Loading…
Loading…
4,363 results • Latest
Construction/Development and beautification of Mini Park at Ward No.21,Baripada ( grand Goli)
Re-Development of existing Kalyan Mandap near Hamilton school in Ward No.28, Palbani
Renovation of Municipal Guest house near Chhau Padia, Baripada
Development of Madhuban Smart Park in Ward No.9
Conservation of Rejuvenation and Development of the 100 years old Historic Gandhi Park in corporating Gandhian Ethics at Ward No.5, Baripada
Construction/Development and beautification of Bijayramchandrapur Park in Ward No.17
Re-Development of existing Kalyan Mandap near TPNODL Office, Baghra road in Ward No.16
Development of existing Smart Crematorium at Raghunathpur in Ward No.22 under Baripada Municipality.
Construction of Kitchen-cum-Ananda Bazar for Lord Jagannath temple at Baripada.
Construction of Entrance gate at Palbani, Ward No.25 under Baripada Municipality
APPOINTMENT OF PROOF ENGINEERING CONSULTANT (PEC) for Execution of Underground Pipeline (UGPL) Irrigation System in Pressurised and Gravity flow in the Area of Khairibhandan Irrigation Project, Jashipur, Dist-Mayurbhanj covering distribution network
Household Insecticides (V2) (Q3), Mosquito Repellent (V2) (Q4) Broom (V5) (Q4), Toilet Soap, Liquid (V3) Conforming to IS 4199 (Q4) Cleaner, Liquid (V3) conforming to IS 8540 (Q3) Toilet Cleaner Liquid (V3) conforming to IS 7983 (Q4) Compound based Surface Cleaner (liquid) (V2) conforming to IS 14364 (Q4) Naphthalene (V3) Conforming to IS 539 (Q3), Toilet Brush (V3) (Q4)
Construction of 100 Seated Girls and Boys Hostel G plus 1 at Govt. ITI Patnagarh, Balangir, Odisha
Construction of AddI. Mission Sakti Bhaban Building at Dhauragotha under DMF in the District of Anugola for the year 2026-27
Construction of AddI. Mission Sakti Bhaban Building at Baradhip under DMF in the District of Anugola for the year 2026-27
Construction of Sub Center Building at Badgovindapur under Kishorenagar Block for the year 2026-27
Construction of AddI. Mission Sakti Bhaban Building at Dhundi under DMF in the District of Anugola for the year 2026-27
Construction of AddI. Mission Sakti Bhaban Building at Arjunadhara under DMF in the District of Anugola for the year 2026-27
Construction of AddI. Mission Sakti Bhaban Building at Solanda under DMF in the District of Anugola for the year 2026-27
Construction of AddI. Mission Sakti Bhaban Building at Baninali under DMF in the District of Anugola for the year 2026-27
Construction of AddI. Mission Sakti Bhaban Building at Anandamunda under DMF in the District of Anugola for the year 2026-27
Construction of AddI. Mission Sakti Bhaban Building at Rajanipal under DMF in the District of Anugola for the year 2026-27
Construction of Go-down of Rice Processing unit and shed at Kandhamal district under project EAP-391, Kandhamal, Odisha. SH: Soil Investigation.
FOREST CLEARANCE WORK FOR AN AREA OF APPROX. 90 Ha OF LAND PROPOSED FOR CONSTRUCTION OF 400KV Quad Moose DC Line from Jeypore GSS, PGCIL to proposed 400KV Theruvali GSS.
Construction of 100 Seated Girls and Boys Hostel G plus 1 at Govt. ITI Bijepur, Bargarh, Odisha
Repair and Renovation of ANMTC Building such as Roof Top Blue scope shed work at DHH, Baripada in the District of Mayurbhanj for the year 2026-27.
Shifting of lines and S/s near by safety place due to const. and maintenance of road such as R and B road Sai Temple to Chatortota via Kairpur, Dharapur, Raghunathpur Nagar Usuma Under R.W.E.S Kataka.
Provision of On-Grid Roof top Solar Photovoltaic System at O/o the Superintending Engineer, RW Electrical Circle Bhubaneswar Under R.W.E.S Bhubaneswar.
E.I to Provision of fittings and SITC of Lift to Kendrapara-Jajpur Circle office Building at Chandikhole for the year 2026-27_building
Cleaning and Desludging of existing sewerage system of K-1, K-2, K-3(B), K-8 at Kalinga Nagar and Ghatikia Village for the period of 2 years (24 months) under WATCO Section Ghatikia, Bhubaneswar City
Operation and Maintenance of existing sewerage system of different areas under WATCO Section Nayapalli, Bhubaneswar City in Ward No.37, 38 and 39 of BMC
Operation and Maint. of existing S/S in Niladrivihar areas (GA Plot, Lumbinivihar, GA Defence Colony, Aryavihar, Vigilance Colony, Pragati Enclave and Prachi enclave, District Center and Sector-1 to Sector-5, Gopabandhu Basti of Ward No.8(P) and 14
Cleaning and Desludging of existing sewerage system of the areas K-4, K-6A, K-6B,K-7 and K-3A for the period of 2 year (24 months) of Ward No.23 under WATCO Section, Kalinga Nagar, Bhubaneswar City
Provision of On-Grid Roof top Solar Photovoltaic System at RW Electrical, Mechanical, PH Division, Bhubaneswar Under R.W.E.S Bhubaneswar.
Shifting and Reconstruction of LT/HT line, Sub Station due to const. of road and CD works under PMGSY-III Road-B MRL-1/8 Brahmanbati to Tandikana Bridge Chhaka via Sanamulei, Kaliagarh, Saptafeni Gada Under R.W.E.S Kataka.
Provision of FACADE Lighting at EIC RW Office ,Bhubaneswar for the year 2026-27_building
Operation and Maint. of existing s/s of N1, N2, N3, N4, N5 and N6 area including G.A Deptt. Govt. Quarters Near CRPF Square, B and C -Zone and Trunk sewer line from CRPF Square to Jayadev vihar under WATCO Section IRC Village, Bhubaneswar City
Modified Elastomeric Pad Design-B for Container and Covered Wagons.
Hiring of Excavator rock breaker at NTPC TTPS Stage 3
Construction of Cross Regulator at RD 44820m of Jambhira Left Main Canal
Construction of Cross Regulator at RD 32000m of Jambhira Left Main Canal
Slope protection of Amarda Distributary from RD 300m to RD 1200m.