Loading…
Loading…
4,780 results • Latest
replacement of 36KV VCB for 33KV Naubasta feeder
Gravity Plus Anti Sticking Agent (Organic Based Industrial Liquid) Formula-ISO ALKANE
ULTR SNR LT RNGE 5 MTR, LEVEL TRANSMITTER 0-10 METER, ULTR SNR LT, RU RNGE 0-10MTR, ULTR FLAM PROOF L T RNG 20 MTR, ULTR FLAM PROOF L T RANGE 20 MTR
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - 400 KV VISHNUPRAYAG- MUZAFFARNAGAR LINE; TRANSMISSION LINE; Service Provider
Manpower Outsourcing Services - Minimum wage - Skilled; Graduate; Admin, Manpower Outsourcing Services - Minimum wage - Unskilled; High School; Others
Overload Relay (Q3)
Earth Leakage relay
Manpower Outsourcing Services - Minimum wage - Skilled; Graduate; Admin
Air Break Contactors (Q3)
Moulded Case Circuit Breakers (MCCB) Conforming To IS/IEC 60947 (Part 2) (Q3)
Register (V2) (Q4) (3 (3 ))
Manpower Outsourcing Services - Fixed Remuneration - Admin; Computer Operator; Secondary School
Facility Management Services - LumpSum Based - Industrial; Construction of RCC Flooring Near Crusher house of Obra C; Consumables to be provided by service provider (inclusive in contract cost)
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - E400KV S/S Division, Moradabad; Substation, Switchyard, Power House Equipment, Electrical System or Installation; Service Provider
Low Voltage MCCBwith Thermal Magnetic/Electronic Trip Unit Conforming To IS/IEC60947 (Part2) (Q3)
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Power Substation; HVAC, Substation, Power House Equipment, Electrical System or Installation; Service Provider
Substation Clamps/Connectors (Q3)
Multimedia Projector (MMP) (Q2), Projector Screen (V2) (Q3), Multifunction Printer (Print, Scan, Copy) (Q2), Line Interactive UPS with AVR (V2) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Armour Ring Segment - TA Drg. No. 10307075 (01 Set= 04 Nos. Segments), Armour Ring Segment - TA Drg. No. 10307076, (01 Set= 04 Nos. Segments)
SPARE DIPHRAGM FOR SOUNDERS WEIR TYPE CONNECTION PIN TYPE SIZE 50 MM, SPARE DIPHRAGM FOR SOUNDERS WEIR TYPE CONNECTION THREAD LOCK SIZE 50 MM
Substation Clamps/Connectors (Q3)
Helical gear box Model no. H1- 160, Ratio 1.35: 1 FOR ASH SLURRY PUMP
Manpower Outsourcing Services - Minimum wage - Skilled; Graduate; Non-IT Technical
Manpower Outsourcing Services - Minimum wage - Unskilled; class viii; Non-IT Technical
Operation and Maintenance Power House/Power Plant - CHP MISC MAINTENANCE WORK
Manpower Outsourcing Services - Minimum wage - Skilled; Graduate; Non-IT Technical
HYDROGEN GAS
Flex SS304 Hose for Oil Gun cleaning stand ID-25 mm, L- 650 mm, Mat. SS304, Flexible SS Hose for air line of oil Gun, ID-20 mm, L-2100 mm, Mat. SS304, Flexible SS Hose for oil line of oil Gun, ID-20 mm, L-2100 mm, Mat. SS304, Flexible SS Hose for Scanner airline ID-20 mm, L-2400 mm, Mat. SS304, Flex SS Hose for Purge air line of burner ID-15 mm, L-2400 mm, Mat. SS304, Flex SS304 Hose for Manhole door of Boiler ID-25 mm, L-2600 mm, Mat. SS304, Flex SS304 Hose for Peep hole ID-15 mm, L-2400 mm, Mat. SS304, Flex SS304 Hose for BRP Cooler ID-62 mm, L-2500 mm, Mat. SS304, Flex SS304 Hose for BRP Drain ID-25 mm, L-2600 mm, Mat. SS304
Operation And Maintenance Of Lifts (Elevators) - Complete System
51 to 100, Attend flange or bonnet lkg of HP valve or HP pipe101 to 150, Attend flange or bonnet lkg of HP valve or HP pipe151 to 200, OH of by pass valve of temp control line or Patch welding work in the condenser or Hot tightening of ejector, Clean of filter of tur oil or H2 cooler str, OH of Main steam line valve i.e. V2 6, OH of Feed line valve with by pass valve, OH of NRV of extraction line, ES-1 or ES-2 or IPT transfer pipe line drain valve, OH of NRV of extraction line, ES-8 or ES-11 or OH of NRV of HP drip or CEP disch line, OH of valve cont.to cond DW-4 or 38- 41 or CA-5 or AS-47 or AS-48 valve, OH of Stm throw valve to cond or iso LPH-2, OH of Steam by pass valve V2-27 or 15 or V2-7, OH of Extrac valve i.e. ES-3 or 4 or 5 or 6 or 7 or OH of Drip line gate valve HD-21or 29 or 30 or 31, OH of