Loading…
Loading…
418 results • Best match
Design, Detailed Engineering, Manufacture and Supply of 10.75 Kms of 110kV, 1x630 sq.mm Aluminium XLPE UG cable and accessories, Laying of cable, Erection of joints, testing and commissioning for Manamadurai Traction SS under total Turnkey basis
Establishment of 400/230kV AIS SS with 2Nos. 400kVBays,4Nos. 230kV FeederBays, 2x500MVA,400/230kV Auto Transformers,Kiosk Buildings allied Civil works at Ariyalur 765/400kV AIS SS,Kallakurichi EDC,Villupuram operation circle on Total Turnkey Basis.
Supply & Installation of SAP Certified Hardware, Upgradation of SAP S/4 HANA 1809 to 2025 version, Migration of existing SAP System, on turnkey basis, including Post-implementation Hardware & Software Support, at Integral Coach Factory, Chennai - 600 038
Design, Detailed Engineering, Manufacture and Supply of 6.5 Kms of 110kV, 1x630 sq.mm Aluminium XLPE UG cable and accessories, Laying of cable, Erection of joints etc., testing and commissioning for Palani Traction SS under total Turnkey basis
LILO Keeramangalam-Sethubavachatram 110KV line connecting to Nagudy 110KVSS, 110 KV SC line on DC tower from Vellalaviduthi SS to Malaiyur 110KV SS, LILO of Gandharvakottai -Karambakudi 110KV feeder to the proposed Vellalaviduthi 400KV SS on Turnkey.
Erection, testing and commissioning of 230 kV MC Line towers with ACSR Zebra Conductor from Ariyalur 765/400/230 kV SS to Sankarapuram 230/110 kV SS including supply of all materials, under total turnkey contract basis.
SUPPLY AND INSTALLATION OF INTERIOR FURNISHING OF ONE RAKE OF 3 CAR FORMATION OFFICE ON WHEELS (OFFICE CUM MEETING CAR + CAR 1 + CAR 2) - LHB PLATFORM ON TURNKEY BASIS AS PER SPEC. ICF/MD/SPEC-410, IS
Supply & Installation of SAP Certified Hardware, Upgradation of SAP S/4 HANA 1809 to 2025 version, Migration of existing SAP System, on turnkey basis, including Post-implementation Hardware & Software Support, at Integral Coach Factory, Chennai - 600 038
ESTABLISHMENT OF BEGAPALLY 110/11KV AIS SS WITH 2X16MVA POWER TRANSFORMERS AND INTRODUCTION OF 110/11KV RATIO WITH 2X10MVA POWER TRANSFORMER AT PANNESWARAMADAM 110/33KV SS IN THIRUVALAM OPERATION CIRCLE IN KRISHNAGIRI EDC ON TOTAL TURNKEY BASIS
Operation, maintenance and monitoring of construction power supply of ETPS Expansion Project for a period of Six months (180 days) or up to the date of Handing over of site to the EPC contractor or up to dismantling/clearing of construction power
C/o additional infrastructure at NIT trichy, tamilnadu. SH 1: C/o Laboratory annex building for civil engineering department (G PLUS 2) including separate structural laboratory building of height 14m SH 2: C/o additional expansion of ICE department ... on EPC Contract basis.
Supply erection testing and commissioning of new 33KV source line and 11 KV link lines for newly proposed Chinnakulathupalayam 33 11 KV SS in Karur EDC in Karur Region on total turnkey basis through e tendering under RDSS scheme
Supply and erection of 14.7 Kms of 230 KV XLPE 1X1200 SQ.MM , XLPE Al.UG cable from 230 KVGuindy GIS SS to proposed 230KVKK Nagar GIS SS for a route length of 4.9 Km under total Turnkey in Chennai Region.
SUPPLY AND INSTALLATION, COMMISSIONING AND TESTING OF MV PANEL,150 KVAR CAPACITOR AND SUPPLY AND LAYING OF UG CABLES, CEILING FAN, EXHAUST FAN AND STREET LIGHTING LED/TUBE, LIGHT FITTING LED ECT. IN AKKUR MRM IN MAYILADUTHURAI DT ON TURNKEY BASIS
Design, Engineering, Supply, Erection, Testing and Commissioning of remaining portion of HT and LT switchgears with HT cables and LT Power and Control cables as a part of the ongoing turnkey project for Complete revamping of fire affected Units I an
Manufacture, supply of materilas, erection of towers, stringing of panther conductor and OPGW and commissioning of 110 KV DC line by making LILO of the existing 110 KV Pugalur - Karur feeder at the Pavithram 110 KV SS under turnkey contract
DesignDetailed EnggManufacture Supply, ETC of 230/110KVDigital AIS SS with ICTs, Switchgears,CP,SAS, Control Room,Civil Works in the premises of existing Poolavady 110KV SS in CBE Region on Total Turnkey basis PkgIV of MNRE,KfW funding GECII Project.
