTATION. THE ITEM SHOULD BE PACKED WITH ADEQUATE STRENGTH. TRANSIT DAMAGE, IF ANY, SHALL BE AT THE COST OF SUPPLIER. AS PER DRAWING NO: LW05004 alt 'd', ITEM NO-57
Providing PMC Services including Supervision, Quality control for Expansion/Widening of narrow water vents for Construction of Retaining walls, U drains, Box drains and Culverts/Bridges to Storm Water Drains of various locations in Byatarayanapura Yelahanka Constituency of Yelahanka Zone Package YLK-01 (Project no 03, 04, 05, 06, 07, 08, 22, 23, 24, 25, 26 and 09)
Empanelment of Consultants for the Preparation of Detailed Project Reports (DPRs) for Long-Span Bridge Works under the Karnataka Rural Road Improvement Project (Pragathi Patha)
Construction of Barrage near Yallammawadi across Halla near the lands of community farmers (Schedule Tribes) of Koktnur village, Construction of Bridge cum Barrage across Halla near Pujari tota of community farmers (Schedule Tribes) joining Kamatagi school road of Kokatnur-Yallammawadi village & Construction of Checkdam across Halla near community lands of farmes (Schedule Tribes) of Adahali village in Athani taluka, Dist-Belagavi (TSP/2025-26)
Consultancy service for submission of Detailed Project Report for the work Construction of Bridge Cum Barrage and Check Dam Cum Bridge across nala flowing in-between Madlur Lagluru and Sompura and Malekoppa villages in Yalaburaga and kukanoor Taluk of Koppal district with report, detailed surveying, Design and other relevant informations required for DPR along with DTS 6 (Six) sets along with one soft copy
Improvements road from Ashnal Village Main road to Ashnal Village, Construction of Bridge on Main road from Church to Kumbar House road in Allipur Village, Construction of C.C road and Drain from Main road to Government Hospital at Yelheri Village, Contruction of B.T road at Putpak Village Main road to Putpak Tanda & in Gurmitkal Taluka Dist Yadgir (Under CMIDP Fund for the year 2025-26)
REPAIR OF BRIDGE HANDRAILS, PAINTING AND SAFETY WORKS ON PUBLIC WORKS DEPARTMENT MAJOR DISTRICT ROADS AT KM 5.60KKM OF BYTHURLI-NEERUMARGA-KALPANE, KM 3.60 OF VAMANJOOR-PERMANKIPADAVU, KM 0.95 OF NEERUMARGA-ADYARPADAVU-ARKULA, KM 3.40 OF GANJIMUTT-KUPPEPADAVU, KM 2.45, 5.20 AND 15.10KM OF KUPPEPADAVU-IRUVAILU-MOODABIDRI, KM 3.50 AND 3.75KM OF KAIKAMBA-KAMAPADE, KM 6.20 OF MARAVOOR-ADYAPADY-UNILE-KANDAVARA, KM 0.00 OF BAJPE-BHATRAKERE KATTALSAR-NELLITHEERTHA, KM 5.10KM OF MARAVOOR-JOKATTE-PANAMBUR, AND KM 2.30 OF EKKUR-KANEEKATTE-NEERUDE IN MANGALURU TALUK
Total Road length of the project 21.00 Km Right of Way 100m Access controlled eight lane main carriage way separated with central median of 4m Service road separated from main road by precast post and panel wall on city side - 11m and 7m Service road ... and RoB ) ... Highways). ROB at ... and major bridges across ...
Repairs to CDs On Raichur Shakthinagr via Arshangi, Kadlur & Deosugur Palvaldoddi via Kortakunda, Mamadoddi, Yergunta SH-191 Road at KM. 1.80 & 28.90 & SH-10 to Mudhol-Yergera (Andhra Border) SH-127 Road at KM. 182.80 & 183.10 In Raichur taluka, ... SH Bridges Maintenance ...
