work of replacement of dilapidated AB cable/ dilapidated wire/ installation of pole/ additional circuit on the LT line in the area of EDD Muradnagar on semi-turnkey basis.
WORK OF bifurcation of 11 KV overload feeder and strengthening of LT Line in the area of EDC Etah under Business Plan 2024-25 on Semi Turnkey basis.
Selection of an Agency for end to end successful Conceptualizing Designing Fabrication Setting up and Display of Tableau on Turnkey Basis during Republic Day Parade 2022 at Lucknow
Quantum of work involved in Shifting of Existing Diff. Lines at Auras to Mohan Marg, Unnao due to road the area of EDD-V, Hasanganj, Unnao. (Turnkey basis).
CONSTRUCTION OF ADDITIONAL 5MVA FOR 33/11KV SUBSTATION SUITHAKALA, BUDHUPUR JAUNPUR AND CONSTRUCTION OF 11KV LINE FROM 33/11KV SUBSATATION SUITHAKALA, BUDHUPUR, DISTT. JAUNPUR ON SEMI TURNKEY BASIS.
EXECUTION WORK FOR SHIFTING OF LINE AT VILLAGE rakauli and bankata ROAD UNDER EDSD KHAJINI ON SEMI TURNKEY BASIS IN DEPOSIT HEAD UNDER ELECTRICITY DISTRIBUTION DIVISION SIKRIGANJ, GORAKHPUR
Construction of proposed 2x5 MVA 33-11 KV Sub-Station New Pagal Baba and Associated 33 KV and 11 KV Line in District, Mathura on Semi Turnkey Basis.
CONSTRUCTION OF ADDITIONAL 5MVA FOR 33/11KV SUBSTATION NEWADIYA, LEDUKA (MACHHALIGAW), JAUNPUR AND CONSTRUCTION OF 11KV LINE FROM 33/11KV SUBSATATION LEDUKA, DISTT. JAUNPUR ON SEMI TURNKEY BASIS.
CONSTRUCTION OF ADDITION 5MVA FOR 33/11KV SUBSTATION NANDGANJ AND SAIDPUR RURAL GHAZIPUR. CONSTRUCTION OF 11KV LINE FROM 33/11KV SUBSATATION NANDGANJ, DISTT. GHAZIPUR ON SEMI TURNKEY BASIS
CONSTRUCTION OF ADDITIONAL 5MVA FOR 33/11KV SUBSTATION SURERI, RAMPUR, JAUNPUR AND CONSTRUCTION OF 11KV LINE FROM 33/11KV SUBSATATION SURERI, RAMPUR, DISTT. JAUNPUR ON SEMI TURNKEY BASIS.
EXECUTION WORK FOR SHIFTING OF LINE AT VILLAGE BASGAON TO BHITAULI AND VISHUNPUR TO SINGHA ON SEMI TURNKEY BASIS IN DEPOSIT HEAD UNDER ELECTRICITY DISTRIBUTION DIVISION KAURIRAM, GORAKHPUR
supply and installation of Automatic Boom barrier gate on turnkey basis with ultra-high Frequency UHF Reader Range 10-12 meter & 250 UHF Tags. as per Annexure-A
Work of Construction of 33/11KV Sub-stations 33KV Lines and 11KV Feeders on semi turnkey basis at Sarai Agahatpur in District Etah under DDUGJY a GOI Scheme
Work of Construction of 33/11KV Sub-stations 33KV Lines and 11KV Feeders on semi turnkey basis at Korah Rustampur in District Aligarh under DDUGJY a GOI Scheme
Work of Construction of 33/11KV Sub-station, 33KV Line and 11KV Feeder on turnkey basis at Parikrama Marg Khoi in District Chitrakhoi under DDUGJY a GOI Scheme
Construction of New 33/11 kv Sub Station 33 kv 11 kv lines on Semi Turnkey basis at Sadu Ashram Atroli District Aligarh under DDUGJY a GOI Scheme
Shifting of Electrical Utilities of 11 KV Line, 0.4 KV O.H. Line and Distribution T/F at Kanpur Panki Nahar from Brij Mohan Hospital under EUDD- Ratanpur Kesco., Kanpur. (Semi-Turn-key).
