MTPS I M I CA CWS II Unit III Replacement of 300 NB eroded corroded blow down pipes by fabricating and erection of new 300 NB MS ERW pipe and strengthening of bottom portion of sun shield roof in CT III
MTPSI TM I Unit III Annual Maintenance work in Main Turbine its Auxiliaries and Overhauling of Pennwalt Centrifuges 3A 3B during 2025 26
MTPS I BM Lift Breakdown Maintenance and Overhauling replacement of worn out Electrical and Mechanical parts including the replacement of the defective electrical accessories travelling cables and main ropes etc of Boiler Lift II
MTPS 1 BM Unit III AOH 2025 26 Procurement and erection of ID fan casing top portion Impeller wear plate and Casing wear plate Model NDZV 31 SIDOR in ID Fan 3A and 3B and other related works
MTPS-I ES Circle EM-II SD II CWPH -Disconnection connection of power cables star point for measuring DC resistance and IR value dismantling and assembling of Fan cover, fan grill for applying grease and cleaning of 3 Nos. 1175 KW, CWP HT motors
MTPS I TM Reconditioning of 3 Nos Cartridges of Boiler Feed Pump Model FK6D 30 Cartridge No P 86010 88016 P 86082 released from BFP 1A 2A 3C
MTPS I BM Unit III FG duct Dismantling fabrication supply and erection of portion of Flue gas ducts from APH outlet to 45 degree curve end B side during annual overhaul
MTPS-I ES EM-I SD-I Complete overhauling, replacement of worn out spares in 4 Nos. 415V 1600A Siemens make old version LT ACBs BMCC 1A IC breaker Sl.No002 BMCC 1B IC breaker Sl.No 003 BMCC 1A 1B Bus Coupler breaker Sl.No004 and Tie to NE SWGR
MTPS-I ES Circle EMI UnitI Rewinding Bearing replacement rotor refurbishment of 39KW TLOCBP motor Sl.No ADP50713 released from TLOCBP-1A bed bearing replacement, rotor refurbishment work of 37KW spare motor HCBP TLOCBP Sl.No ADP50561 at Unit-I MT
MTPS I TM I Unit III Cleaning inspection of Jack oil line pipes from bearing pedestals to jack oil pump renewal of packing clamps renewal of defective JOP pipe line and painting in Unit III during AOH 2025
MTPS I TM Unit III Complete overhauling and painting of Instrument Air Compressors IAC 3A 3C
MTPS I TM Unit III Overhauling of OLCTC System Pump LHS RHS Overhauling 1600 mm Butterfly valve and its actuator gear box of cooling water inlet and outlet pipe lines in condenser Inspection Cleaning of Condenser CW box steam side Hot well etc
MTPSI ES Circle EMII SDII CWPH Complete cleaning tightness checking of horizontal, vertical busbars, Incomer terminals and improving IR value of cooling water SWGR III, Auxillary Cooling water SWGR III and Cooling Tower SWGR III and painting of Swi
MTPS-I ES Circle EM-I UnitII i Disconnecting and reconnecting of HTLT terminal links for conducting annual testing and annual maintenance works of stationTransformer-II and C2 Incomer bus duct cleaning ii Complete cleaning, tightness checking of ho
MTPS I MM EM I Procurement of 150W High bay LED Fittings
Supply of Automatic Isoperibol Bomb Calorimeter
MTPS I MM EM I Procurement of Spares for SIEMENS make 7 point 2 KV Vacuum Circuit Breakers
MTPS I MM DM PLANT Supply of Pensky Martens Flash Point Apparatus semi automatic confirming ASTM D 93 and IS 1448 part I with necessary accessories
MTPS I MM EM II PROCUREMENT OF 200W SQUARE TYPE LED FLOODLIGHT FITTINGS
Supply and installation of CCTV cameras with all accessories
MTPS I MM MRT Procurement of On line Battery operated DC AC Control Cable Ground Fault DC leakage Locator including accessories
MTPS I MM T E Supply of WHATMAN make Cellulose Extraction Thimbles or equivalent
MTPS TM Unit III Removal of insulation and providing re insulation to pipe Lines valves Deaerator main flange Gland steam cooler Low pressure heater Flash tanks and its accessories and disposal of waste insulation materials for Unit III
