Loading…
Loading…
4,857 results • Latest
Comprehensive Environmental Audit of all the Operational Mines of OMC.
Electrification of Microbiology Net house at ICAR-CRRI, Cuttack-6
Set of step size racers for axle boxes bearing CRU-150 of 3 phase locomotives as per RDSO SMI No.RDSO/2007/EL/SMI/0246 (Rev-2) Dt:15.01.2018 or latest. Each set consisting of 04 items 04 nos. as follows:- (1) Plain inner racer RB 5080D to NEI Drg. No.- PESD-6179 or Plain inner racer to FAG drg No.EDD F-626506- 3001.IR.NJP.000, Qty.= 01 No., (2) Lipped inner racer RB 5080D to NEI Drg. No.- PESD-6179 or Lipped inner racer to FAG drg No.EDD F-626506-3101.IR.NJ.000, Qty.= 01 No., (3) Angle ring to NEI Drg. No.- PESD-6179 or angle ring (Loose lip) to FAG Drg No-EDD F-626506.BO.NUP 000 , Qty.= 01 No., (4) End Cap to NEI Drg. No.- X-202 Part No.-5 or END cap to FAG drg No.EDD 901-32A-24 000, Qty.= 01 No.
Up-Gradation of PHC (N) Andra under Ama Hospital Building initiative of Pattamundai Block for the year-2024-25
4 pole Contactor for Net 1 & 2, Rated voltage : 1000V AC, Rated KVA : 100 at rated voltage & 70 deg. C and utilization category : 6A. Aux. contact : 2NO + 2NC, Control Voltage : 415V AC with surge suppressor.
Construction of Transformer Foundation.
Selection and Appointment of Transport Contractors for Transportation of Paddy from Paddy Purchase Centers (PPCs) Mandis to Rice Mill points for Unit-Rairangpur , Jamda Block
Construction of Bubel NHS Building at Bubel under Puintala Block in the district of Boalngir for the year 2025-26
Construction ofCompound Wall inside Smart Park in Ward No-9