Loading…
Loading…
1,684 results • Best match
Dry Erase Writing Boards (V3) (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 3 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days Bid Number : GEM/2025/B/6859942 Dated : 06-11-2025 Bid Document 1/5 ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Security Manpower Service (Version 2.0) - Office/Commercial/Institutions/Residential; Unarmed Security Guard, Manpower Outsourcing Services - Minimum wage - Unskilled; Not Required; Others, Manpower Outsourcing Services - Minimum wage - Skilled; Graduate; Admin
Constructions of Work on the establishment of a clean drinking water unit at Ganeshapalya Sivakeshavanagar, Ward No. 03 of Municipal Council And Construction OF CC Road ward no 29 at Mulbagil Town Limit and Painting and Tiles Work For Indira Cateen ... and shed in ...
Green Shed Net, Blue Paint, Red Paint, White Paint, Black Paint, Thinner, Distemper, Geru, Harpic, Handwash, Phynyl, Lyzol, Vimbar, Soft Broom, Hard Broom, Box File, Transparent Tape, File Tag, Fevicol, File Poker
As per the tender document
REWINDING OF MOTOR - 1 HP, REWINDING OF MOTOR - 3 HP, REWINDING OF MOTOR - 5 HP, REWINDING OF MOTOR - 7.5 HP, REWINDING OF MOTOR - 10 HP, REPAIR OF GD TRANSMITTER, REPAIR OF GD RECEIVER, REPAIR OF PT TRANSMITTER, REPAIR OF PT CUC CARD, SUPPLY OF ... TO SHED , ... FROM SHED TO ... TO SHED , ... FROM SHED TO ... TO SHED , ... FROM SHED TO ...
Construction of People Standing Shed and Other works in SC Burial Ground at 12 no ward Construction of Road and drain From Rayagond Bidare house to Ladies Toilet Rooms at 9 no ward 3 Development of C C road From Khanapure house to Kadappa Mallannavar house and Re fixing of Pavers road From tavanappa Khanapure house to Baramappa Palled House at 7 no ward 4 Re fixing of Pavers from Rajak Khadagave house to punnuri house and Construction of drain near Jafar Plot at w no 1
AS PER BOQ AND TENDER DOCUMENT
Pneumatic Barrel Pump (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Bid Number : GEM/2025/B/6514284 Dated : 30-07-2025 Bid Document 1/5 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Industrial Safety Helmet (V3) ISI marked to IS 2925 (Q2)
Gasket sealing Compound (Q3)
Digital Light Meter (Q3)
Anemometer (Q3)
Industrial Safety Helmet (V3) ISI marked to IS 2925 (Q2)
Writing Pad Chair (Q2) MSE Exemption for Years Of Experience Yes | Complete Startup Exemption for Years of Experience and Turnover No Document required from seller Experience Criteria, Past Performance, Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6924544 Dated : 24-11-2025 Bid Document 1/8 Number of Auto Extension count 1 Past Performance 40 % Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Industrial and Protective Rubber Knee and Ankle Boots (V2) as per IS 5557 (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years Of Experience Yes | Complete Document required from seller Experience Criteria, Past Performance, Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6789033 Dated : 24-10-2025 Bid Document 1/6 Number of Auto Extension count 1 Past Performance 40 % Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 3 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Writing Pad Chair (Q2)
Repairing of C C road From Murageppa kuppasagoudra house to gurusidd sanadi house pachapur kirani store to iranna doodagavi house and repairing of rudrappa hudali house to laxman hukkeri house parappa patil house to rama nayak house mahadevi ... Kumbar Shed and ...
Construction of a C.D. at the spot connecting the 3rd Cross of Shirahatti Layout in Shivabasava Nagar to the Ring Road , Shri Kamanna house to the shed in Bhajantri Layout, Tikare house to Basava house in the Brahmin Colony of Vastrad Layout,Shri Malakashetti house to the Pure Water Plant (RO Plant) in front of the Railway Hanuman Temple in Vivekananda Nagar,the Masuti house to the garden in the 2nd Cross of Irani Colony And Installing a pipeline for the newly drilled borewell near Shri Baindur house in Vivekananda Nagar At Ward No11
Repairs and Re conditioning of faulty Conventional and BEE Any star Rated Distribution Transformers of various capacities (25, 63 & 100kVA) of different makes at Rabakavi sub division in Jamakhandi division for fresh bidders(Bidder Repair Shed)
Replacing damaged AC sheet roofing of vehicle shed, profile sheet roofing over CSC, repairs to toilets, uprooting and disposal of roof of big fallen tree and other misc., civil works in TE campus, Gopi Circle, SHIVAMOGGA.
