Loading…
Loading…
1,539 results • Best match
Development of Institutional Plot No. 1 admeasuring 2457.01 sqm. (43.03 m x 57.10 m) located in Sector-25 at Panchkula, Haryana
15.0 SUB HEAD -XV:-HVAC SYSREM (VRV SYSTEM). 26,564,970.00 4,242,037.00 30,807,007.00
Addition and Alteration works for Construction of 300 bedded New Hospital Building at DHH Boudh
EI WORKS HVAC WORK Inverter based VRV/ ...
Building work
HVAC PANEL AT THE ROOF S/I/T&Commissioning... G.A drawing. (FOR outdoor HVAC Panel)as per direction of ...
CONSERVATION OF CENTRAL MUSEUM, NAGPUR (PART 01 and RELATED INFRASTRUCTURE)
... third-party building management systems (HVAC, security, and other systems) ...
Providing Interior Works to the Central Documentation Complex (CDC) Building (First Floor - North Wing) of Kamarajar Port
HVAC SYSTEM
Interior renovation and furnishing works at ED office, NBCC imperia Bhubaneswar
BOQ: HVAC SYSTEM
SPECIAL REPAIR TO CENTRAL AC PLANT OF DBM 14 AT NAD KARANJA
HVAC PANEL -Supply, installation,... cubical compartmental type "HVAC Panel" of suitable size,... approved panel builder The HVAC Panel shall comprise of ...
SPECIAL REPAIR TO CENTRAL AC PLANT OF DBM 11 AT NAD KARANJA
HVAC PANEL -Supply, installation,... cubical compartmental type "HVAC Panel" of suitable size,... approved panel builder The HVAC Panel shall comprise of ...
Provision of Fire down comer system, Booster pump, fire detection and PA system, fire extinguisher and Signages at CHC Building Haladia Buildings.
... electrical,Fire fighting,HVAC,ELV drawings, Technical ...
Construction of Boundary wall with main gate and Security room OSMCL State Drug Ware House at Jatni Khordha as per Lr. No. 5319 dt. 05.03.2026 of DHSO Buildings.
... electrical,Fire fighting,HVAC,ELV drawings, Technical ...
Construction of remaining infrastructure work and other amenities of 300 Bedded Sawatantrya Veer Savarkar Multispeciality Hospital at kh no.157 and 158/1 Mauza Wathoda (Phase-2) Nagpur Taluka Dist, Nagpur.
... It is designed to protect HVAC systems and industrial processes ...
UP-GRADATION OF VIRAJPETE TALUK HOSPITAL TO 250 BEDDED HOSPITAL AT VIRAJPETE, KODAGU DISTRICT.
UP-GRADATION OF VIRAJPETE TALUK HOSPITAL TO 250 BEDDED HOSPITAL AT VIRAJPETE, KODAGU DISTRICT. (HVAC System)
As Per TOR
... Server to connect buildings HVAC, MEP and utility systems ...
Electrification Work
... electrical,Fire fighting,HVAC,ELV drawings, Technical ...
As per Tender
... copper refrigerant piping for Hvac system, complete with fittings, ...
Renovation of Administrative meeting hall to facilitate training session at CLW/ Chittaranjan.
... openings for light fixtures, HVAC grills/louvers etc. and ...
Renovation of Administrative meeting hall to facilitate training session at CLW/ Chittaranjan.
... openings for light fixtures, HVAC grills/louvers etc. and ...
Hyderabad Division: Replacement of Codal Life Completed AC Plants in Dialysis Centre, Rail Kalarang, Rail Nilayam Auditorium
Supply of Freon Leak detector refrigerant gas leakage tester of HVAC Air Condition as per the instruction of engineer at site
Electrical Installation works and SITC of AC System for Modification of meeting hall in existing building at Krishi Bhawan, Bankura.
Supply and fixing of HVAC grade copper pipe of following sizes for liquid and Gas line between ODU and IDU [make :Hitachi Ryoku/Nippon] 5/8"( Gas Line)
Interior modification of Director Office and PS to Director office, Administrative Block, JIPMER, Puducherry
... the nearest junction box), HVAC ducting, plumbing/drain ...
Construction of balance works of Regional Centre for Lalit Kala Akademi at 85 AJC Bose Road, Kolkata 700 014 to be executed at Risk and Cost of previous agency.
HVAC SYSTEM - -
Construction of South Gate Complex at JNPA
HVAC SYSTEM
Provision of Civil Work for Bowl Cleaning Building 14G2 at Acem Nasik
CHAPTER -XXV HVAC SYSTEM
Construction of a 300 Bedded District Hospital by demolishing 78-year-old Hospital building at Tumkur.
B. Other Allied Facilities- HVAC System
CONSTRUCTION OF NEW AIR-CONDITIONED ENGINE ASSEMBLY SHOP WITH ANNEX BUILDING FOR OFFICES AND SUB-STATION AT ENGINE FACTORY AVADI
... Central Chilled Water Based HVAC System comprising AHRI/Eurovent ...
Internal electrification, external electrification, fire alarm, PA system, fire fighting, CCTV, Lift, ventilation, construction of boring and 1 year operation at Kisan Agrimall, Vikalp Khand, Gomti Nagar, Lucknow
... converter, Communication module, HVAC software in addition to... Programmable Logic Controller with HVAC software b) Dedicated PWM ...
Establishment of Two Operating Rooms at AIIMS Mangalagiri, Andhra Pradesh
... cutouts for electrical, HVAC, and medical gas services, ...
Construction of Pre- Engineered Structure For conference room, restoration, renovation and interior of dining hall, vacant room and toilets at IIPA Building New Delhi.
