Loading…
Loading…
165 live110 closing this weekmost from Chief Engineer PWD Central Zone,Lucknow and Chief Engineer Gorakhpur Zone PWD Gorakhpur UP
165 results • Best match
Construction of a 3 X 5 X 4.5 meter span box culvert in place of the previously constructed damaged minor bridge on Kauasar drain at Km 1 of Mehdiganj Naugawan road in Kushinagar district
Construcation of Minor Bridge 3x15 Meter span at faren Nala approach road Additional approach road and Protection Work on Bhauapar Jaipur Ibrahimpur road km-2 in Sardarnagar Distt Gorakhpur Lot No 1 of 1
Construction work of 4x4 m Span RCC Minor Bridge Approch Road and other safety work on Between Gram Dhobauli and Gram Ashapur in Distt Gorakhpur in FY 2026-27 Lot No 2 of 5
"Electrical work in connection with "Provision of 12 m wide FOB at GMC yard regarding developed GMC yard as satellite station in Prayagraj division"
OHE Modification in connection of Provision of ramps on existing FOB for recoupment of shortfall in MEA at Mauranipur (MRPR) station of Jhansi Division
Construction of minor bridge of 2x3x3 m span and approach road in place of the old narrow arch culvert located at Km 2 and 10 of Ghugli Shikarpur Road ODR Lot No 1 of 5
Construction of new minor bridge in Place of Damaged bridge at km 2 in Desahi Deoria Rampur Hiraman Chouraha to Madrapali Bharat Rai via Shami Patti link Road under RY (VR) Scheme in Dist Deoria
Construction of 5x6 mt Span Minor Bridge, Approach Road Additional Approach and Protection Work On Kachhla Sahaswan Road to Jinora Road Instead of Rapta Bridge In Km 2 Under Rajya Yojna in financial Year 2026-27.
Construction of ROB in lieu of Level Crossing No. 229 at km 1324/16-18 in between RPGU-BNAR stations in VGLJ-CNB Section & Construction of ROB in lieu of Level Crossing No. 367 at km 1126/20-22 at Jhansi yard in BINA-VGLJ section in Jhansi division of North Central Railway.
CONSTRUCTION WORK OF APPROACH ROAD AND MINOR BRIDGE OF 9X4X4.00 M AND 7X3X3.00M SPAN AT LOCAL NALA BETWEEN KM-1 RAIGANJ LINK ROAD AND KM-2 GARHIGHAT LINK ROAD IN DISTRICT BAHRAICH FINANCIAL YEAR 2026-27 VIDHANSABHA-NANPARA
Balance work of Execution of Earthwork in formation, Blanketing and Construction of Minor Bridge no. 40, 44, 46, 53 & 60 between the section of Mehdawal (excluding) to Kheshraha (excluding) in connection with Khalilabad- Bahraich new B.G Rail line Project.
Construction of Service building, S&T rooms, gate lodge at level crossing, Rail/ high level passenger platforms, fencing, extension of minor bridges etc. provision of station name board, including dismantling of existing Building structure & fencing, ... subway/ Road under bridge in ...
Provision of RUB in lieu of LC no. 49Spl,52C,53C, 69C and 71C in Zafarabad - Ayodhya Cantt section of Lucknow Division on Northern Railway
Construction of Platform No-02(H.L) and FOB connection between PF-1 and PF-2 at Bilaspur Road in jurisdiction of ADEN/KPV in Izzatnagar division of N.E.Railway.
Work of box culvert of 3 X 4 X 5.50 meter span in place of the previously constructed damaged minor bridge on Baitiah Nala of Hasanganj Matiyar Tola link road at Km-2 of Kaptanganj Pakriyar road in Kushinagar district.
Construction work of 5x5x5 m Span RCC Minor Bridge Approch Road Additional Approach Road and other safety work on between Chilwa Harijan basti and Dhaushar belwabari on Taraina nala in Distt Gorakhpur in FY 2026-27 Lot No 1 of 5
Const. of Interlocking tiles and drain and bridge work from Monu House to Gandhi plot in ward 11 under Nagar Panchayat Gabhana.
"Land acquisition and other allied works in connection of various ROB's/RUB works under jurisdiction of Dy.CE/GSU/GWL of Jhansi Division of North Central Railway".