Hassan-Mangalore section: Painting of steel girder bridges due for the year 2020- 21 & 2022-23 under SSE/Br/SKLR jurisdiction (Including SKLR-SBHR ghat section) in HAS-MAJN section.(Bridges Nos. 293, 296 298, 300, 367, 400, 474, 539 & IOH shed and 15, 23, 133, 142,165, 177, 180, 183, 184, 185, 186, 187, 188,189, 190, 192, 193, 194, 200, 232, 233, 238, 239, 241, 243, 246, 247, 248, 249, 250, 251, 252, 264, 281, 283, 287, 289, 292, 297, 303, 318, 322, 326, 327, 328, 334, 335, 337, 353, 358, 366 &578)(Balance Work)
Bangalore-Setting up of 'safety village' for training of break down officials in disaster management at IRIDM - HEJJALA - Balance works of: Administrative Block / Hostel / Sports Complex / Quarters / Station Building / Roads / Bridges,Drains etc.New ... Covered shed of ...
SW I : Penukonda - Sri Sathya Sai Prashanthi Nilayam - Dharmavaram : Track work, Earthwork and supply of Ballast in connection with the work of Provision of Additional loop line Road - 3 at Basampalli (BSPL) station. SW II: Doddaballapur - Track ... car shed to ...
As per BOQ
Material supply for construction of NRM Shed to Gandhanahalli GP Tender Notification for Procurement of Material Supply for Construction of Solid Waste Disposal Unit under NREGA Scheme at Gandhanahalli Village in Gandhanahalli Gram Panchayat, K.R, Nagar Taluk
Drilling Of borewell and installing a cistern tank near Maratha Mandal and Rajput Printing Press on Tagore Road. Constructing a pure water shed over the large drain near Mathada Paja Gatti. Installing a concrete slab over the drain between Mudhol house and Laxman Dahinde house near Karanth Scan Center. ippanna Dahinde house (Mandali).behind Rajput Press . Installing interlock pavers on both sides of the road from Mandali house to the Kannada School (Delhi Readymade). Constructing a 5 seater toilet block (Mutrikhana) near the KCC Bank. And Installing mini high mast lights in front of Advocate Nidagundi house, near Pattanshetti house, and on Shankaracharya roads near the KCC Bank. CAT-I)
Dismantling of 2 nos Closed Storage Shed excluding foundation at 2x800 MW Sri Damodaram Sanjeeviah TPP Stage I Krishnapatnam Nellore District Andhra Pradesh Transportation to 2x700 MWe Kaiga Atomic Power Project Unit-5 and 6 Uttar Kannada Dist
Providing Supplying Oligodayamic Disinfection Treated water and fixing iron shed and Fixing of Duplex grade/304 grade SS water Storage loft Tank with supply and installation of CDWP with pressure boosting pump with suitable enclosure works and CMC
Custom Bid for Services - Supply, Installation & Commissioning of On-Grid Rooftop Solar Power Plant along with Vehicle Parking Shed Similar Category Design, Supply, Installation, Commissioning and Maintenance of Grid Connected Roof Top Solar Power Plant Service Support Services
Bench Vice (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate, Additional Doc 1 (Requested in ATC), Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6396612 Dated : 04-07-2025 Bid Document 1/7 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
DRUM STACKING RACK (Q4) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6530826 Dated : 04-08-2025 Bid Document 1/7 Bid to RA enabled No RCM Applicable Yes Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
thermal imager (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2025/B/6876379 Dated : 11-11-2025 Bid Document 1/5 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Scissor Lift (V2) (Q3) MSE Exemption for Years of Experience and Turnover
Flat Pallets for Intercontinental Materials Handling as per IS 7276:2021 (Q3)
Passive optical network power meter (Q3) MSE Exemption for Years of Experience and Turnover
Table Fan/Wall Mount Fan/Ceiling Mount Fan as per IS 555 (Q3) MSE Exemption for Years of Experience and Turnover
Machine Vice as per IS 4502 (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), Additional Doc 1 (Requested in ATC), Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6486147 Dated : 24-07-2025 Bid Document 1/7 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Pneumatic impact wrenches (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 3 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days Bid Number : GEM/2025/B/6871873 Dated : 10-11-2025 Bid Document 1/5 ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Platform Trolley (V3) (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 3 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days Bid Number : GEM/2025/B/6861067 Dated : 06-11-2025 Bid Document 1/5 ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Nitrile Coated/Nitrile Hand Gloves (V2) (Q3) MSE Exemption for Years of Experience and Turnover
Impact socket (Q3) MSE Exemption for Years of Experience and Turnover
Grease Gun as per IS 7794 (Q4) MSE Exemption for Years Of Experience and Turnover Yes | Complete Startup Exemption for Years Of Experience and Turnover Yes | Complete Document required from seller OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6492976 Dated : 24-07-2025 Bid Document 1/6 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Ratchet Type Torque Wrench (Q3) MSE Exemption for Years of Experience and Turnover
Platform step ladder (Q4) MSE Exemption for Years of Experience and Turnover
Hot air gun (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 3 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days Bid Number : GEM/2025/B/6987561 Dated : 11-12-2025 Bid Document 1/5 ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Screw Drivers as per IS 844 (Q4) MSE Exemption for Years of Experience and Turnover
Executive Table (V3) (Q2) MSE Exemption for Years of Experience and Turnover
Double Hex Sockets (Q4), Ring Slugging Wrenches (Spanners) - as per IS 4509 (Q4) MSE Exemption for Years of Experience and Turnover
Double Hex Sockets (Q4) MSE Exemption for Years of Experience and Turnover