Loading…
Loading…
1,538 results • Best match
Establishing 2x20MVA, 110/11kV Sub-station at Torehalli and Construction of 110kV LILO line on DC towers using Panther Conductor from existing 110kV Nittur-Gubbi SC line to the proposed 110/11kV Sub-station at Torehalli for a distance of 1.368kms ... Partial Turnkey Basis ...
Establishing 2x20MVA, 110/11kV Sub-Station at Kollur Village in Chincholi Taluk, Kalaburagi District along with construction of 110kV LILO line using Lynx conductor from existing 110kV Chincholi-Mann-E-Khelli SC line to proposed 110/11kV Kollur ... Partial Turnkey basis ...
Combined Package for following works Work A- Providing alternate source to 66/11kV Chokkasandra Sub-station by providing 66kV, 1000sqmm SC UG Cable from existing 66/11kV Chokkasandra Sub-station to 66/11kV Dommasandra Sub-station for a route length ... Partial Turn Key basis ...
Providing a 2000 Ltr capacity backup hot-water system for Harapanahalli Town Government Hospital Block B building 2000 Ltr capacity 3000 Ltr capacity hot-water system for the Community Health Centre CHC of villages under Harapanahalli Taluk 3000 Ltr ... Tank Turnkey basis
Establishing 2X20 MVA 110/11 kV sub-station at Koralli (Hikkanagutti) and Construction of 110 kV LILO line using Lynx conductor from existing one of the circuit of 110kV Aheri(Sindagi)-Almel DC line to the proposed 110/11kV Koralli(Hikkanagutti) ... Partial Turnkey Basis ...
Establishing 1x20MVA, 110/33kV and 2x20 MVA, 110/11kV Sub-station at H.V.Kunta (Uppaladinni) Village and Construction of 110kV LILO line using Lynx conductor from existing 110kV Kushtagi-Bevoor SC line to proposed 110/33/11 kV Sub-station at ... Partial Turnkey Basis ...
Establishing 2x20MVA, 66/11kV Sub-station at M.Dasarahalli (Madaluru) and Construction of 66kV LILO Line on 110kV DC towers with Coyote ACSR conductor from the existing 66kV Sira-Madhugiri Line-2 to the proposed 66/11kV Sub-station at M.Dasarahalli ... Partial Turnkey Basis ...
Providing Additional 2Nos of 11kV, MEI Make, 500MVA, 1250A, 25kA PCVCB type Switchgear for bifurcation of overloaded existing feeders at 66/11 kV S/s Bhaktharahalli in Anchepalya Nodal Centre, KPTCL, Operation Division KB Cross Including Supply Of ... Partial Turnkey Basis, ...
Site Survey & Preparation of Link Budget, Approvalfrom DoT and DoS, Liasoning, Supply, Installation, erection, Testing & Commissioning of the Hub baseband System (1plus1), RF system (1plus1), Earth Station Antenna System suitable for Ku-Band ... Total Turnkey basis.
Establishing 1x20 MVA, 110/33 kV and 2x20 MVA, 110/11 kV Sub-station at Nadavi(Mallapura) along with Construction of 110kV LILO line using Lynx conductor from existing 110 kV Tekkalkote-Sirigere Cross SC line to proposed 110/33/11 kV sub-station at ... Partial Turnkey Basis ...
Providing hot water facility to the Dr. B. R. Ambedkar Government Post-Metric Boys Hostel by installing 3000 Ltr capacity hot water storage tank for the Dr. B. R. Ambedkar Government Post Metric Boys Hostel Labour Block 5000 Ltr capacity hot water ... Tank Turnkey basis
Providing Consultancy Services for Preparation of Detailed Project Report (DPR) Economic Analysis, Survey, Plan Design, Preparation of Estimates, Cost Structure etc., for Implementation of 30MLD External Water Supply Scheme to Raichur Growth Area, ... Total Turnkey Basis.
Establishing 2x20 MVA, 110/11 kV substation at Kuppagadde and construction of 110kV DC line from existing 110/11 kV Togarsi substation in Shikaripura taluk to proposed 110/11kV Kuppagadde substation using Panther conductor for a distance of 11.648 ... Partial Turnkey Basis ...