Replacement of existing ACSR Panther Conductor of 132KV lines with HTLS Conductor (Except GAP type) including Design manufacturing testing supply of HTLS Conductor along with suitable Hardwares Accessories on Turn-Key basis
work for installation of additional 400 KVA Distribution Transformer in District Jail, Aligarh against package No. 73_2025-26 sanctioned in Deposit Head on Semi Turn-key Basis under the area EUDC, Aligarh
Construction of 33 KV Under Ground Line to Homi Bhabha Cancer Hospital Lahartara , Varanasi From 132 KV Sub Station Manduadih, Varanasi, on Turn-Key Basis. under full deposit scheme year-2017-18
Conversion of Overhead L.T.Line and associated Electrical Power Distribution System into Underground Electrical Power Distribution System on Turn-key Basis in Distt.-Mathura town under EUDD-III, Mathura of U.P. under DVVNL
Construction of GST Building 2 Basement G 7 Floors Composite Structure on EPC Basis at Kamal Nehru Nagar Near Hapur Chungi Ghaziabad UP SH Civil Works i/c internal water supply and sanitary installations sanitary installations sewerage system drainage and development of site electrical work i/c internal and external electrical installations sub station DG sets fire fighting system automatic fore alarm and PA system lifts air-conditioning mechanical ventilation and smoke extraction system BMS IP based EPABX System LAN system UPS Solar PV Power plant access control system water supply system STP CCTV external development works including CC pavement Horticulture works and other misc works SW Minor repair Civil Work CGST Building at Kamal Nehru Nagar Ghaziabad dg 2025 26
Line Shifting, Right of way etc. (Asut-Mirzapur-Mahul-Belwai Marg)
Construction of Single Circuit 33 KV U/G Line in between 132 KV Gomti Nagar to VibhutiKhand and assoicated work On Semi turnkey basis Under Business Plan 2024-25.
EXECUTION OF WORK FOR SYSTEM AUGMENTATION/STRENGTHENING (ON SEMI TURNKEY BASIS) IN THE AREA OF ELECTRICITY DISTRIBUTION DIVISION-SIKARIGANJ, GORAKHPUR AGAINST ADDITIONAL BUSINESS PLAN SCHEME 2024-25 (PHASE-2)
Shifting work of 11 KV, LT lines and transformers in village Udayadih-Prithviganj road under Electricity Distribution Division, Pratapgarh on semi turnkey basis including loading and unloading of material.
For Release New Electricity Connection to Principal, Lala Lajpat Rai Smarak Medical College for Oxygen Plant, Under Deposit Scheme on the Basis of Semi Turnkey, Under EUDD-II, Meerut.
Construction work of new LT Line at 13 places under the area of EDD-I/II/III/IV Ballia on semi-turnkey basis (under Additional Business Plan 2023-24 )
Execution of work SUCH AS PROTECTION OF L.T. EQUIPMENT for DISTRIBUTION TRANSFORMER (on semi turnkey basis) under Business Plan 2024-25 in areas under Electricity Distribution Distribution-II, Gorakhpur
EXECUTION OF WORK FOR SYSTEM AUGMENTATION/STRENGTHENING (ON SEMI TURNKEY BASIS) IN THE AREA OF ELECTRICITY DISTRIBUTION DIVISION-KAURIRAM, GORAKHPUR AGAINST ADDITIONAL BUSINESS PLAN SCHEME 2024-25 (PHASE-2)
Construction of Multispecialty Emergency Centre and new hospital block in the old and new premises of Dr Ram Manohar Lohia Institute of Medical Sciences Gomti Nagar Lucknow Turnkey Basis
Work of increasing capacity of distribution transformers and installation work of new distribution transformers on Semi-Turnkey basis in Business Plan 2025-26 under the area of EDC, Agra
Chain Linked Fencing outside the Periphery of Forest Of Dhaurahra North Nighasan and Mailani Ranges of North Kheri Buffer Zone Division Dudhwa Tiger Reserve Lakhimpur Kheri On Turnkey Basis
Electrification work to be done for issuing electricity connection in full deposit scheme under Electricity Distribution Division-I, Pratapgarh on semi turnkey basis including loading and unloading of material.
