Loading…
Loading…
4,890 results • Latest
Supply of various sizes of Solid Silicon Rubber Balls
Supply of Stay Clamp 9.0Mtr 300Kgs suitable for PSC Pole
Supply of Back Clamp 9.0Mtr 300Kgs suitable for PSC Pole
Stay Clamp 8.0Mtr 200Kgs PSC Pole
Supply of Various sizes of soft iron sealing rings for valves _ 7 Items as per specification
Re_tubing of 1 No Vent Condenser Tube Nest of 210 MW LMW Design Turbine by 90_10 Cupro Nickel tubes as per the Material Specification
MTPS I Mill Plant Unit IV Complete dismantling and assembling of Mill internals reconditioning renewal of worn out parts bearings replacement of worn out worm wheel with worm shaft and renewal of worm gear hub etc in any one mill from 4A to 4F
MTPS I TM Unit I to IV Dismantling Cleaning and assembling of Main oil Tank filters and Centrifuges bowl assembly during 2026 27 for a period of One year from the date of commencement
MTPS I BM Pressure parts Units III and IV Boiler Annual maintenance of Boiler Pressure Parts for Oil gun cleaning soot blower operation cleaning and air washing of Boiler structures floor and allied works for the period of one year
MTPS I BM Pressure parts Units I and II Boiler Annual maintenance of Boiler Pressure Parts for Oil gun cleaning soot blower operation cleaning and air washing of Boiler structures floor and allied works for the period of one year