B HVAC WORKS ₹ 1,132,689.01
Development of Central Tasar Nursery & Tasar Silk Park at Khuntagaon TRC, Lahunipada, Sundargarh
AC SYSTEM (HVAC WORKS)
Turnkey Works for Setting up a 2-bed paediatric Bone Marrow Transplant (BMT) unit at Regional Cancer Centre, Thiruvananthapuram
HVAC
Additional Works for the Setting up of Burns Care unit at DH Kollam District, Kerala
HVAC WORKS - AHU
REPAIR MAINT OF ELECTRICAL CONTROL SYSTEMS AND FILTERS OF CENTRAL AC PLANTS AHUs FCU CSUs COOLING TOWER CONDENSORS AND CONNECTED MISC WORKS AND REPAIR ROUTINE PREVENTIVE MAINT OF INVERTER NON INVERTER PACKAGE ACs DUCTABLE ACs INSTALLED AT INS VENDURU
... friendly vapor barrier for HVAC Chilled water pipe lines ...
REPAIR/MAINTENANCE OF AHU, COOLING TOWERS, DUCTS, INSULATION ETC OF CENTRAL AC PLANTS OF DIFFERENT CAPACITIES INCL CERTAIN CONNECTED WORKS IN EAST AND WEST WING TECH AREA AT AF STN GWALIOR
... for the fire detection or HVAC to trip / close in the event ...
Construction of Hospital First floor Phase-III in Anupuram Township.
... air distribution ducts for HVAC systems, complete in all respects. ...
Electrical (General) work in connection with "Provision of Dual MSDAC in place of DC Track Circuit in dual detection Mode at BZL Station".
... cable tray for the entire HVAC work with necessary brands, ...
SITC of VRF / VRV Type AC and Split-WAC in different locations in IIT Delhi (ACCR FEB 2026)
COOL EARTH HVAC ENGINEERS PRIVATE LIMITED (BID ID -3397248)
Providing(Supply, Installation, Testing, Commission) kitchen equipment and other Infrastructure facilities to 1st Floor of Office Complex (Indhana Bhavana) at Ananda Rao circle, Bengaluru.
... 59400.00 CPWD DSR E&M Vol. (HVAC Sub-head) 1. Mandev 2. Rajco ...
REPAIR AND MAINTENANCE OF SPLIT ACs WINDOW ACs TOWER ACs WATER COOLERS REFRIGERATORS OF VARIOUS CAPACITIES REPLACEMENT OF SPARE PARTS AND OTHER CONNECTED WORKS AT INS CHILKA UNDER GE CHILKA
... experience in (Ac,water cooler HVAC) in AC & Refrigeration field ...
CONSTRUCTION OF NEW BUILDING OF ICSI KANPUR CHAPTERS PREMISES AT SHATABDI NAGAR, KANPUR UP
AHU and Ductable HVAC System.
RENOVATION OF GUEST HOUSE AT GAIL ALAYA MINOR RENOVATION and SPACE OPTIMIZATION OF GAIL BHAWAN AND EXTERNAL DEVELOPMENTAL WORKS AT GAIL ASHIYANA
Dismantling of above false ceiling services consisting of HVAC duct , diffusers etc., including ...
Construction of Nava Raipur Sports Complex-Phase-2 works at Sector-28, Nava Raipur Atal Nagar, District-Raipur, Chhattisgarh(1ST CALL)
... Multifunctional meter (Type M) - 2 No. HVAC SYSTEM 630A, 4P, 415V, MCCB, 50kA ...
Providing and fixing MS grill, courtyard, MS shutter for cupboard in Boys Hostel and community kitchen in Mess Block at Sainik School, Rewari (Pdg. Modular kitchen only)
... for duct opening as per HVAC consultants, M.s.angles ...
SITC of office, IT equipments and Internet networking system related works
panel adjustments, lighting upgrades, and integration with HVAC/air‑conditioning systems or related
Khelo India Sports Governance and Sports Development Infrastructure Wing, JLN Stadium Phase-II, New Delhi
... third-party building management systems (HVAC, security, and other systems) ...
ADDN/ALTN TO BLDG NO P-06 (PARA-35) AT HQ NORTHERN COMMAND UNDER GE (UTILITIES) UDHAMPUR
... integration of building services like HVAC and fire detection/ fighting ...
PROPOSED CONSTRUCTION OF OLYMPIC ATHLETE KHASHABA JADHAV WRESTLING HALL AT GOLESHWAR , KARAD TAL- KARAD DIST.SATARA
HVAC PANELS VRF OUTDOOR UNIT... testing, commissioning of HVAC power Distribution panel... Per single line diagram. (HVAC PANEL FOR VRF/VRV OUTDOOR ...
SUB-HEAD- Civil Work including Electrical Work, Sanitary and Plumbing, Water Supply, Sewage and other Allied Works etc.
1 No. 630A 4P MCCB,36KA,PRMB with On/Off/Trip Indicator For HVAC
Construction and Campus Development for College of Homeopathic 100 Students with 50 bedded Hospital and Allied services such as Hospital, Staff Quarter etc. at Pimpalgaon Khurd Tal. Kagal Dist Kolhapur (Civil and Electrical)
... without overburdening the HVAC system. Filter Size: [Specify dimensions, ...
CONSTRUCTION OF COLLEGE OF FOOD TECHNOLOGY, At YAVATMAL, Under Dr. Panjabrao Deshmukh Krishi Vidyapeeth, Akola.
Sub Work - 4 : HVAC System:- Supplying, erecting, testing ...
REPAIR AND MAINT OF DEFECTIVE , BURNOUT AC, PUMPS, MOTORS AND OTHER RELATED ACCESSORIES AND OTHER MAINT WORKS AT MANKHURD, MAHUL SEWRI UNDER GE (NW) MANKHURD.
... technology advanced robotic HVAC duct cleaningto improve ...