FCNRV or isolating valveof LPH-3 or 4., OH of Condensate throw off valve to cond, Rep of ES-9 by H.P welding tech, Rep of V2- 27 or 15 by H.P welding tech, Rep of V2-38 or 81-84 by H.P welding tech, OH of actuators of MSV-L or R, OH of actuators of DW-4 or 38- 41 or CA-5 or CST makeup valve or ES-3 to7 or HD-21 or HD-29 to 31 or AS 47 or 48, OH of Actrs of V2-38 or 81-84 or 27 or 15 or V2-7 or steam iso valve LPH-3 or 4, OH of Actrs of Butterfly valve, OH and Re- visioning of LPH-2 to LPH-4 or GC-I or GC-II or LPH-1A or LPH-1B, OH of gauge glass of LPH or Gc or Ejc or Dea o rCON, Tight. of flange of CRH or GC-I or II or LPH, Overhauling of DSS of Aux., PRDS-II, Overhauling of Main flash tank, Overhauling of Aux Flash tank, Repair or replacement of broken hanger., Tightening of loose hangers., Attend the flange leakage of CRH Line., Serv of hydr. brake of Chit or Gar Crane, Chk and Grs. of brg, cplg, chang bush of bolt or Serv of greep brake of Chit or Garlic Crane or sevicing Servicing of all the wheel of Garlic or Chitram crane and plate, OH of small hook of chit or Garlic Crane or OH main hook, Serv.of all gear boxes of Chit or Gar Crane, Check and clean of wire rope drum or bearing, OH of DSS of Aux. PRDS, Cut and weld and repl of LP Valve Up to 50 mm, Cut and weld and rep of L.P. Valve51 to 100mm, Cut and weld and rep of L.P.Valve101 to 150mm, OH of isolating or Bypass valve of PCV 5 or 14 or 17, OH of valve contd to dea at 13 mtr V2-21 or CST makup valve, OH of suc valve of BFP or Disch valve of CEP, OH of suction valve of CEP or MC-18-25 or 33 or 37 or OH of U Bend valve, Fab of reducer for HP Drip 218-80 or 168-80, Rep of reducer of H.P Drip line, LPH drain line valve HD-8 or 9 or 14-19 or 20, Check and rect of internal fault of dea, Blanking of CRH line for Reheater HT, Rem chocking oil drain of brg1 or 2 of tur., Rem chocking of drain of cntg. machine., Repl of damaged NRV of PCV-14 or 17 Size200, Repl of damaged NRVof feed line Size-250, OH of butterfly valve of condenser, Hot tightening of cross over pipe, OH of HP heater and attend of flange lkg., Attending the shell joint of HPH, Attend the spot lkg of HPH shell joint., OH of Safety valve of flange or stud heatng or LP heater or HP heater or CBD tank, OH of Safety valve of warm up line, OH of Safety valve of aux PRDS or deaerator or OH of NRV of Aux RPDS heat line to FST, OH of NRV V2-52 or V2-53 or V2- 80, OH of NRV of re-circulation line of BFP or spindle leak off line, OH of H.P. Valve and NRV., OH of H.P. Steam drain line valve., Rep of NRV of HPH drip to deaerator, Welding of crack in HPH or CRH pipe line, Fab of bend for re- circulation line or OH of group protection valve i.e. FW-1, Fab of bend for HPH drip line con to dea, Fab of bend of LPH drip to drip pump or condenser, Rep of bend of HPH drip line con to dea, Rep of bend of RC line con to dea or OH of Bid Details 2/106 feed pump energy absorber., Rep of bend of LPH drip to drip pump or condenser, Cutting and welding of H.P. Valve 15 to 50mm, Cutting and welding of H.P.Valve 51 to 100mm, Cutting and welding of H.P.Valve101 to 300mm or OH of PCV 10, Rem of chocking of shell or coil drn of HPH, OHof LCV3-12 or 15 or PCV5 or 14 or 16 or 17 TCV8 or 10-12, Cut or weld of joint of H.P. Pipe15 to 50mm, Cut or weld of joint of H.P. Pipe51 to100mm, Fab of bend 63.5 X 5.5mm with jacketing, Overhauling of L.P. valve or LP NRV, Overhauling of LP by pass valve., Overhauling of HP by pass valve., Overhauling of HP or LP by pass spray valve, Changing of Mech. Seal BFP Booster Pumps DE or NDE, Re- visioning and checking of working oil or Lube oil cooler, Re- visioning and Tube Leakage SW, Re-visioning and Checking BCW or SWC, Replacement of inside Stator Assy, Inspection or Rectification of fault of BFP NDE or DE Bearing, Rectification of fault of BFP Motor NDE or DE Bearings, Complete OH of Drip pump, OH of CW Booster Pump or H2 gas cooling pump, Alignment of Motor of CW Booster, Re- adjustment of Bearing, inspection of fault of Drip Pump, Overhauling of BCW or HW or SW or SWC