Loading…
Loading…
625 results • Best match
Replacement Of Bare Conductor L.T. Line by Aerial Bunched Cable at P.G. College, Gopeshwar Station against Capital Head under EDD Gopeshwar on Semi-Turnkey basis
SUPPLY AND INSTALLATION OF SOLAR POWER PACK UNDER PM JANMAN SCHEME ON TURNKEY BASIS AT TOK KUTA CHYURANI IN VILLAGE KHETAR KANYAL UNDER EDSD DIDIHAT
REPLACEMENT OF BARE CONDUCTOR L.T. LINE BY AERIAL BUNCHED CABLE AT HARNI, GWALADDI, ULANGRA, LOSHRI, KUNAR AND SAWADEK ON SEMI-TURNKEY BASIS UNDER EDD, NARAYANBAGAR
Construction of 2x5 MVA, 33/11 KV Substation (Indoor) Ranipokhari, District-Dehradun and its associated 33 KV line (6.8) and 33KV Bay on turnkey basis
Construction of 2x3.15MVA, 33/11KV Substation at Nakote along with associated 10Km LILO line on ACSR Dog Conductor on turnkey basis in District- Tehri Garhwal
CONSTRUCTION OF 33 11KV 2X5MVA SUBSTATION AND ITS ASSOCIATED 33KV LILO LINE AT VILL SATYON BLOCK LAMGARA DISTT ALMORA INCLUDING CIVIL WORKS ON TURNKEY BASIS
Replacement of 33 KV bare line by AAAC covered conductor from Simli to Kaleshwar against Capital (SI) Head under EDD Gopeshwar on Semi-Turnkey basis
Replacement of 33 KV bare line by AAAC covered conductor from Kothiyalsain to Pursari against Capital (SI) Head under EDD Gopeshwar on Semi-Turnkey basis
Reconductoring 33KV line with Dog Conductor from Jakholi S/s to Ghanshali S/s on Semi-Turnkey Basis Under EDD Rudraprayag against Capital (SI) Head
Replacement of 33 KV bare line by AAAC covered conductor from Langasu to Nandprayag against Capital (SI) Head under EDD Gopeshwar on Semi-Turnkey basis
Replacement Of Bare Conductor L.T. Line by Aerial Bunched Cable at different village like Kiruli, Kamya against Capital Head under EDD Gopeshwar on Semi-Turnkey basis
Erection of new 33 KV underground cable line from 220 KV SSN Majra to Lalpul Saharanpur road, Bhandari Bagh under EDD (South), Dehradun on turnkey basis.
CONSTRUCTION OF 33KV LINE FROM 132/33KV S/S NANI-RANIKHET UPTO VILLAGE-DUGURA (RANIKHET) FOR POWER EVACUATION, DISTT. NAINITAL ON TURNKEY BASIS FOR PACKAGE-B
CONVERSION OF OVERHEAD LT/HT ELECTRICAL DISTRIBUTION NETWORK INTO UNDERGROUND DISTRIBUTION NETWORK FROM ARAGHAR CHOWK TO RAILWAY STATION AS PER SMART CITY PLANNING ON TURNKEY BASIS
Replacement Of Bare Conductor L.T. Line by Aerial Bunched Cable at Haldapani, Leesa Band, Nola Pani against Capital Head under EDD Gopeshwar on Semi-Turnkey basis
PKG-B Undergrounding of HT and LT lines (S/s-Tapovan and Muni ki Reti) on turnkey basis under Revamped Distribution Sector Scheme in Uttarakhand State
Replace of bare Conductor into AB Cable at diff. Area in Khatyari section under 33/11 KV S/s Khatyari under EDD, Almora on turnkey basis
Tender for Supply, Installation, Commissioning and Maintenance of Medical Gas Pipeline System On Turnkey Basis at Dr. SushilaTiwari State Hospital, Haldwani in the state of Uttarakhand
Annual Rate Contract for Drilling and Installation of India Mark II hand pumps in various hill districts of Uttarakhand by ODEX-115/DTH Method on turnkey basis
Supply Installation Testing and Commissioning of Infrastructure Works Loss Reduction on turnkey basis under Revamped Reforms Linked Results Based Distribution Sector Scheme PACKAGE H RDSS EDC Haldwani
Annual Rate Contract for Drilling and Installation of India Mark II hand pumps in various hill districts of Uttarakhand by ODEX-115/DTH Method on turnkey basis
Laying of LT A.B. Cable in various villages/sites on Semi turnkey basis of 11 KV Saradi feeder under Electricity Distribution Sub-Division, Dakpathar under EDD, Vikasnagar
Replacement of old damaged weasel conductor of 11 KV Mansuna Feeder by AAAC Covered Conductor 70mm2 on Semi-Turnkey Basis Under EDD Rudraprayag against Capital (SI) Head
Laying of LT A.B. Cable in various villages/sites on Semi turnkey basis of 11 KV Kalsi feeder under Electricity Distribution Sub-Division, Dakpathar under EDD, Vikasnagar
REPLACEMENT OF BARE CONDUCTOR BY AB CABLE AT DIFFERENT VILLAGE IN 11KV THARALI FEEDER UNDER 33/11KV S/S DHARI UNDER EDD NARAYANBAGAR ON SEMI TURNKEY BASIS
REPLACEMENT OF BARE CONDUCTOR LT LINE BY AERIAL BUNCHED CABLE AT VILLAGE SIRON, KATHUR, GAIR, TANGSA, PIPALKHANA, DOGADI, KANDEI and BAMIYALAL ON TURNKEY BASIS IN DASHOLI BLOCK
Replacement of old damaged weasel conductor of 11 KV Guptkashi Feeder by AAAC Covered Conductor 70mm2 on Semi-Turnkey Basis Under EDD Rudraprayag against Capital (SI) Head
Construction of 33 KV Ring Main Unit(RMU) to be connecting 33 KV Line Joljivi to 33 KV Line Seraghat Munsyari under EDD Dharchula on turnkey basis
Shifting of HT/LT overhead line from Kargi Chawk to Kali Mandir and Kali Mandir to Lalpul Patel Nagar due to road widening on semi turnkey basis
Replacement of bare conductor L.T. line by Aerial bunched Cable at Boragad emanating from 33/11Kv S/s Nandkeshari Dewal on Semi-Turnkey Basis under EDD, Narayanbagar.