Annual Maintenance of Culvert/Bridges at Ch 52.30 km,53.20 km,60.86 km & 63.66 Km On SH-188,The Highway Connecting Magadi to Chelur (on SH84) via Agalakote handpost (on SH85), Bettahalli, Anchihally (on NH75), Koteningaihnapalya, Kunigal, Kothagere, Madakehalli, Seegehalli, Murlikuppe, Shettigonadanahalli (on SH84), Manichendur, Mayasandra/Soravanahalli (on NH150A), Nittur (on NH73), Udde Hosakere (on SH84) in Turvekere Taluk Reserved For CAT-IIA
Maintenance of Arterial and Sub-Arterial Roads including footpath in K.R.Pura constituency area of RI K.R.Pura Division which includes Removal of vegetation in footpath and medians, Removal and disposal of silt in Road side drains and shoulder ... all RUB , ... RUB, ROB , ...
Construction of Bridge cum barrage to Lakshmisagara tank kodi halla near Tavarekere village, Construction of causeway in Sy.No 236 of Hendore village, Construction of checkdam & causeway near Tarur village, construction of causeway to halla across Yaladabhagi to Mudumadu road, Construction of checkdam cum bridge in Sy.No 99/1 of Chikkahulikunte village, Construction of causeway to Mudigere tank halla across the road which connects between Bacchikatte and Mekerahalli village in Gowdagere Hobli, Sira taluk
PIPE 22X2.0 MM IN LENGTH OF 6000MM, as per Drawing /Specification: DIN2391- C-DIN17456 GRADE 1.4301 (X5CrNi1810), ''SOLUTION ANNEALED AS PER PARA 6.2 OF DIN 17456-99'' - 3.1B & IDENTIFICATION MARKING AS PER SME/DEV L.NO.MD46131 DT.03/05/06., Packing ... NOT RUB DURING ...
liquid handwash, Alcohol Based Hand Rub/Hand Sanitizer, Surgical isolation Faceshield, MEDICAL GOWNS - DISPOSABLE, surgeon caps or hoods surgeons cap disposable, medical staff shoe cover, Medical Safety Goggles
Construction of Box Culvert
RFP for Construction of New Broad Gauge Line between Chainage 90000 and Chainage 130375 (40.375 km) including Civil & Track works, Signal & Telecommunication works, Railway Electrification and Electrical General Services between Hiriyur(Incl.) & ... various bridges (Civil ...
Gadag-Betageri twin city limits 1) 280 mm dia MS near Rajnala near Mission Compound 2) BB. 140 mm dia MS pipeline for a total of 2 bridges on the way to Samba Nagar (3) 140 mm dia MS pipeline near Vasant Singh Jamadar Nagar bridge , MS pipeline opposite St. John School and repair and installation of new UPVC line in Ward No. 6 Harijan Keriya
Antiseptic/Antimicrobial Hand Wash, Squeeges or washers- wipers-mopper, Household Disinfectants Or Disinfectant Fluids Phenolic Type-IS 1061, brooms, Wall Clocks-IS 12510, Alcohol Based Hand Rub/Hand Sanitizer
Improvement to feeder canal from Sira Chikkakere to Kallukotte Kere, Construction of bridge to Chikkakere Kodi Halla, Construction of causeway to halla running from Sira Doddakere to Chikkakere near Kote, Construction of checkdam to Sy.No 238 in Kotta village, Construction of checkdam to halla of Kusukunte tank near Channanakunte village, Construction of checkdam to Magodu tank, Construction of checkdam to halla of Mudigere tank near Sy.No 3 in Kasaba hobli of Sira taluk
Maintenance work
1)SBC-TK-SPGR Section- Proposed construction of ROB at LC.No50 @KM:85/700- 800 42m composite Girder 2)Proposed construction of RUB at LC gate No.48 @kM 81/500-600 between Mallasandra and Gubbi stations in ADEN/YPR sub division 3)SBC-TK-SPGR ... ( RUB N0.297 ...