Const. of Interlocking tiles and drain and bridge work from Main Road to Rajendra mam House in ward 08 under Nagar Panchayat Gabhana.
Const. of Interlocking tiles and drain and bridge work from Jai prakash House to Jaipal house in ward 01 under Nagar Panchayat Gabhana.
OHE Modification work in connection of construction of RUB in between KM 1173/5- 7 of MCSC-DAYG section in LAR-KURJ-MBA section of Jhansi division
Comprehensive annual maintenance of Medha make Electronic Interlocking at 3 Stations as Bharwari (BRE), Rasulabad(RUB), Malwan (MWH) of Prayagraj division for a period of three years.
Construction of 4-lane ROB (approaches excluding Rly portion) in lieu of L-Xing No - 96-A on Ayodhaya - Akbarpur section of Lucknow Division on Northern Railway.
S&T work for Replacement of old FOB by 3.05M wide new FOB with Ramp for recoupment of Divyangjan Facility at Chola & Wair stations of PRYJ Division and S&T work for Raising of Platform Up to high level for recoupment of shortfall in MEA at Hathras (PF No. 2&3 ), Barhan (PF No.1&2), Shikohabad (PF No.-3/4) and Makkhanpur (PF No. 2/3) stations.
Construction work of box culvert of 3 X 5 X3 meter span in place of the previously constructed damaged minor bridge on Somal Tal at Km-3 of Bhathi Buzurg road via Tola Ghurchhapra of Bhathi Buzurg from Pandey Rai Pitch Road in Kushinagar district
Construction of RUB in lieu of LC No. 15/C and LC No. 17C on Unchahar - Raebareli Section of Lucknow Division on Northern Railway under DyCE/C-V/LKO
Construction of RUB in lieu of LC No. 28/C, 36/C and LC No. 31C on Phaphamau- Unchahar Section of Lucknow Division on Northern Railway under DyCE/C-V/LKO
Provision of Twin Box RUB/LHS at Minor Br. No. 778 at KM. 1068/35-37 in UTR-LKO section of SSE/W/LKO under ADEN-I-LKO (Near Pipraghat Bridge)
Re-Construction of Damaged Bridges at Km. 177.473, Km. 182.126, Km.186.754 and Km. 187.448 of Anoop shahar Branch Canal Under Aligarh Division Ganga Canal, Aligarh
Construction of RE Wall and Approach Road Both Side at 2 lane ROB in Lieu of L-Xing No 173 at Km 531/1-2 Bet Maghar-Khalilabad Station Distt.- Santkabir Nagar
25 KV Electrification work in connection with Provision of Ramp for FOB at various station of under jurisdiction of Sr.DEN-III/BSB (GYN, DLR, JKN, SDT, SRNT (total-05 station), BSB division of N. E. Railway.
Provision of RUB in lieu of LC no. 13/B (Km 16.750), 37/C (Km 66.388) and 39/C (Km 69.197) on Ayodhya Cantt-Sultanpur-Chilbila Section of Lucknow Division on Northern Railway.
Provision of RUB/LHS in lieu of LC No. 55/C, 58/C, 57/C, and 59/C in the Maa Belha Devi Dham Pratapgarh Jn. - Phaphamau Section of Lucknow Division, Northern Railway.
Development of Link Connector Corridor between NH-19 and Varanasi Ring Road with Riverbank Connectivity along River Ganga for Decongestion of Varanasi City PKG2 from Km7.926-Km18.560 (TL 26.039Km MCW FOB Loop Ramp) in UP on HAM
Electrical work in connection with Provision of First foot over bridge with cover shed at 5 Station of N.E.Railaway LJN Div, Provision of essential items for Goods shed like Tarpaulin , Major Improvement work like Extension of PF No. 02 & water supply pipeline & sanitation and Provision of RCC OHT, Extension of 09 Nos. Passenger platform at 08 Nos. at different stn. at Ljn-Div, Upgradation of Infrastructure facilities of new coaching depot at GKP, Interlocking of 06 No. LC gates TVU greater than 20000 over LJN DIV, Renovation of CMS hall, waiting room for ladies and gents etc. at crew lobby MLN.