Supply Installation Testing and Commissioning of Infrastructure Works Loss Reduction on turnkey basis under Revamped Reforms Linked Results Based Distribution Sector Scheme PACKAGE-I RDSS EDC KASHIPUR
Construction of 11KV/LT line releasing NSC for Baira Majhera and Dewalchara Purara Pumping Scheme (different Stages) under Jal Jeewan Mission under EDD, Bageshwar on turnkey basis
Supply Installation Testing and Commissioning of Infrastructure Works _Loss Reduction on turnkey basis under Revamped Reforms-Linked Results-Based Distribution Sector Scheme District- Uttarkashi, Location Uttarkashi-2
Annual Rate Contract for Drilling and Installation of India Mark II hand pumps in various hill districts of Uttarakhand by ODEX-115/DTH Method on turnkey basis
Annual Rate Contract for Drilling and Installation of India Mark II hand pumps in various hill districts of Uttarakhand by ODEX-115/DTH Method on turnkey basis
Supply Installation Testing and Commissioning of Infrastructure Works Loss Reduction on turnkey basis under Revamped Reforms Linked Results Based Distribution Sector Scheme PACKAGE-J RDSS EDC RANIKHET
nstallation of MCCB 4 Pole on Turn Key Basis at all Distribtution Transformers having capacity 100 KVA/ 25 KVA/ o 11 KV Kirtinagar feeder under 33/11 KV S/s Kirtinagar
Replacement Of bare conductor L.T. Line by Aerial Bunched cable in various villages emanating from 33/11Kv S/s Gairsain/Mehalchauri under EDD, Gairsain on Semi-Turnkey Basis
REPLACEMENT OF BARE CONDUCTOR L.T. LINE BY AERIAL BUNCHED CABLE AT VARIOUS VILLAGES EMANATING FROM 33/11KV S/S NANDKESHARI DEWAL UNDER EDD, NARAYANBAGAR ON SEMI-TURNKEY BASIS.
Renovation of E and M works of UNIT-I including 01 Year AMC on turnkey basis of Badrinath SHP Capacity 2X625 KW in Block-Joshimath District Chamoli Uttarakhand
Supply and Installation of 990 KVA Compact Secondary Substation near Kothari Medical Hall, infront of Coal Depot, Rishikesh under EDSD, Shail Vihar under EDD, Rishikesh on turnkey basis.
Construction of 33 kv line from 33/11 kv s/s Nyulisain to proposed 33/11 kv s/s Akari Barjula Distt Tehri Garhwal on semi turnkey basis
Installation of MCCB 4 Pole on Turn Key Basis at all Distribtution Transformers having capacity 100 KVA/ 25 KVA/ o 11 KV Srikot Town feeder under 33/11 KV S/s Srikot
Construction of Under Ground LT and 11 KV Line at Shri Badrinath Dham due to Master Plan Work on Semi-Turnkey basis under EDD Gopeshwar against Capital (Deposit) Head
REPLACEMENT OF BARE CONDUCTOR BY AB CABLE AT DIFFERENT VILLAGE IN 11KV NARYANBAGAR RURAL FEEDER 1 UNDER 33/11KV S/S NARYANBAGAR UNDER EDD NARAYANBAGAR ON SEMI TURNKEY BASIS
REPLACEMENT OF BARE CONDUCTOR BY AB CABLE AT DIFFERENT VILLAGE IN 11KV NARYANBAGAR RURAL FEEDER 1 UNDER 33/11KV S/S NARYANBAGAR UNDER EDD NARAYANBAGAR ON SEMI TURNKEY BASIS
Laying of 11 KV cable XLPE cable (on pole) VVIP Feeder from 33/11 KV S/s Bindal to Vijay Colony Bridge on Turnkey basis under EDD (Central), Dehradun.
For Electrification of George Everest Peak Mussorie under Electricity Distribution Circle (Urban), Kaulagarh, Dehradun under Deposit Head on turnkey basis E-Tender Spceification No. 08/EDC(U)/2019-20.
Construction of 2x10MVA 33/11KV Substation (Indoor Type) at Jagjeetpur, Haridwar and its associated 33KV underground line with Power Distribution Center (PDC) under Kumbh Mela-2021 on turnkey basis.
Replacement Of Bare Conductor in L.T. Line by AB Cable in Rawailekh,Jaggi,Bedula and uniyana emanating from 33/11Kv S/s Ukhimath under EDD, Rudraprayag on Turnkey Basis