Pump, Overhauling of Phosphate Dosing Pump, OH of Hydrazine pumps or Re-visioning of Suction filter, Re-visioning of thrustpad of BFP, Alignment of B.F.P. with Hydraulic Cplg, Shifting of condensate pump without modification, Shifting of condensate pump2 with modification, Fabrication of Compensator Suction, Fitting of compensator in suction line, Inspection of Fault of CEP Bearing, Complete Overhauling of CEP, Cleaning of strainer of Cond. Pumps., Replacement of BFP LO or WO or SW cooler, Overhauling of air washer blower, Overhauling of air washer pump, Tanks cleaning, Cleaning of working oil cooler of BFP, Cleaning of lub oil cooler of BFP, Matching of thrust collar, Replacement of AOP oil seal, Replacement of damaged coupling bush, Replacement of damage nipple of BFP, Priming of AOP or Attending oil leakage, Changing of plunger, Filling gland in Phosphate or Hydrazene, Cleaning of cooling oil line, Removal of chocking of BCW line of CEP, Cleaning of make up oil storage tank, Replacement of damage flange, Alignment of motor of air washer pump or fan or SOP, Alignment of AC or DC Lub Oil Pump, Replacement of bearing of Hydr Coupling, COMPLETE OH OF HYDRAULIC COUPLING, REPLACEMENT or RE-VISIONING OF MOP or AOP, REVISIONING AND CHECKING of control block scoop tube, Cleaning of cooling line of B.F.P.B PU or drip Pumps, Re- visioning and checking of wire mesh, Overhauling of Boiler Feed Pump upto balancing Disc, Changing of Mech. Seal of BFP-S.S, Changing of Mech. Seal of BFP-D.E, OH of Boiler Feed Booster Pump, Alignment of Motor of boiler Feed booster, Alignment of Motor of Drip Pump, Alignment of Motor of H2, Alignment of Motor of B.C.W. or HW or SWC or SW Pump, Rectification of fault of bearings of BFP booster, OH of Centrifuging MC Pump, Straightening of condensate pump shaft, Replacement of Drip pump, Cleaning of filter of AOP, Decoupling and coupling of motor of CEP or attending gland leakage of CEP, Attending gland leakage of Drip pump, Cleaning of filters of phosphate or Hydrazene, Replacement of damage coupling of AOP or Cleaning of Suction Filter of Air washer, Rectification of foundation base or Rectification of coupling of small pump, ALIGNMENT OF HYDRAULIC COUPLING, Re-visioning of seal water cooler, OH of OSU of HP or LP system, Clean of BCW cooing line of BFP Bstr or Chang labyrinth seal of BFP motor brg, Trans of spares from CSD to S store of TMD-I, Loading and Unloding Bid Details 3/106 and transp of Material of TMD-II, Round the clock routine and preventive maintenance works of Turbine and its auxiliaries of unit no. 12, 13 and CW Pump
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Jungle Cleaning and House Keeping work; Service Provider
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Substation; Service Provider
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Substation; Service Provider
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Water supply, sanitation and Miscellaneous Civil work; Service Provider
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Commercial; Substation; Service Provider
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Electrical Substation; Swithyard, Substation; Service Provider
Monthly Basis Cab & Taxi Hiring Services - Premium Sedan; 3000 Km x 364 hours; Local 24*7, Monthly Basis Cab & Taxi Hiring Services - Sedan; 3000 Km x 364 hours; Local 24*7, Monthly Basis Cab & Taxi Hiring Services - SUV; 3000 Km x 364 hours; Local 24*7, Monthly Basis Cab & Taxi Hiring Services - SUV; 2500 km x 320 hours; Local 24*7, Monthly Basis Cab & Taxi Hiring Services - Sedan; 2500 km x 320 hours; Local 24*7, Monthly Basis Cab & Taxi Hiring Services - SUV; 2000 km x 320 hours; Local 24*7, Monthly Basis Cab & Taxi Hiring Services - SUV; 1500 km x 320 hours; Local 24*7
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Sub Station; Switchyard, Substation; Service Provider
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Commercial; Electrical System or Installation; Service Provider
