Removal of deposited earth in Distry. and minor canal of Dhuty LBC, of Roshana Distry. ch. 0 to 225, Amgaon minor ch. 0 to 104, Koudiatola sub minor ch. 0 to 65, Nevergaon minor ch. 90 to 125.5 Roshna minor ch. 0 to 85, Duglai sub minor ch. 0 to 20
Repair of Dhuty L.B.C. main canal, Rattapayali Disty. Bhalwa Disty, Lalutola minor, Kesha minor no. 02 and Khesa minor no. 03 of Dhuty L.B.C. System
Repair and maintenance work of bund of Nahlesara medium tank
Reconstruction of damaged sluice at ch. 07 of KAMTHEE minor tank
Opening and Closing of Gates 25 Nos Barrage gates under W.R. Sub Division Ashta.
PREMONSOON REPAIR AND MAINTENANCE WORK OF RADIAL GATE AND GANTRY CRANE OF BHAM MEDIUM PROJECT UNDER WR DIVISION KAHDWA.
PRE MONSOON MAINTENANCE WORK OF SLUICE GATES OF 43 NOS MINOR TANK UNDER W.R. DIVISION KHANDWA.
Supply of manpower at Angoori Barrage and Bhutan Barrage under Light Machinery AND EandM Sub Division Datia
Providing of manpower at Madikheda Dam
Repairing and maintenance of LBC 0 RD to 83170m of Rajghat canal
On Turnkey Basis Construction of Koylari Storage Tank Project, as per detailed scope of work but not limited to that
Opening and closing of stop dam Gate Shutter under Water Resources Sub Division Rajgarh
Opening and closing of stop dam Gate Shutter under Water Resources Sub Division Zeerapur
Providing Labour cum watchman of PBC Division Sohagpur.
Providing and Fabrication work of Tank Gates of size 1200mm x 1200mm-06 nos. for various WR Divisions
On Turnkey Basis Construction of Bhurkhal Khapa (MPIDC) Tank, as per detailed scope of work but not limited
Special repair of VRB at Rd 16450 m and Fall at Rd 6360 m. of Ajnai dy of Handiya Branch Canal
Providing and Fabrication work of Tank Gates of various size for various WR Divisions.
Environment and ecology clearance of Ranjit Sagar Complex Major Micro Irrigation Project from Ministry of Environment, Forest and Climate Change, Govt of India.
On Turnkey Basis Construction of Bheempura Tank (without Canal), as per detailed scope of work but not limited to that.
On Turnkey Basis Construction of Kherwan Barrage, as per detailed scope of work but not limited to that.
On Turnkey Basis Construction of Nayamalaheda Tank, as per detailed scope of work but not limited to that.
Reconstruction of sluice and repair work of dam and waste weir of Ratona Minor Irrigation Project.
On Turnkey Basis Construction work of Lutmara Weir Project, as per detailed scope of work but not limited to that
On Turnkey Basis Construction of Kaliya Kho Tank, as per detailed scope of work but not limited to that.
Providing, fabrication, supply and erection work of embedded parts with SS fittings and Cast Steel Rollers of gate size 1.40m x 1.40m - 11nos for Brahmangaon Barrage.
For Flood control construction of Dry Stone pitching work at R.D. from 201 m. to 650 m. of Kuda Tank.
Additional Protection work on Right Bank of Adanwara Stop Dam.
Pre-monsoon repair and maintenance of 7 No. vertical gate rope drum hoist type at Rehti medium project Distt. Vidisha
Repair and maintenance of Doraha medium project under Water Resources Sub Division Sehore
Repair Work of Head sluice gates of Ghogra Dam, Fundki tank and Amlapani Tank under Water Resources Sub Division Bhairunda
Repair and maintenance of Rampura Khurd medium project under Water Resources Sub Division Astha (Sehore)
Repair and maintenance of existing left bank and right bank main canal gates of Samrat Ashok Dam project (Halali Dam), Distt.- Vidisha
Repair and maintenance of sluice gates at Koncha pick-up weir, Ashok Nagar (M.P.).
Repair and maintenance of 41 No. head sluice gates of 22 minor and 3 medium tanks under W.R.D. Division Guna (M.P.).
Repair and maintenance of 55 No. head sluice gates of 32 minor and 2 medium tanks and 23 No. flood control gates at Chhajju Barkheda under W.R.D. Division Ashok Nagar (M.P.).
Repair and maintenance of radial gates, sluice gate, dam gallery and control room items of Gopi Krishna Sagar Dam, District Guna (M.P.)
Repair and maintenance of 41 No. sluice gates of 33 minor and 1 medium tanks and 23 No. auto tilting gates at Rajeev Sagar Dam under W.R.D. Division Raghogarh, District Guna (M.P.).
Construction of Guide wall for protection of Umariya Tank.
Opening and closing of stop dam Gate Shutter under Water Resources Sub Division Biaora
Maintenance work of Gwara Tank
Supply of stationary materials and abiyana forms in the office of the Executive Engineer, WR Division, Gohad during FY-2023-24
Pre Monsoon Repair and Maintenance of Sluice gates of minor tanks under water Resources sub division Shahpura Dist Dindori
Pre Monsoon Repair and Maintenance of Sluice gates of minor tanks under water Resources sub division Samnapur Dist Dindori
Servicing, oiling, greasing and wire rope compounding work of vertical lift gates, head sluice gates and 24 chain gates and other machineries/ equipment of Samrat Ashok Sagar Dam Project (Halali Dam) under pre-monsoon maintenance
Survey work for 03 barrages (Bheda, Madhadeori, Kathotiya) under Sub Division Rithi
Survey for Head work and Canal of Jamunhai Tank
Repair and maintenance of Dahod Dam waste weir gates medium project under Water Resources Sub Division Obedullahganj (Raisen)
Survey work for 04 Tanks (Bahvarha Nalla Jujhari Tank, Pathradi Ppariya Tank, Jamuniya Tank and Sjahri Tank) under Sub Division Bahoriband
Survey work for proposed 03 Barrage Under W.R. Sub Division Dheemarkheda (Thirri, Mathbhavana, Mudiya Purwa Barrage) and 01 (Umarghat Rajasalaya Barrage) under W.R.Sub Dn Bahoriband , Distt. Katni (M.P.)