Combined package for Work A Establishing 2x20MVA 66/11kV substation at Shanappanahalli alongwith running of 66kV 1000sqmm UG Cable LILOing from proposed CTT in existing 66kV NRS-Doddaballapura-Devanahalli-2 line to proposed 66/11kV Shanappanahalli ... Partial TurnKey basis.Work ...
Establishing of 2X20 MVA, 66/11 kV Sub-Station at Purigali along with Construction of 66kV DC line from the existing 66/11kV Chandahalli Sub Station to the proposed 66/11kV Purigali Sub-station using 110kV Narrow Based Towers with Panther ACSR ... Partial TurnKey basis ...
Combined Package for,Work A-Providing additional 1x20 MVA, 110/33-11kV Transformer at 220/110/11kV Nittur Sub Station in Gubbi Taluk, Tumakuru District.Work B-Replacement of 2x10MVA 110/33-11kV Power Transformers by 2x20MVA, 110/33-11kV Power ... Partial Turnkey Basis, ...
Establishing 2X20MVA, 66/11kV Sub-station at Handpost along with conversion of 66kV SC line on SC towers to DC line on DC towers from Location No.89 Panchanahalli Junction point to 66/11kV Panchanahalli sub-station for about 27.032km using Coyote ... Partial Turnkey basis ...
Establishing of 2X20 MVA, 66/11 kV Sub-Station at Thathnur along with Running of 66kV, 1000 sqmm S/C UG Cable from existing 220/66/11kV Sarjapura S/S to proposed 66/11kV Thathnur S/s for a route length of 9.612 Kms and Construction of one No of 66kV ... Partial TurnKey basis ...
Combined Package for, Work-A Providing additional 1x20MVA, 66/11kV Power Transformer at 66/11kV Shobha Forest View Sub-station in Bengaluru South Taluk, Bengaluru Urban District. Work-B Providing additional 1x20MVA, 66/11kV Power Transformer at ... Partial Turnkey Basis, ...
Combined Package for, Work A Providing additional 1x20MVA, 110/33 11kV Power Transformer at 110/33/11kV Korwar Temple Sub Station in Kalaburagi Taluk and District. Work B Providing additional 1x20MVA, 110/33 11kV Power Transformer at 110/11kV ... Partial Turnkey Basis, ...
Combined Package for, Work-A) Replacement of 2x8MVA, 66/11kV Power Transformers by 2x20MVA, 66/11kV Power Transformers at 66/11kV K. Byrapura Sub-Station, in Channarayapatna Taluk, Hasan District. Work-B) Replacement of 2x8MVA, 66/11kV Power ... Partial Turnkey Basis, ...
Construction of 220kV Outdoor GIS line Bay at existing 220/66/11kV Chikkanagara Sub-station and running of 220kV, 1000sqmm XLPE UG Cable (3 Runs) for a distance of 0.038kms from 220kV Chikkanagara Sub-station in Sakleshpura Taluk, Hassan District ... Total Turnkey Basis, ...
Combined Package for Work-A Providing Additional 1 x 20 MVA Power Tr. at 110/11kV Tangali S/S, Work-B Replacement of 2x10MVA, 110/11kV Power Tr by 2x20MVA, 110/11kV Power Tr at 110/11kV Singatagere S/S, Work-C Replacement of 2x10MVA, 110/11kV Power ... Partial Turnkey Basis ...
Re-routing of existing 66kV, 1000Sqmm EHV UG Cables running from 220/66/11kV Puttenahalli receiving station to 66/11kV Hinduja sub-station and 66kV 1000Sqmm EHV UG Cables running from 220/66/11kV Puttenahalli receiving station to 66/11kV BDA ... Partial Turnkey Basis.
1Strenghening of 220 kV Vasanthanarasapura - Antharasanahalli DC Line from Moose ACSR to igh Performance Conductor (HPC) in existing corridor for a distance of 18.5 Km in Tumakuru Taluka and District.2. Modification works to existing 220 kV ... Total Turnkey Basis ...