CONSTRUCTION OF BRIDGE OVER NAYA RIVER ON T01 FROM ALIPURDUAR FALAKATA ROAD NEAR TAPSHIKHATA BAZAR TO ALIPURDUAR FALAKATA ROAD AT BABURHAT MARKET NEAR UTTAR SONAPUR VIA MATHURA BAZAR AT ALIPURDUAR DISTRICT. PKG.WB2195
S&T work in connection with provision of Ramp for FOB at KRND, MMA, SMZ, GYN, DLR, JKN, SDT & SRNT and Extension & Raising of platform for 24 Coaches at GYN, CC, GB, BTT & DHE stations of Varanasi division.
CONSTRUCTION OF BRIDGE OVER KURMAI RIVER ON T01-FROM ALIPURDUAR FALAKATA ROAD NEAR TAPSHIKHATA BAZAR TO ALIPURDUAR FALAKATA ROAD AT BABURHAT MARKET NEAR UTTAR SONAPUR VIA MATHURA BAZAR ROAD OF ALIPURDUAR DISTRICT. PKG.WB2194
IE Services for development of Link CC between NH-19 and Varanasi Ring Road with Riverbank Connectivity along River Ganga for Decongestion of Varanasi City PKG2 from Km7.926-Km18.560 (26.039 Km including MCW FOB Loop Ramp) in UUP on HAM
CONSTRUCTION OF BRIDGE OVER CHAPRA RIVER ON T01-FROM ALIPURDUAR FALAKATA ROAD NEAR TAPSHIKHATA BAZAR TO ALIPURDUAR FALAKATA ROAD AT BABURHAT MARKET NEAR UTTAR SONAPUR VIA MATHURA BAZAR ROAD OF ALIPURDUAR DISTRICT. PKG. WB2193
Electrical work connection to 1.Additional work of DEOS station under ABSS.2.Additional work of BTT station under ABSS.3.Provision of Foot over Bridge (6.0m wide) at CPJ.4.Provision of store room at LIJ and JGP, KKT & SSU, New waiting hall at TRJ and miscellaneous work at KKT.5.Provision of Interlocking LC gates irrespective of TVU on account of Restricted visibility in BSB Division with RTU & Power Supply arrangement (Total 08 No. LC). 6.Provision of Interlocking of LC gates having more than 50000 TVU in BSB Division with RTU & Power Supply arrangement (SQW-RTU-35 Spl & POU-KKT-64 Spl) (Total 02 No. LC).
Construction of 2 Lane ROB including approaches in lieu of LC No.29-C at Km 47/19-21 between Sonik-Unnao Section in Lucknow Division on Northern Railway under Dy. CE/C-IV/Lucknow on Northern Railway.
Annual repairs, white washing & painting of Staff Quaters in various colonies and Annual repair of Bridges in the section of SSE/W/BSB under ADEN/BSB in the jurisdiction of Sr.DEN-III/LKO.
Annual repairs, white washing & painting of various Station and other Service buildings and Annual repair of Bridges in the section of SSE/W/JNU under ADEN/JNU in the jurisdiction of Sr.DEN-III/LKO.
Zone no.11:-Zonal contract for all Civil repairing worksfalling in New Station Building. Old Station Building includingECRKU office, Traffic Hospital Platform, Circulating area ofStation East, West and Central Cabin, yards between ROB andART Siding (Excluding) under ADEN/HQ/DDU.
Strengthening of Bridge No. 29 at KM: 820/20-22 by providing jacketing in mid three spans along with provision of service road to facilitate re-girdering of existing steel girder and other miscellaneous bridge works under the section of Assistant Divisional Engineer/Line/Prayagraj.
Construction of an approach road in Gorakhpur district Bhopa Bazar ROB via the Shaheed Smarak Sthal and Ashok Iron and Steel Rolling Mill to the Chauri Chaura-Gaunar Road Other District Road At District- Gorakhpur With 5 Year Maintenance lot 1/1
Painting of all level crossing, station building, bridges etc,provision of high relief cement murals and thematic painting in the section of ADEN/HW and ADEN/RK in C/W Ardha Kumbha Mela-2027. (201/26 Revenue)
25 KV OHE Electrification work in connection with Prop Launching/Erection of 06 Lane ROB at CH:17+880 RE pole km 381/18-381/19 between unaula- Pipraiach station GKP By pass starting from NH-29 E & ending NH-28 of N.E. Railway,Varanasi Division.