Maintenance of State Highway Bridges 1) Repair of damaged approach road and curtain and other work of Rankalakoppa Bridge at Auradh Sadashivagada Road (SH-34) Km.467.300, Ramadurga Taluk. 2)Widening of bridge at km 21.10 and 22.85 of Yaragatti Babaleshwar Road (SH-55) of Ramdurg taluk of Belagavi district Under H/A 3054-03-102-0-01-200 for the year 2025-2026.(Reserved for SC only)
Hassan - Mangalore section: Replacement of elastomeric bearing and repairing of inspection platform at Br.No.232 (Span:3x12.19m) Km.67/400-500 at YDK yard (SKLR-SBHR Ghat section) & Strengthening of cracked RCC girder at Br.No.43 (Span-1x12.19) at ... girder bridges due ...
Consultancy services for Preparation of Detailed Project Report(DPR) and estimates including survey, detailed investigation, preparation of designs, drawings for Modernization of Ranikere Feeder Canal network (Canal re section, lining, & Canal ... including bridges , ...
Consultancy Services for Project Management including Supervision, Quality control (PMC) for Package no 07 (Package Consists of 5 Works Rs.1000.00 Lakhs) 1) Resurfacing to Bhadrappa Layout main Road from Tata Nagara junction to ORR. 2) Improvement ... Kodigehalli Rub to ...
Bridge Maintanance
CONSULTANCY SERVICE FOR DETAILED SURVEY, INVESTIGATION, PREPARATION OF DESIGN, DRAWINGS AND DETAILED ESTIMATE FOR CONSTRUCTION OF BRIDGE CUM BARRAGE ACROSS LOCAL NALA NEAR CHNADORI VILLAGE IN KAMALANAGAR TALUKA AND BIDAR DISTRICT
BRIDGE AND ROAD IMPROVEMENT AT KONDALKANA IN PANAJE VILLAGE , PUTTUR TALUK UNDER THE HEAD OF ACCOUNT 5054-03-101-0-02-132 MAJOR DISTRICT ROAD BRIDGES - CAPITAL EXPENDITURES
Improvements of road in Muguluvahalli village and Kallushettyhalli village of Andale gram Panchayat Madihalli hobli, Adaguru village in Adaguru gram Panchayat halebeedu hobli, Improvement and Ashphalting in A.Kodihalli village in halebeedu hobli, ... and Construction of Bridge in ...
Maintenance of Culvert
Bridge Cum Checkdam
Appointment of Consultants to Providing Project Management Consultants (PMC) for preparation of DPR for Development works like improvements of layouts & construction of arterial roads and major Roads. Storm water Drain, Building, Parks , Water ... and bridges , ...
Consultancy Service for the Preparation of DPR
Preparation of Detailed Project Report for Construction of Bridge at Km 96.50 and Km 95.95 on Arabhavi Challakere Road (SH-45) in Navalagunda Taluk & Dharwad District Under 3054 SH Bridge Maintenance for the year 2025-26.
Painting of Steel Girder Bridges & other steel structures in SSE/BR/O/MYS section due for the year 2026-27: Br.No.732 DN,704 A, 725A UP, 725A DN, 726 DN, 726 UP in MYS-Y section, Br.No.62A in RRB-JRU section,Bridge No. 200A in RRB-TLGP section, Bridge No 17B, 18B, in JRU-UBL section,Bridge No 74, 75, 41, 40 JRU-RDG section, Bridge No 8A, 75A, 100A, 46 in DRU-CMGR, Bridge No. 758A, 763 in MYS- CMNR section.