Part-A- (a) Construction of SC transmission line using Single side/double side cross arm Monopoles from existing 400/220kV Vasanthanarasapura PGCIL sub-station to Entry point of Vasanthanarasapura Industrial Area (Proposed 220kV CTT location). (b) ... Total Turnkey Basis
Combined Package for Work A Establishing 2x20 MVA, 66/11KV Sub-station at Kulagere and construction of proposed 66kV LILO line on 110KV DC Narrow Based Towers with Coyote conductor from the existing 66kV K.Honalgere-Iggaluru SC line to proposed ... Partial Turnkey basis ...
Combined Package (Package IX) -Work A- Providing additional 1X20 MVA , 110/33 kV Transformer at 110 kV Madavu Sub Station in Puttur Taluka , Dakshina Kannada District.Work-B Providing additional 1X20 MVA , 110/33 kV Transformer at 110 kV Jeepu Sub ... Partial Turnkey Basis,Percentage ...
Combined Package for, Work-A) Augmentation of 1x8MVA, 66/11kV Power Transformer-1 by 1x20 MVA, 66/11kV Power Transformer at 66/11KV Kempanahalli Sub-Station, Kunigal Taluk, Tumakuru District. Work-B) Augmentation of 1x12.5MVA 66/11kV Power ... Total Turnkey Basis, ...
Providing hot water facility to the Government Post Matric Boys Hostels in Harapanahalli Taluk by installing 1000 Ltr capacity hot water storage tank at Government Post Matric Boys BCWD 477 1000 Ltr capacity hot water storage tank at Government Post ... Tank Turnkey basis
Construction of Lift Irrigation Scheme to fill Tanks in Hadya and other villages under Varuna constituency in Nanjanagudu taluk of Mysuru District including Detailed Investigation & Conducting Survey, Design and Construction of Civil Works such as ... on Turnkey basis.
Combined Package for, Work-A Augmentation of 2x10MVA, 110/33-11kV Power Transformers by 2x20 MVA, 110/33-11kV Power Transformer at 110/11 kV Hunaseghatta Sub-Station in Tiptur Taluk, Tumakuru District. Work-B Providing additional 1x10MVA, 110/33-11kV ... Partial Turnkey Basis, ...
FILLING UP WATER BODIES (16 TANKS) OF JAVANAGONDANAHALLI HOBLI AND GAYATHRI RESERVOIR FOR DRINKING WATER PURPOSE AND GROUND WATER DEVELOPMENT IN HIRIYUR TALUK OF CHITRADURGA DISTRICT including Detailed Investigation & Conducting Survey, Design and ... on Turnkey basis.
Combined package for Work A Establishing of 2X20 MVA, 66/11 kV Sub-Station at Yarappanahalli along with Running of 66kV, 1000sqmm S/C UG Cable from existing 220/66/11kV Devanahalli Hardware Park (KIADB) S/S to proposed 66/11kV Yarappanahalli S/s for ... Partial TurnKey basis ...
Supply, installation, testing, commissioning, replacement and retrofitting of 10 Nos. 150HP/110 kW, 415 V, 3 phase, 50Hz fully automatic soft starter units for cooling water pump with over current, short circuit, phase loss, phase reversal, locked ... on turnkey basis ...
Combined Package for, Work-A (GEC-Ph II)-Construction of 220kV LILO line to 220kV Athani Sub-station from the existing 2nd circuit of 220kV Mahalingapura-Kudachi DC line for a distance of 25.535km, partially in the existing 110kV DC line corridor ... Total Turnkey Basis, ...
Supply, installation, testing, commissioning, replacement and retrofitting of 04 Nos. 25HP, 415 V, 3 phase, 50Hz fully automatic soft starter units for Governor oil pump motors with over current, short circuit, phase loss, phase reversal, locked ... on turnkey basis ...
Combined Package for, Work-A Augmentation of 1x20 MVA, 66/11 kV Power Transformer-3 by 1x31.5 MVA, 66/11 kV Power Transformer at 66/11kV Electronic city phase-2, sector-2 (Malgudi) Sub-Station in Bengaluru South Taluk, Bengaluru Urban District. ... Partial Turnkey Basis, ...