Increase the ground clearance of 33 Kv line by replacing existing PCC pole near Mile Stone 224/ 425 on NH-31 Sarai Dingur distt. Jaunpur on semi turnkey basis
SUPPLY AND ERECTION PRICES OF MATERIALS FOR CONSTRUCTION OF 33/11 KV S/S PUREHIRAWAN AND ASSOCIATED 33 KV AND 11 KV LINK LINE PRATAPGARH ON SEMI TURNKEY BASIS
for the work of Installation of new/additional distribution transformers on semi turnkey basis (business Plan 2024-25) under the electricity distribution division Firozabad, Shikohabad, Jasrana, Sirsaganj and Tundla.
Work of Construction and bifurcation of 33 KV Lines at 2 places under the area of EDD-I/II Ballia on semi-turnkey basis (under 20 crore work plan)
For the work of Maintenance nd repair, Calibration and NABL Accreditation on Turnkey basis of Automatic Meter Test Lab situated at Chief Engineer (Dist) Office, Gailna Road, DVVNL Agra
Supply of Materials and Erection for Construction of 132 KV S/S Handiya to 33 KV line Baraut Distt.-Prayagraj in Business Plan 2024-25 on Semi Turnkey Basis
EXECUTION WORK FOR SHIFTING OF LINE AT VILLAGE BHISHA BAZAR TO MALHANPAR ROAD UNDER EDSD KHAJINI ON SEMI TURNKEY BASIS IN DEPOSIT HEAD UNDER ELECTRICITY DISTRIBUTION DIVISION SIKRIGANJ, GORAKHPUR
CONSTRUCTION OF ADDITION 5MVA FOR 33/11KV SUBSTATION BAJARANG NAGAR, MURTAZABAD, DOBHI JAUNPUR AND CONSTRUCTION OF 11KV LINE FROM 33/11KV SUBSATATION DOBHI, DISTT. JAUNPUR ON SEMI TURNKEY BASIS
Construction of 2x5 MVA 33 and 11 KV Sub-station and associated 33 and 11 KV lines of Defence Corridor in District Aligarh on Turnkey basis Under Deposit Scheme.
SUPPLY OF MATERIALS AND ERECTION FOR CONSTRUCTION OF 33 KV INDEPENDENT LINE FROM 132 KV S/S BHUPIYAMAU TO DISTRICT HOSPITAL, PRATAPGARH UNDER DEPOSIT SCHEME ON FULL TURNKEY BASIS
Supply, Installation, Testing , Commissioning and Proving out of Static Type, Pit-less , Digital, Electronic, Road Weighbridge of 50 MTs capacity, to be installed on turnkey basis [ including all Civi
SUPPLY AND ERECTION PRICES OF MATERIALS FOR INCREASING CAPACITY OF 33/11 KV S/S SITHAURA AND CONSTRUCTION OF 11 KV LINE DISTT. FATEHPUR WORK ON SEMI TURNKEY BASIS
Work of Construction of 33/11KV Sub-stations, 33KV Lines and 11KV Feeders on semi turnkey basis at Udetpur Bithur in District Kanpur Nagar under DDUGJY a GOI Scheme
Work of Construction of 33/11KV Sub-stations 33KV Lines and 11KV Feeders on semi turnkey basis at Murlipur Patari in District Kanpur Nagar under DDUGJY a GOI Scheme
Engineering Procurement Construction EPC inclusive of One 1 Year Comprehensive Operation Maintenance (OM) of 10.0 KWp OnGrid Roof Mounted Captive Solar Power Project at Pragnarain Mook Badhir School, Aligarh, Dist Aligarh Uttar Pradesh
Supervision by Authority Engineer for Construction on EPC Engineering Procurement and Design mode of 300 bedded Advance Pediatric Centre Phase 1 of 500 bedded Advance Pediatric Centre in SGPGI Campus in Lucknow UP