Loading…
Loading…
6,619 results • Recent activity
MTPS I Mill Plant Unit II Complete dismantling of Mill internals reconditioning renewal of worn out parts bearings replacement of worn out worm wheel with worm shaft and renewal of worm gear hub etc in any one Mills 2A to 2D 2F
MTPS I Mill Plant Unit IV Reconditioning of released SS elliptical feeder discharge chutes released from Unit II Unit IV
MTPS I Mill Plant Unit IV Dismantling and Replacement of worn out damaged skirt board assembly with new one old dismantling re assembling the coal flow control plate measuring the gap between the coal flow control plate
PROCUREMENT OF 4 PAIR AND 8 PAIR 0.5 SQMM FRLS ARMOURED COPPER INSTRUMENTATION CABLE
MTPS I Mill Plant Unit IV Dismantling and assembling of Coal pipes with bends and releasing bends for reconditioning of the eroded portion and patch welding of coal bends Coal pipes and renewal of eroded pipes of length at about 15mtr length
MTPS I Mill Plant A C Plant Unit IV AOH 2025 26 Air Washer System Epoxy painting of blowers and its auxiliaries enamel painting of AWCW Pumps pipe lines Spray nozzles flushing works renewal of bellows in discharge ducts W type eliminator