JICA Package-55-Design, Detailed Engineering, Manufacture and Supply of 12.0 Kms of 110KV,1x630sqmm XLPE Al.UGcable and its accessories from Kadapperi 230 KV SS to Kadapperi 110 KV SS for a route length of 4.0 kms under total Turnkey
Permanent Rectification of Black Spot TN-02-384, TN-03-253, TN-03-254 by Constructing 3 VUPs at Km.64.920, Km.78.379 and Km.80.684 and Service Roads Km 88 on both sides Kumarapalayam Chengapalli Section of NH544 in the State of Tamil Nadu on EPC
Permanent Rectification of Black Spot TN-(02)-468 TN-(02)-216 by construction of VUP at Km.177/880 (Pannapatty Jn) along with Service Road in the project of Krishnagiri Thumbipadi section of NH-44 (Old No NH68) in the state of Tamil Nadu on EPC
AE services for 4laning of left over works including Additional Structures in KL-TN Border Kanyakumari from Km.43.000 to Km.96.714 of NH47 in TN on EPC and O-M Period for Nagercoil to Kavalkinaru Sec from Km.0.000 to Km.16.276 of NH47B in TN
TurnKey Works Contract for Provision of 14 Nos of Maintenance Free Earthing New Electrode with interlinkng in 110 KV Yard, 11KV yard and 33 KV Yard in each Yard at Kanchipuram 110 KV SS in respect of North Kanchipuram Division in KEDC
Supply Laying jointing teriminating testing and commissioning of 33 KV 1X630 sqmm Aluminium XLPE Cable from Mepz 110 KV SSfrom Pallikaranai 110KV SS to the proposed 33 11 kV indoor SS at Hasthinapuram and 11 KV 3X300 sqmm XLPE UGCable under Turnkey
Formation of New Six lane road from Thiruvallur Bypass Design Chainage Ch 47800 to Vengathur Design Chainage Ch 58200 with paved shoulders and two lane service road on both sides in Section III of Chennai Peripheral Ring Road Project EPC03
Up gradation of existing 40 MT capacity ELWB to 60 MT ELWB by SITC of fully electronic computerized pit less Shallow type LWB of 60 MT capacity including CiviI Electrical works on turnkey basis under buy back scheme at FSD Arakkonam under DO Vellore
Up gradation of existing 40 MT capacity ELWB to 60 MT ELWB by SITC of fully electronic computerized pit less Shallow type LWB of 60 MT capacity including CiviI Electrical works on turnkey basis under buy back scheme at FSD Sevur under DO Vellore
Up gradation of existing 40 MT capacity ELWB to 60 MT ELWB by SITC of fully electronic Computerized pit less Shallow type LWB of 60 MT capacity including CiviI Electrical works on turnkey basis under buy back scheme at FSD TV KOIL under DO Cuddalore
Permanent Rectification of Blackspot ID TN(02)15 at Km 16.89 Vanagaram Jn by Construction of 6L VUP, TP at Km. 6.50, Entry-Exit Ramp Km 5.20-5.70, Causeway at Km 19.00, FOB at Km 21.80 and Improvements to Surapattu TP at Km. 28.50 in CBP in TN on EPC
Design,Detailed Engg,Supply,ETC of 230/110kV AIS SS with ICTs, swtgrs, CRP,SAS,CtrlRoom,Civil Works at Kongalnagaram and Provision of 1no 230kV Bay at exg Anaikadavu 400kV AIS SS on Total Turnkey Basis under Pkg 8 of GEC2 funded by MNRE and KFW
Setting Up of 6 Bed Intensive Care Unit (5 Intensive Care Unit (ICU) beds 1 Pediatric Intensive Care Unit(PICU) beds) and Setting Up of 12 bed Pediatric Care Unit ( 2 PICU beds 4 High Dependency Unit Beds (HDU) 6 Oxygen Beds) on Turnkey Basis at GH Z
Supply, Installation, Testing and Commissioning of FTTH based Wi-Fi System on turnkey basis
Hospitality Expdr on POP Events scheduled in May 2021 at OTA, Chennai (Turnkey Proj).