MTPS I TM Unit III Overhauling of Beacon Rotork Ind modact actuator with Renewal of oil seals O rings wheel retainer ring replacing the defective worm wheel limit switch drive shaft checking the mechanism and oil filling during Unit III AOH 2025 26
MTPS I TM Unit III Air Compressor System Cleaning painting renewal of Manhole door gaskets and Overhauling of Safety valves of Receiver Tanks of 1 2 of Instrument Air System service air system and overhauling of Refrigerant Dryer etc
MTPS I TM Unit III Overhauling of TLOCBPs H2CBPs Hydrazine Dozing Pumps Phosphate Dozing Pumps during AOH of 2025 26
MTPS I MM AEE I EM II Supply of 90W 60W LED Street Light Fittings
MTPS I TM I Unit III Overhauling of Turbine lube Oil line valves SOP NRV hydraulic testing and gasket renewal in TLOC 3A 3B 3C during AOH 2025 26
MTPSI ES Circle EMII Boiler and Mill plant area Complete Overhaul of Vital LT Motors and releasing of power cables Neutral links for inspection refixing the power cables neutral links after cleaning the existing ID, FD ,PA coal Mill HT motors du
MTPS I MM AEE I MRT Supply of PVC Insulated copper Armoured LT control cable
MTPS-I ES Circle EM-I Unit-II Complete overhauling of 1 No 3500 KW 6.6 KV HT motor BFP-2A Sl.No 44201 T421 11 03 and 1 no 500 KW 6.6KV HT motor CEP 2B Sl.No 32203-A-404 01 2 during Annual overhaul 2025
MTPS-I ES Circle EMI SDII Complete overhauling of 12 Nos various capacities of LT critical motors during the Annual overhaul of Unit-II 2025
MTPS-I ES Circle EMI UnitIII Complete overhaul of 1 No 3500KW, 6.6KV HT Motor BFP-3B Sl.No 44201-T421-11-02 and 1 No. 500KW , 6.6 KV HT motor CEP-3A Sl.No 321 A404 01 04 during Unit III AOH 2025.
MTPS-I ES Circle EM-I Unit-I Complete cleaning, Tightness checking of horizontal, vertical bus bars, bus bar joints, outgoing terminals and checking IR value of 6.6 KV HT bus C1 and its Tie Bus duct and painting of C1 bus panels its Tie bus duct Ti
Supply of consumables for ERW Pipes with bends
MTPS-I ES Circle EM-IDismantling the defective BFP Cooler with nest attending the defect in the released BFP cooler and re-erection of the BFP cooler with nest in BFP motor for Unit-I to IV Dismantling the defective stator water cooler attending the
MTPS I MM AEE I C I Procurement of Process Loop Calibrator
MTPS I MM EM II Procurement of LED Street Light Fittings 2 Items
MTPS I CHP I Supply of 1 No Diesel driven van TATA SUMO or equivalent on hire basis for the official use of the Executive Engineer O AHS MTPS I
MTPS I CHP I Supply of 1 No Diesel driven vehicles having seating capacity of 10 persons including driver on hire basis for the official use of EE CHP I MTPS I
MTPS-I ES Circle EM-I Unit-III 1 Dismantling and reassembling of HTLT terminal links of any one Generator Transformer and any one UAT 2 Dismantling the terminals of any one Turbo generator Unit-I to IV for conducting statutory testing for a period
MTPS I MM EM II Supply of 1100 V grade FRLS PVC insulated LTUG Aluminium Armoured Power cable
MTPS-I ES Circle EM-I Maintenance of various capacity of Unit battery sets, Station battery sets RWPH battery sets by transporting DM water from DM plant to each unit battery room, station battery room and RWPH battery room, cleaning applying petro
MTPS I MM MRT Supply of Desktop model push button type telephone instruments
MTPS-I ES Circle EM-II SD-I Replacement of ID fan Motor, PA Fan Motor, FD Fan Motor and Mill Motor in any of the four Units due to Motor failure vibration problem during during the year 2025-26
supply of variable load Hanger Assembly 3 Items
MTPS-I ES Circle EM-II SD-I Complete overhau of coal Mill motor-3B Sl.No 46063 T401 31 04, 3C Sl.No 40708 A401 01 02 and 3F sl.No 46063 T401 31 01 BHEL make, 6.6KV, 340KW, 992 RPM - 3 nos. in Unit-III
Supply of M.S.ERW Pipes 350 NB7.01 mm thick with standard length of 10 m Plain pipe
Supply of 1800 mtr MS ERW 350 NB pipes 355mm OD 9.5 mm thick with standard length of 10 mtr