Replacement of complete set of Ring hammers, Replacement of damaged broken ring hammer, Replacement of damaged felt seal lining asbestos rope, Replacement of inside bearing No 22244 KC3W33 motor side, Replacement of damaged O ring and Repairing of fluid coupling, Replacement of free end bearing, Alignment of Crusher with motor, Dismantling, removal of rotor shaft, Dismantling of Crusher rotor, Assembly ofCrusher Rotor, Mounting and fixing up the rotor shaft, Work of common chute above RPG, Replacement of damaged multi disc, Replacement of damaged breaker plate, Replacement of damaged top cover, Replacement of damaged screen, Replacement of kickoff plate, Replacement of damaged tramp iron tray, Replacement of damaged back plate, Positioning of vibrating feeder tray, Replacement of damaged rubber pads, Replacement of all rubber packing, Repairing of chute, Replacement of damaged end cover guard, Checking of both bearing, repacking after greasing, Repr., Repl. of fusible plug and Filling of oil, Repr of damaged portion of screen plate kickoff plate back plate, Repl. of damaged portion of middle and end disc, Repl. of bolt of Screen, kick off, tray foundation, Work on individual chute below RPG, Repl. of bearing housing coupling end, Repl. of bearing housing face end, Repl. of side cover, Removal of any iron forein material, Overhauling of cooling water pump, Replacement of damaged shoo headed bolt of bearing housing, Dismantling of top cover and side cover, Repl. of bottom liners of VF tray, Repl. of half flexible coupling bolts, Repl. Of bolts of breaker plate, Replacement of damaged valve of cooling water line, Repl. of the damaged front chute of conveyor 4A4B, Repl. of both half coupling of crusher rotor and FCU, Dismant., removal and refixing of FCU, Repl. of gate valve, OH of DE system, OH of Iron chute, Repl of VF Tray, Repairing of VF Tray, Overhauling of RPG, Fabrication of Breaker plate, Fabrication of Iron Tray, Fabrication of kick off plate, Repl. of side Chute of common hopper, Fabrication of top cover of crusher, Repl. of all 16 window, Servicing repairing of Valves From Dia 4 to 12, Strengthening Repairing of crusher body, The work of Strengthening of VF 2AB, Fabrication of Chute pipe of WT, Fabrication and Installation of mesh of WT, Fabrication of screen for coal crusher, Dismantling of Chute VF Tray and Base, Fabrication Strengthening of Chute VF Tray and Base, Erection of Chute VF Tray and Base, Fabrication of Coal Crusher Chute, Replacement of complete set of hammers, Replacement of damaged hammers, Replacement of felt seal lining packing, Replacement of inside bearing DE Side, Replacement of inside bearing NDE side, Replacement of screen plate coupling, Minor Repairing of chute ducts, Checking of DE and NDE side bearing, Minor Repairing of white metal bearing, Repairing of screen casing Crusher bar, Replacement of damaged broken bolt, Replacement oil ring white metal brg, Removal of any iron foreign material, Replacement of bolts of breaker plate, Fabrication of casing crusher bar, Minor work, Air gap checking and adjustment, Matching, inst. of both Babbitt brg, Grease gun overhauling, replacement and shifting of crusher rotor, Coupling and decoupling of crusher, removing top duct and re erect, Overhauling of Crusher 7A and 7B, Overhauling of Wagon Tippler No 2 and 3, Overhauling of New Stacker Reclaimer HM 135
Manpower Outsourcing Services - Minimum wage - Skilled; Graduate; Non-IT Technical
Manpower Outsourcing Services - Minimum wage - Unskilled; High School; Non-IT Technical
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Substation; Service Provider
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Substation; Service Provider
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - 2262193; Substation; Service Provider
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - 1980904; Substation; Service Provider
Rotary Selector Switch Conforming To IS/IEC 60947 (Part 3) (Q3), Air Break Contactors (Q3) ( ( 3 3 ))
Cooling Tower Blade Set
Manpower Outsourcing Services - Minimum wage - Unskilled; Class III; Non-IT Technical