Bengaluru Division: SW-I: YNK-BWT section: Proposed extension of RUB Bridge No. 75-A at Railway km 102.917 in Srinivasapura station yard (Exg 2 X 7.5m X 5.5m (Twin RCC Boxes), Proposed extension as 2 X 7.5m X 5.5m (Twin RCC Boxes) - 13m) in connection with the work of track machine siding. SW-II: Construction of track machine siding of 250m length at SVS station in connection with the work of Construction of Track Machine siding for a length of 420m at 15 minor stations in SBC Division. Maintenance period is 6 months or one monsoon period whichever is later.
Construction of box culvert and approach road
Maintenance of Bridges on Sandur-Siraguppa SH-49 at km.61.38, km.64.5, km.65.5, km.68.24, km.68.31,km.70.1and pipe culverts on Mudagal-Kudithini SH-29, at km.98.25, km.100.82, km.103.77, km.104.00, Kampli-Kurugodu-Kudtithini-Haraginadoni-Balagal-Ballari-Mika-Alur Road SH-132 at km. 4.20, km.7.30, km.10.25, km.29.50, km.35.95, km.1.36, km.1.76, km.2.15, km.2.97, km.3.20 and Deodurga-Amarapura-Bhogavathi-Hirrekotnakal-Ayanur-Ballari-Rupanagudi-Chellagurki SH-128 at km 185.60 in Kampli and Ballari taluks under 3054-SH Bridge Maintenance.
Replacement of corroded members, corroded chequered plate of steel girder bridges in YDK-MAJN section(including YDK-SBHR Ghat section) in SSE/Bridge/SKLR jurisdiction. Br.No.237, 238, 239, 241, 246, 247, 248, 249, 250, 251, 254, 255, 256, 258, 261, 263, 264, 270, 271, 272, 273, 274, 275, 276, 277, 279, 281, 282, 283, 285, 287, 289, 292, 296, 297, 298, 300, 303, 306, 309, 316, 318, 322, 326, 327, 328, 334, 335, 337, 353, 358, 366, 367, 385, 400, 446, 474, 484, 485, 500, 507,577,578,582,593,597,613 & 630)
Bangalore-Setting up of 'safety village' for training of break down officials in disaster management at IRIDM - HEJJALA - Balance works of: Administrative Block / Hostel / Sports Complex / Quarters / Station Building / Roads / Bridges,Drains etc.New Works of :Rain water Harvesting / STP / Multi Purpose Hall / alterations in Existing Rooms / Supervisor & Officer blocks / New Halt Station works etc. Accident demonstration open theatre for demonstration of accidents with 140T DBHD crane / Covered shed of total size 40.00m x 12.00m for stabling Gottwald Design 140T on capacity Crane on HJL siding etc., including Electric works (Composite work)
Replacement of corroded members, corroded chequered plate of steel girder bridges in YDK-MAJN section(including YDK-SBHR Ghat section) in SSE/Bridge/SKLR jurisdiction. Br.No.237, 238, 239, 241, 246, 247, 248, 249, 250, 251, 254, 255, 256, 258, 261, 263, 264, 270, 271, 272, 273, 274, 275, 276, 277, 279, 281, 282, 283, 285, 287, 289, 292, 296, 297, 298, 300, 303, 306, 309, 316, 318, 322, 326, 327, 328, 334, 335, 337, 353, 358, 366, 367, 385, 400, 446, 474, 484, 485, 500, 507,577,578,582,593,597,613 & 630)
Supply, installation testing and commissioning of 2 numbers of new laptops for the relay testing, communication works and conduction of other diagnostic tests of equipment at Sharavathy Generating station as per the technical specification in Section ... on FOB destination ...
CONSTRUCTION OF BRIDGE ACROSS NETHRAVATHI RIVER FOR CONNECTING KOTEPURA TO BOLAR (ON MANGALURU-CHERVATHUR-KARAVALI MDR) IN MANGALURU, DAKSHINA KANNADA DISTRICT, UNDER NABARD-RIDFXXXI -SUB ESTIMATE Consultancy service for preparation of DPR including all structural drawings for kotepura - bolar bridge in Mangaluru, Dakshina Kannada District