Establishment of 765/400KV AIS SS at Virudhunagar in Tirunelveli Region under total turnkey basis
Set of dowel pins as per Specification IS 2507, Hardness 38 to 43 HRC , set consists of 4 items as given below 1. Dowel pin of size 2.5 x 20 mm for EPC - 01 No/set, 2. Dowel pin of size 3 x 25mm for EPC - 01 No/set 3. Dowel pin of size 3 x 35mm for reverser/ CTF - 01 No/set, 4. Dowel pin of size 5 x 35mm for reverser/ CTF - 01 No/set Note: 1. Two sets sample to be got approved before effecting bulk supply. 2. Supply by SOURCES as per CLW Item ID: 2100630 in IREPS Vendor Directory. 3) Necessary test certificate complying with material specification from Cent. Govt/NABL/ ILAC accredited labs to be submitted.
CECRI13082024MLP-8819-DRY ROOM(CONTROLLED ATMOSPHERE FACILITY LESS THAN 10 PERCENT RH) ON TURNKEY BASIS. See Chapter 4.2
SUPPLY, INSTALLATION, TESTING, COMMISSIONING, TRAINING FOR THE PROCUREMENT OF ISO 7 MODULAR CLEAN ROOM ON TURNKEY BASIS SEE CHAPTER 4.2
Constructuin of 100 Bedded ESIC Hospital Building (1 basement plus Ground plus 2 floors) Service Buildings (Mortuary building, canteen building, MEP services building and Gas manifold building) and 32 Nos Residential quarters (Type-II 16 Nos, Type ... on EPC mode and ...
Design, construction, supply, installation, erection and commissioning of expansion work of Effluent Treatment plant with zero liquid discharge plant with OCEMS TURNKEY
Construction of Control room building and other related civil works for the establishment of new Chinnakulathupalayam 33 11 KV Substation on turnkey basis
Construction of control room and other civil works for the proposed Kambiliyampatty 33/11 KV SS in Palladam EDC on total turnkey basis
Construction of control room and other allied civil works for the proposed Anaipalayam 33/11 KV SS in Tirupur EDC on total turnkey basis.
Construction of control room and allied civil works for the proposed Kavilipalayam 33/11 KV Indoor SS in Tirupur EDC on total turnkey basis.
Supply, Installation and Commissioning of 1 No. of 100 MT fully Electronic Lorry Weighbridge on Turnkey contract basis at Alangulam Cement Works, Virudhunagar District
Procurement and Installation of Ozone Vegetable Washing Plant of OTA, Chennai out of I and M Grant for the FY 2020-21 Turnkey Proj
Construction of control room and other allied civil works for the proposed Kathankanni 33/11 KV SS in Palladam EDC on total turnkey basis.
Construction of control room and other civil works for the proposed Mangalam 33/11 KV SS at Pudupalayam in Tirupur EDC on total turnkey basis.
Providing technical assistance to the field Engineers for various activities related to the execution of EPC civil package II project components for a period of one year from the date to utilization
STORAGE TANK AND ASSOCIATED EQUIPMENT WORKS INCLUDING DESIGN,DETAIL ENGG,SUPPLY,FABRICATION,ERECTION, TESTING,CALIBRATION,PAINTING,INSULATION,ETC.FOR MECHANICAL WORKS PKG(EPC) FOR SETTING UP GRASSROOT LUBE COMPLEX AT VILLAGES AMULLAIVOYAL,VAIKKADU
PROCESS PLANT EQUIPMENT AND UTILITY PACKAGES INCLUDING DESIGN, DETAIL ENGINEERING, SUPPLY, INSTALLATION, PAINING, INSULATION ETC. FOR MECHANICAL WORKS PACKAGE (EPC) FOR SETTING UP OF GRASSROOT LUBE COMPLEX AT VILLAGES AMULLAVOYAL AND VAIKKADU,CHENNAI
Construction of 1410 tenements using Pre Fabricated Concrete Technology on Lump-Sum Turnkey Design and Build basis including all services such as Internal and External water supply, sanitary, electrification and development works