Loading…
Loading…
1,419 results • Latest
Strengthening of Railnet/FOIS/CMS/TMS/ICMS/COA at Divisional officers' offices, Sub divisional officers offices, Crew Lobbies, Supervisor offices, workshop, depots, ROH, Loco sheds etc. to improve speed of internet & expand e-governance availability to Railway Officials over Jaipur division.
SCH A-Replacement of IPIS system at Bansberia, Tribeni, Jirat, Guptipara, (4 STN) in suburban sections over Howrah division. SCH B-Replacement of IPIS system at Adisaptagram, Pandooah, Memari, Shaktigarh (4 STN) in suburban sections over Howrah division.
Signalling work in connection with Re-girdering of (1) Br. No. 27 on up Main, Dn Main, Line No.7 and common Line in between station BNXR and DDJ in SDAH-DDJ Section, (2) Br No 7 on UP Main and DN Main line in between station SDAH and BNXR in SDAH-DDJ section, (3) Br. no.1A at NCC yard , (4) Br No. 17 in between Station DBT-BARU in BRP-LKPR section ,(5) Br No. C/9 in between Station PLF-CHT in SPR-CG section, (6) Br. No. X/15 (RUB) on UP & DN line, between station SGBA and PQS in KGK Chord section, (7) Br. no.20 in SDAH-DDJ Section,(8) Br.no. 1CP in DDJ-KOAA Section, (9) Br no. X-23(RUB) in KGK-BLN Section, (10) Br No. 14CCR on UP & DN line, in Ballyghat Station Limit in DDJ-DKAE section & (11) Br. No. 5CCR (RUB) on UP & DN line between station BARN-DAKE in DDJ-DKAE section in Sealdah Division.
Supply of telecom equipment along with testing and commissioning and other associated telecom works at Delhi Shahdara & Subzi Mandi stations of Delhi Division of Northern Railway
Provision for repair of low insulation 6 quad cable and Emergency Sockets over Lucknow Division
Augmentation of IPIS (CGDB, TIB along with GPS clocks) at Shahganj & Restoration of IPIS (CGDB, TIB along with GPS clocks) at Shahganj & Akbarpur Railway station of Lucknow Division, Northern Railway.
Signaling work in connection with the work of "CSMT-KYN: -Augmentation of Existing RCC Box" at CSMT,Dadar,VVH,DI,THK,VK in Mumbai Division.
Godhra-Nagda section: : Safety and reliability improvement and replacement of defective/overaged midlife signaling gears and equipment.
Supply, Installation, Testing and commissioning of Telecom facility at New Conference Hall for the officers' Zonal Headquarters, South Eastern Railway.
Comprehensive Annual Maintenance Contract of Data loggers and RTUs along with its networking over Pune division of Central Railway for a period of three years.
Signal work in connection with Provision of RGM Siding work at Shohratgarh, Tulsipur, Munderwa & Motiganj stations and Track Machine Siding work at Uskabazar & Balrampur stations of LJN Division.
Comprehensive Annual Maintenance contract for Deltron make Universal Fail Safe Block Interface (UFSBI) installed in Block Section of RPC,JP-SWM,JP-RGS & 04 IB section of JP division for Two Years.
Ajmer Division:- Provision of S&T Associated work in C/W Beawar - Palanpur - TTR (WCMSC) - 284 Set in Ajmer Division NWR."
Ajmer Division: Comprehensive maintenance contract of Electronic Interlocking of Kyosan make installed at 21 stations in various section of Ajmer Division, North Western Railway for Three (03) years
Ajmer Division:- Provision of S&T Associated work in C/W Madar - Karjoda - TTR (FS+TWS+WCMSC) -1 in 12- 111-Nos. in Ajmer Division NWR
Schedule A-Renovation of Switching Posts at Konnagar, Srirampore, Bhadreswar and Hooghly in Howrah Bandel section in Howrah Division of Eastern Railway Schedule B-Provision of Circuit Breaker (CB) at Various Yard, Siding to improve sectioning arrangement in Howrah Division of Eastern Railway Schedule C-Work for Section Building & carshed store, Phase-1 Schedule D-Construction of Sukhdev halt between Dainhat and Katwa Jn. Stations in Bandel Katwa section of Howrah Division (Telecom) Schedule E-Replacement of old and overaged OFC Container with New OFC Room over Howrah Division.(Phase - I) Schedule F-Extension of Local area networking system of the office under PCCM/ER at Old Koilaghat Building, Eastern Railway. Schedule G-Telecom cost for Premium & end to end examination facilities of BCN rakes at BDC Yard Schedule H-Provision of Security Items for Station Security Plan (SSP) at Bolpur and Rampurhat of Howrah Division Schedule I-Provision of Security Items for Station Security Plan (SSP) at Bolpur and Rampurhat of Howrah Division
Part supply of signaling material, installation, testing & commissioning in connection with construction of ROB in lieu of LC No. 232/B at Km. 759/6-7 between station Kalol - Khodiyar, LC No. 228 at Km 753/4-5 between Kalol - Pnsar Road and LC No. 230 at km 756/4-5 between Kalol - Mahesana on Ahmedabad - Palanpur section of Ahmedabad Division.
Various S&T works inconnection with Engineering Works & RPF Barrack Sub Work1: Proposed construction of RPF Barrack at Koppal (8 beds). Sub Work2:Proposed construction of designated building of RPF out post at Dharwad . Sub Work3:Proposed construction of FOB near ROB 26 A at KM 613 326 (BGM-SXB). Sub Work4 Proposed Foot OVer bridge near ROB 6 A at km 611.355 in LD-MRJ section . Sub Work5:Construction of RUB in lieu of LC No. 11 @ KM 19/820 in between SXH-AVA station respectively by Air/Box pushing method. Sub Work6: Strenthening of super structure by Re girdering of Re-gidering of Br.No.142/A (Span 1*13.18mPG RUB) at KM 680/500-600 between GPB-CKR Sations in LD-MRJ Section of hubli division. Sub Work7:Proposed rehabilatation/replacement of BR 189 at KM 723/297 With RCC Box Bridge in LD-MRJ Section in Between UGR-SED Station .Sub Work8:Proposed rehabilatation/replacement of BR 219 UP at KM 745/2100-200 With RCC Box Bridge in LD-MRJ Section in Between VJR-MRJPropsed Station . Sub Work9:Proposed Construction of Multipurpose community hall at Willey ground .Contingency fund.Sub Wor10 :Proposed Rebuilding /Replacement of Bridge No. 45 DN between HPT-GDG on account of ORN 3 Over UBL. Sub Wor11 :Construction of Pedestrain Subway [5.0 x 3.2 m] at KM 486/600 in between NVU - DWRstation. Sub Wor12 :KJG-DWR section:Construction of pedestrain/Two wheeler subway in view of safety for increasing sectional speed to 130 kmph [at KM 471/100] . Sub Wor13 :Signalling works in connection with Proposed construction of Foot over Bridge for Halt Station at Parakanahatti. Funds by CN (LD-MRJ DL)Sub Work14: SUBL-KJG Section: Provision of W beam metal barriers &fixed knot fencing along side the track for a total length of 104.12Km. Sub work 15 : Proposed closure of LC no 321 at Km 520/800-900 between KHST-LWR section by construction of RUB.
Replacement of Control cum Indication Panel (CCIP) with Visual Display Unit (VDU) at 26 Electronic interlocking stations ( For 03 stations i.e Mugad ,Kyarkop and Bellary stations) over Hubballi Division.